• Title/Summary/Keyword: safety risk

Search Result 5,998, Processing Time 0.03 seconds

Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method (FMECA 기법을 적용한 건설현장 거푸집작업의 통합 안전위험성 평가 및 대응방안 마련)

  • An, Sun-Ju;Song, Sang-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.39-48
    • /
    • 2012
  • Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.

Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

  • Zalk, David M.;Spee, Ton;Gillen, Matt;Lentz, Thomas J.;Garrod, Andrew;Evans, Paul;Swuste, Paul
    • Safety and Health at Work
    • /
    • v.2 no.2
    • /
    • pp.105-121
    • /
    • 2011
  • Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

The Development of a Risk Management System in the Field of Industrial Safety in the Republic of Kazakhstan

  • Kudryavtsev, Sergey S.;Yemelin, Pavel V.;Yemelina, Natalya K.
    • Safety and Health at Work
    • /
    • v.9 no.1
    • /
    • pp.30-41
    • /
    • 2018
  • Background: The purpose of the work is to develop a system that allows processing of information for analysis and industrial risk management, to monitor the level of industrial safety and to perform necessary measures aimed at the prevention of accidents, casualties, and development of professional diseases for effective management of industrial safety at hazardous industrial sites. Methods: Risk assessment of accidents and incidents is based on expert evaluations. Based on the lists of criteria parameters and their possible values, provided by the experts, a unified information and analytical database is compiled, which is included in the final interrogation questionnaires. Risk assessment of industrial injuries and occupational diseases is based on statistical methods. Results: The result of the research is the creation of Guidelines for risk management on hazardous industrial sites of the Republic of Kazakhstan. The Guidelines determine the directions and methods of complex assessment of the state of industrial safety and labor protection and they could be applied as methodological basis at the development of preventive measures for emergencies, casualties, and incidents at hazardous industrial sites. Conclusion: Implementation of the information-analytical system of risk level assessment allows to analyze the state of risk of a possible accident at industrial sites, make valid management decisions aimed at the prevention of emergencies, and monitor the effectiveness of accident prevention measures.

A Study on Factory Building Fire Risk Reduction Management (공장건물의 화재리스크 경감방안에 관한 연구)

  • Chung, Eui-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.43-53
    • /
    • 2008
  • This study is carried out for the fire safety of the factory building, the fire risk reduction measure in compliance with an example approached in fire risk reduction systematically, contribute to reduce the fire risk. The analytical fire risk process of discovering, identifying, estimating and evaluating risk and control measure as risk reduction measures are core concept, applies loss prevention with loss control techniques. The painting process in the workplace where the fire hazard and death accident accompanies coexists. Loss prevention problem of creation prevention of dangerous atmosphere at workplace is health and human services problem of normal circumstances, must be inspected with problem of combustible gases at the time of fire explosion. Static electricity measure accomplished the risk control process thoroughly as the fire risk reduction process model with the ignition sources measure which is presented. Fire risk from within organizing will be able to classify with each field by detailedly but risk treatment process will be able to apply basically all the same concept. Consequently about risk management example from before, this study is proposed risk management techniques that standardized rightly in the actual condition of organization with one plan, with discovery of fire risk, the feedback process in compliance with a fire risk reduction and the review which control the result is joint responsibility of engineer, technical expert and manager as part of safety management to practice with the fact must be supervised.

Risk Analysis Method Applied to Train Control Systems for Safety Assurance (열차제어시스템 안전성 확보를 위한 위험도 분석 방법 적용)

  • Jo, Hyun-Jeong;Hwang, Jong-Gyu
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.71-76
    • /
    • 2007
  • Failures of equipments for train control systems are linked directly to extensive damages of human lives or financial losses from the increasing uses of train control equipments utilizing computers. Then safety activities for assuring safety and reliability are needed during the system life-cycle. Risk analysis is important phase to increase safety from determining the risk presented by the identified hazard. In this paper, we investigated several methods for risk estimation of safety activities, and then we drew a comparison between original methods to suggest optimized one in the application to train control systems. In the result of the comparison, we had plan to propose the risk analysis method called Best-Practice(BP) risk method combining advantages of the qualitative and the quantitative analysis. In addition, we attempted to apply the BP-risk method to domestic train control systems handling in Korea.

A Study on a Product Safety Management Program Based on Risk Management Standards (리스크 관리규격에 기초한 제품안전 경영 프로그램에 대한 연구)

  • Lee, Dhong-Ha;Na, Yoon-Gyun;Kim, Myung-Soo
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.94-102
    • /
    • 2003
  • This study proposed a method to apply risk management standards to a product safety management program and reviewed cases where a risk management cycle is applied to the product safety management program. Comparing the four product safety management programs suggested by several authors yielded common features of the risk management cycle: (1) organization for product safety, (2) risk identification, (3) risk evaluation, (4) risk treatment, (5) monitoring/communication, and (6) documentation. A Japan company(Ricoh)'s case showed that the risk management cycle to treat product liability risks can be used as a successful product safety management program.

A Study on the Review of Risk Concepts (리스크의 개념에 대한 고찰)

  • Kim, Jin Hyun;Park, Dal Jae
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.6
    • /
    • pp.90-96
    • /
    • 2013
  • Since the last 50 years, the terminology 'risk' has been widely used in general and industrial applications, with different meanings. The different definitions of risk can lead to the different risk assessments and risk management process elements, and the misunderstandings. For the reasons, the ISO(International Standard Organization) has recently defined a new risk concept through the publication of IS0 31000:2009. Although the new concept of risk was globally accepted, it seem to be argued in its definition debate. Thus, this paper reviews the definition and meaning of the concept of risk in terms of risk origin, general and industrial applications, related domestic laws and risk management standards published to improve an understanding of risk concept.

A Development on the Safety Management Information System in Building Work (빌딩공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.20 no.4 s.72
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

A Study on Safety Improvement for Packaged Hydrogen Refueling Station by Risk Assessment (위험성 평가를 통한 패키지형 수소충전소 안전성 향상에 관한 연구)

  • KANG, SEUNGKYU;HUH, YUNSIL;MOON, JONGSAM
    • Journal of Hydrogen and New Energy
    • /
    • v.28 no.6
    • /
    • pp.635-641
    • /
    • 2017
  • In this study, the components of packaged hydrogen filling station were analyzed and risk factors were examined. Risk scenarios were constructed and quantitative risk assessments were conducted through a general risk assessment program (phast/safeti 7.2). Through the risk assessment, the range of damage according to accident scenarios and the ranking that affects the damage according to the risk factors are listed, and scope of damage and countermeasures for risk reduction are provided. The quantitative risk assessment result of the packaged hydrogen filling station through this task will be used as the basic data for improving the safety of the packaged filling system and preparing safety standards.