• 제목/요약/키워드: scaled model tunnel

검색결과 135건 처리시간 0.021초

Experimental verification for prediction method of anomaly ahead of tunnel face by using electrical resistivity tomography

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제20권6호
    • /
    • pp.475-484
    • /
    • 2020
  • The prediction of the ground conditions ahead of a tunnel face is very important, especially for tunnel boring machine (TBM) tunneling, because encountering unexpected anomalies during tunnel excavation can cause a considerable loss of time and money. Several prediction techniques, such as BEAM, TSP, and GPR, have been suggested. However, these methods have various shortcomings, such as low accuracy and low resolution. Most studies on electrical resistivity tomography surveys have been conducted using numerical simulation programs, but laboratory experiments were just a few. Furthermore, most studies of scaled model tests on electrical resistivity tomography were conducted only on the ground surface, which is a different environment as compared to that of mechanized tunneling. This study performed a laboratory experimental test to extend and verify a prediction method proposed by Lee et al., which used electrical resistivity tomography to predict the ground conditions ahead of a tunnel face in TBM tunneling environments. The results showed that the modified dipole-dipole array is better than the other arrays in terms of predicting the location and shape of the anomalies ahead of the tunnel face. Having longer upper and lower borehole lengths led to better accuracy of the survey. However, the number and length of boreholes should be properly controlled according to the field environments in practice. Finally, a modified and verified technique to predict the ground conditions ahead of a tunnel face during TBM tunneling is proposed.

관절형 허브 로터를 이용한 전진비행조건에서의 플래핑 운동에 대한 실험적 연구 (An Experimental Study on Flapping Motion of Forward Flight Condition used to Articulated Hub Rotor)

  • 이재하;백동민;이욱;최종수;송근웅
    • 한국항공우주학회지
    • /
    • 제41권4호
    • /
    • pp.261-267
    • /
    • 2013
  • 본 논문에서는 헬리콥터 전진비행 조건에서 플래핑모션에 대하여 축소 로터 실험을 통하여 실험결과와 이론적인 예측결과를 비교하였다. 축소로터 성능 실험은 충남대학교 아음속 풍동에서 수행하였으며 1.8 x 1.8m의 개방형 시험부를 사용하였다. 전진비행조건에서의 실험 결과에 의하면 축소로터의 전진비행조건에서의 추력 결과를 고정한 조건에서 동력계수는 차이가 있는 것을 확인 할 수 있었다. 또한, 공력 성능 측정 결과와 이론적인 예측결과의 비교를 통하여 헬리콥터의 플랩핑 각도의 범위에 대하여 비교하여 보았다. Coning 각도, 횡방향과 종방향에 대한 플래핑 각도에 대해서는 실험결과와 예측결과의 유사함을 확인하였다.

생체모방공학을 이용한 고속철도 차간 공간에 적용한 부엉이 깃 형상 크기에 따른 공력소음 저감 연구 (The Effect of Scaling of Owl's Flight Feather on Aerodynamic Noise at Inter-coach Space of High Speed Trains based on Biomimetic Analogy)

  • 한재현;김태민;김정수
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2012년도 춘계학술대회 논문집
    • /
    • pp.606-611
    • /
    • 2012
  • An analysis and design method for reducing aerodynamic noise in high-speed trains based on biomimetics of noiseless flight of owl is proposed. Wind tunnel testing and numerical CFD (Computational Fluid Dynamics) simulation for the basic inter-coach spacing model are carried out, and their results compared. To determine the effect of scaling of the owl's flight feather on the noise reduction, two-fold and a four-fold scaled up model of the feather are constructed, and the numerical simulations are carried out to obtain the aerodynamic noise levels for each scale. Original model is found to reduce the noise level by 10 dB, while two-fold increase in length dimensions reduces the noise by 12 dB. Validation of numerical solution using wind tunnel experimental measurements are presented as well.

  • PDF

근접병설터널의 안정성 평가를 위한 모형실험 연구 (Scale Model Studies for Stability Estimation of Twin Tunnels with Small Clearance)

  • 김평기;김종우
    • 터널과지하공간
    • /
    • 제23권2호
    • /
    • pp.130-140
    • /
    • 2013
  • 본 연구에서는 $30^{\circ}$ 경사진 층리면을 가진 풍화암 물성의 이방성 암반에서 필러 폭이 0.5D와 0.25D로 매우 작은 근접병설터널을 시공할 경우에 대한 터널 안정성을 조사하였다. 이를 위해 터널간 이격거리와 지보조건이 서로 다른 6가지 모형을 제작하고 측압계수 1의 하중조건으로 축소모형실험을 실시하였다. 모형별 균열개시압력, 최대압력, 필러 및 터널의 변형거동을 조사하였으며, 복공지보와 필러보강 여부가 터널의 안정성에 미치는 영향을 알아보았다. 필러 폭이 큰 모형일수록 균열개시압력이 더 크게 나타나 터널 안정성은 증가하였으며, 복공지보를 설치한 모형은 무지보 모형에 비해 균열개시압력와 최대압력이 더 크고 내공단면의 변형량은 적어 풍화암 근접병설터널에서 복공지보의 필요성을 확인하였다. 복공지보와 더불어 필러보강을 실시한 모형은 다른 모형에 비해 터널 안정성이 더 크게 나타났으며, 특히 필러 폭 0.25D인 근접병설터널은 복공지보뿐 아니라 필러보강도 실시해야 터널 안정성이 확보됨을 알 수 있었다.

모형실험을 통한 공동규모와 절리 방향성에 따른 공동배면의 응력전이 특성에 대한 연구 (A Study on the Characteristics of Stress Transfer around Cavern due to Cavern size and Rock Joint Orientation by Laboratory Model Test)

  • 김상환;신범석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.595-606
    • /
    • 2009
  • This paper presents the characteristics of stress transfer around carven due to cavern size and rock joint properties by laboratory model test. In order to perform this study, eight different scaled model tests were carried out according to excavation stage. The limited numerical analysis were also performed to verify the model test results. The amount of stress transfer around the cavern is increased and then decreased by longitudinal arching effect according to tunnel excavation. It is founded that the stress developed around the cavern during excavation is increased when the cavern size and joint orientation are increased. It is also investigated that shear behaviour (such as stress, deformation) developed around cavern is considerably depended on the characteristic of fill material, dip and direction of joints. It is suggested that the behaviour will be verified throughout the 3D numerical prediction.

  • PDF

Validation of the numerical simulations of flow around a scaled-down turbine using experimental data from wind tunnel

  • Siddiqui, M. Salman;Rasheed, Adil;Kvamsdal, Trond
    • Wind and Structures
    • /
    • 제29권6호
    • /
    • pp.405-416
    • /
    • 2019
  • Aerodynamic characteristic of a small scale wind turbine under the influence of an incoming uniform wind field is studied using k-ω Shear Stress Transport turbulence model. Firstly, the lift and drag characteristics of the blade section consisting of S826 airfoil is studied using 2D simulations at a Reynolds number of 1×105. After that, the full turbine including the rotational effects of the blade is simulated using Multiple Reference Frames (MRF) and Sliding Mesh Interface (SMI) numerical techniques. The differences between the two techniques are quantified. It is then followed by a detailed comparison of the turbine's power/thrust output and the associated wake development at three tip speeds ratios (λ = 3, 6, 10). The phenomenon of blockage effect and spatial features of the flow are explained and linked to the turbines power output. Validation of wake profiles patterns at multiple locations downstream is also performed at each λ. The present work aims to evaluate the potential of the numerical methods in reproducing wind tunnel experimental results such that the method can be applied to full-scale turbines operating under realistic conditions in which observation data is scarce or lacking.

Measurement of aerodynamic coefficients of tower components of Tsing Ma Bridge under yaw winds

  • Zhu, L.D.;Xu, Y.L.;Zhang, F.;Xiang, H.F.
    • Wind and Structures
    • /
    • 제6권1호
    • /
    • pp.53-70
    • /
    • 2003
  • Tsing Ma Bridge in Hong Kong is the longest suspension bridge in the world carrying both highway and railway. It has two H-shape concrete towers, each of which is composed of two reinforced concrete legs and four deep transverse prestressed concrete beams. A series of wind tunnel tests have been performed to measure the aerodynamic coefficients of the tower legs and transverse beams in various arrangements. A 1:100 scaled 3D rigid model of the full bridge tower assembled from various tower components has been constructed for different test cases. The aerodynamic coefficients of the lower and upper segments of the windward and leeward tower legs and those of the transverse beams at different levels, with and without the dummy bridge deck model, were measured as a function of yaw wind angle. The effects of wind interference among the tower components and the influence of the bridge deck on the tower aerodynamic coefficients were also investigated. The results achieved can be used as the pertinent data for the comparison of the computed and field-measured fully coupled buffeting responses of the entire bridge under yaw winds.

축소 모형시험과 개별 요소 해석에 의한 원형 공동 주변의 점진적 취성파괴 특성에 관한 연구 (Characteristics of the Progressive Brittle Failure around Circular Opening by Scaled Model Test and Discrete Element Analysis)

  • 전석원;박의섭;배성호
    • 터널과지하공간
    • /
    • 제15권4호
    • /
    • pp.250-263
    • /
    • 2005
  • 암반 내 형성된 과도한 초기응력장은 굴착 공동 주변에 점진적이고 국부적인 취성파괴를 유발시킴으로서 시공의 안정성과 경제성을 확보하는데 장애 요인으로 작용할 수 있다. 이 논문에서는 응력 수준 증가에 따른 공동 주변의 취성파괴 거동 특성을 파악하기 위해 축소된 원형 터널 공시체를 이용한 이축압축시험과 입자 결합 모델을 이용하여 개별요소법의 일종인 $PFC^{2D}$ 해석에 의한 연구를 수행하였다. 실내 이축압축시험을 통해 취성파괴의 발생 영역과 형태 면에서 실제 암반 공동 주변에서 발생된 파괴 특성과 유사한 파괴 거동을 모사할 수 있었다. 응력 강도비 증가에 따라 진행된 균열 발전단계를 미소파괴음 특성 변수들에 대한 상세 분석을 통해 평가하였다. $PFC^{2D}$ 해석을 통해 공동 주변에서의 미세 균열 발생과 전파 과정을 성공적으로 가시화하였으며 이를 통해 이축 압축시험 결과의 신뢰성과 시험방법의 적정성을 확인할 수 있었다.

모형시험과 개별요소법을 이용한 단면 형상에 따른 공동 주변 취성파괴에 관한 연구 (A Study on the Stress Induced Brittle Failure around Openings with Cross-sectional Shape by Scaled Model Test and DEM Simulation)

  • 배성호;전석원;박의섭
    • 터널과지하공간
    • /
    • 제17권5호
    • /
    • pp.389-410
    • /
    • 2007
  • 불연속면의 빈도가 높지 않은 견고한 암반의 경우 굴착시 공동 주변 영역에서의 파괴나 변형 특성은 형성되어 있는 초기응력 조건과 강도 특성에 절대적인 영향을 받는다. 과도한 초기응력장은 굴착 공동 주변에 점진적이고 국부적인 취성파괴를 유발시킴으로서 시공의 안정성과 경제성을 확보하는데 장애요인으로 작용할 수 있다. 이 논문에서는 응력 수준과 터널형상에 따른 공동 주변의 취성파괴 거동 특성을 파악하기 위해 축소된 터널 시험체를 이용한 이축압축시험과 입자 결합모델을 이용한 개별요소법의 일종인 $PFC^{2D}$ 해석에 의한 연구를 수행하였다. 실내 이축압축시험을 통해 취성파괴의 발생 영역과 형태 면에서 실제 암반 공동 주변에서 발생된 파괴 특성과 유사한 파괴 거동을 모사할 수 있었다. 모형시험체에 대한 이축압축시험 결과 최소 주응력 방향의 공동 단면 곡선부에서는 균열이 표면에서 개시된 후 내부로 진행되어 국부적인 노치형 파괴영역이 형성되었다. 이에 비해 모서리와 직선부의 경우 공벽 표면과 내부에서 발생된 균열들의 상호 연결, 결합에 의해 대규모의 노치형 분리면이 유도되고 곡선부에 비해 큰 파괴영역이 형성되는 것으로 조사되었다.

프리스트레스 및 강관보강 그라우팅을 이용한 터널 필라부 보강공법의 적용성 검토를 위한 축소모형 실험 (Reduced model experiment to review applicability of tunnel pillar reinforcement method using prestress and steel pipe reinforcement grouting)

  • 김연덕;이수진;이평우;윤홍수;김상환
    • 한국터널지하공간학회 논문집
    • /
    • 제24권6호
    • /
    • pp.495-512
    • /
    • 2022
  • 본 연구에서는 프리스트레스와 그라우팅을 이용한 터널 필라부 보강공법에 대해 검토하였다. 병설터널의 문제점을 보완할 수 있는 보강법들은 다양하지만 프리스트레스와 그라우팅을 이용한 터널 필라부 공법이 현장적용성, 안정성, 경제성에서 우수하다고 판단됨에 따라 실질적인 거동 메커니즘의 이론적 검토 및 수치해석적 검토가 필요하기 때문에 축소모형 실험을 진행하였다. 축소모형 실험은 PC강연선 + 강관보강 그라우팅 + 프리스트레스(Case 1), PC강연선 + 강관보강 그라우팅(Case 2), 무보강(Case 3)으로 나누어 필라부의 변위와 벽체에 가해지는 토압을 측정하였다. 실험을 통하여 여러 공법 중 PC강연선 + 강관보강 그라우팅 + 프리스트레스 공법은 가장 우수한 보강공법임을 확인하였고 추후 현장실험을 통해 이를 검증하고 보완해 나간다면 현재 적용되는 보강공법보다 변위 제어 및 부재력 측면에서 우수한 결과를 도출해 낼 수 있을 것이라 판단되었다.