References
- Baker, B.M. (1997). "Cost/time trade-off analysis for the critical path method: A derivation of the network flow approach" J. Operational Res., 48(12), pp. 1241-1244. https://doi.org/10.1057/palgrave.jors.2600489
- Demeulemeester, E., De Reyck, B., Foubert, B., Herroelen, W., and Vanhoucke, M. (1998). "New computational results on the discrete time/ cost trade-off problem in project networks" J. Operational Res., 49(11), pp. 1153-1163. https://doi.org/10.1057/palgrave.jors.2600634
- Feng, C. W., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems" J. Comp. in Civ. Engrg., 11(3), pp. 184-189. https://doi.org/10.1061/(ASCE)0887-3801(1997)11:3(184)
- Feng, C. W., Liu, L., and Burns, S. A. (2000). "Stochastic construction time-cost trade-off analysis" J. Comp. in Civ. Engrg., 14(2), pp. 117-126. https://doi.org/10.1061/(ASCE)0887-3801(2000)14:2(117)
- Hegazy, T. (1999). "Optimization of construction timecost trade-off analysis using genetic algorithms" Can. J. Civ. Engrg., 26(6), pp. 685-697. https://doi.org/10.1139/l99-031
- Hegazy, T. and Ersahin, T. (2001). "Simplified spreadsheet solutions. II: Overall schedule optimization" J. Constr. Engrg. And Mgmt., 127(6), pp. 469-475. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:6(469)
- Hegazy, T. and Ayed, A. (1999). "Simplified spreadsheet solutions: Models for critical path method and Time-Cost-Tradeoff analysis" Cost Engrg., 41(7), pp. 26-33.
- Khang, D. B. and Myint, Y. M. (1999). "Time, cost and quality trade-off in project management: A case study" Int. J. Proj. Mgmt., 17(4), 249-256. https://doi.org/10.1016/S0263-7863(98)00043-X
- Kim, M. J., Park, M. S., Lee, H. S., Lee, J. H., and Lee, K. P. (2015) "Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm" Korean journal of Construction Engineering and Management, KICEM, 16(5), pp. 54-64. https://doi.org/10.6106/KJCEM.2015.16.5.054
- Leu, S. S. and Yang, C. H. (1999) "GA-based multicriteria optimal model for construction scheduling" J. Constr. Engrg. And Mgmt., 125(5), 420-427. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(420)
- Leu, S. S., Chen, A.T., and Yang, C. H. (2001). "GAbased fuzzy optimal model for construction timecost trade-off" Int. J. Proj. Mgmt., 19(1), pp. 47-58. https://doi.org/10.1016/S0263-7863(99)00035-6
- Li, H., Cao, J. N., and Love, P. (1999). "Using machine learning and GA to solve time-cost trade-off problems" J. Constr. Engrg. And Mgmt., 125(5), pp. 347-353. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:5(347)
- Li, H. and Love, P. (1997). "Using improved genetic algorithms to facilitate Time-Cost optimization" J. Constr. Eng. Manage, 123(3), pp. 233-237. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(233)
- Liu, L., Burns, S. A., and Feng, C. W. (1995). "Construction Tim-Cost Trade-Off Analysis Using LP/IP Hybrid Method" J. Constr. Engrg. And Mgmt., 121(4), pp. 446-454. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(446)
- Perera, S. (1980), "Linear Programming Solution to Network Compression", ASCE Journal of the Construction Division, 106, pp. 315-327.
- Ryu, H. G. and Kim, T. H. (2011) "Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model" Korean journal of Construction Engineering and Management, KICEM, 12(1), pp. 23-32. https://doi.org/10.6106/KJCEM.2011.12.1.23
- Stevens, J. D. (1990). Techniques for construction network scheduling. McGraw-Hill, New York.
- Winston, W (1997). Operations Research Applications and Algorithms.
- Hamdy A. Taha "Operations Research An Introduction" 4th Edition.
Cited by
- Simplifying the nonlinear continuous time-cost tradeoff problem vol.30, pp.4, 2017, https://doi.org/10.1007/s11424-017-5175-z