• Title/Summary/Keyword: safety cost

Search Result 2,744, Processing Time 0.033 seconds

Safety Assessment of Reinforced Concrete Members by Expected Total Cost Minimization (총기대비용최소화에 의한 R.C부재의 안전도 평가)

  • 이증빈;손용우;박주원
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1994.10a
    • /
    • pp.152-159
    • /
    • 1994
  • One of the main objectives of the study is to propose a pratical and realistic reliability analysis by ETCM(Expected Total Cost Minimization). This study is intended to propose the safety assesment and capacity rating of existing reinforced concrete members by evaluating the safety evaluation index, that is RF(Rating Factor) from the results of the field test and inspection for 5 reinforced concrete bridges. ETCM method is used for the reliability analysis of the proposed models. The proposed reliability model and method are applied the safety assesment and system factors of reinforced concrete members.

  • PDF

Development of Destination Optimal Path Search Method Using Multi-Criteria Decision Making Method and Modified A-STAR Algorithm (다기준의사결정기법과 수정 A-STAR 알고리즘을 이용한 목적지 최적경로 탐색 기법 개발)

  • Choi, Mi-Hyeong;Seo, Min-Ho;Woo, Je-Seung;Hong, Sun-Gi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.891-897
    • /
    • 2021
  • In this paper, we propose a destination optimal route algorithm for providing route finding service for the transportation handicapped by using the multi-criteria decision-making technique and the modified A-STAR optimal route search algorithm. This is a method to set the route to the destination centering on safety by replacing the distance cost of the existing A-STAR optimal route search algorithm with the safety cost calculated through AHP/TOPSIS analysis. To this end, 10 factors such as road damage, curb, and road hole were first classified as poor road factors that hinder road driving, and then pairwise comparison of AHP was analyzed and then defined as the weight of TOPSIS. Afterwards, the degree of driving safety was quantified for a certain road section in Busan through TOPSIS analysis, and the development of an optimal route search algorithm for the transportation handicapped that replaces the distance cost with safety in the finally modified A-STAR optimal route algorithm was completed.

A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost (표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

The Algorithm of Improvement of Production cost using Function based cost estimating (기능 분석에 따른 제품 원가 구조개선 알고리즘에 대한 연구)

  • Seo, Ji-Han;Lee, Jea-Myung;La, Seung-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.207-213
    • /
    • 2010
  • Now days, the marketing environment is rapidly changed. Therefore, a lot of companies try to reduce production cost. Especially, Design is a important activities in new product development. While the concepts of design for manufacturable and concurrent engineering have made significant advances in integrating the design function with other areas in the firm. There are still major gaps in timely and accurate costing information available to designers. Inappropriate design could result in high redesign cost and delay in product relation. The generation of design and improvement is a time-consuming and mentally exhaustion process. It involves combining design features to generate as many potential design as possible. As not all features combinations are feasible, decision-makers have to narrow down the potential solutions and subsequently select appropriate design for further development. This new study is composed of 3 steps aiming at the Low Cost Design of the product. The three steps are consisted that setting up the target Cost, estimating the current functional cost, the design of a unit's reviewing according to the priority of the difference between the target cost and the functional cost.

A case for productivity improvement by time study in high tech industry (하이테크 부품산업에서 작업분석/실행을 통한 생산성 향상의 프로젝트 방법론 연구)

  • Lee, Won-Jae;kim, Joong-Hoi;Kang, Sung-Woo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.1
    • /
    • pp.225-230
    • /
    • 2015
  • Productivity is the essential comparative advantage in high tech industry company in 21 century. These company endless endeavor for low cost production. Low cost production can be led by low facility operation cost and low labor cost. But reducing facility operation cost arise much investment. Thus many high tech company drive reduction of labor cost. These article suggest model for reducing labor cost and prove a effect by example of some company.

An unwanted facility location problem with negative influence cost and transportation cost (기피비용과 수송비용을 고려한 기피시설 입지문제)

  • Yang, Byoung-Hak
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.77-85
    • /
    • 2013
  • In the location science, environmental effect becomes a new main consideration for site selection. For the unwanted facility location selection, decision makers should consider the cost of resolving the environmental conflict. We introduced the negative influence cost for the facility which was inversely proportional to distance between the facility and residents. An unwanted facility location problem was suggested to minimize the sum of the negative influence cost and the transportation cost. The objective cost function was analyzed as nonlinear type and was neither convex nor concave. Three GRASP (Greedy Randomized adaptive Search Procedure) methods as like Random_GRASP, Epsilon_GRASP and GRID_GRASP were developed to solve the unwanted facility location problem. The Newton's method for nonlinear optimization problem was used for local search in GRASP. Experimental results showed that quality of solution of the GRID_GRASP was better than those of Random_GRASP and Epsilon_GRASP. The calculation time of Random_GRASP and Epsilon_GRASP were faster than that of Grid_GRASP.

A study on the logistics cost reduction in textile industries by introducing Pad Pool System (PPS(PAD POOL SYSTEM) 도입에 의한 섬유업계 물류비 절감에 관한 연구)

  • Kwon An Sik;Park In Sul
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.2
    • /
    • pp.95-106
    • /
    • 2005
  • Many Korean companies are challenged to reduce logistics cost and meet environmental-friendly logistics. The textile companies in harsh competition are requested to make improvement on their logistics environment to cut down the total cost. However, they have reached the limit on improving the manufacturing process. We believe that the logistics department is the most improvable part at present. Improving logistics will be highly effective to cut down the total cost. In this study, we present Pad Pool System(PPS) as the solution to save their logistics cost. PPS, which means the shared use of Styrofoam pads, will enable the textile companies to cut down their cost and strengthen enterprise competitiveness. Also, PPS will be helpful reducing environmental disruption because the system reuses retrieved Styrofoam pads many times.

Development of maintenance cost estimation method considering bridge performance changes (교량 성능변화를 고려한 유지관리비용 추계분석 방법 개발)

  • Sun, Jong-Wan;Lee, Huseok;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.717-724
    • /
    • 2018
  • To prepare for the explosive increase in maintenance costs of bridges according to the aging of infrastructure, future maintenance costs of bridges should be predicted. For this purpose, the management status of bridges was investigated and modeled as the upper limit of the performance level and the target management level according to the life cycle. This paper proposes methodologies and procedures for estimating the bridge maintenance costs using two models and existing cost and performance prediction models that consist of unit repair cost model according to the safety score, performance degradation model of bridges, unit reconstruction cost, and average reconstruction time. To verify the applicability, future maintenance costs can be forecasted for specific management agency considering the number of bridges, degree of aging, and current management status. As a result, it is possible to obtain the maintenance cost and safety level of an individual bridge level for each year. In addition, by summing them up to the agency level, the average safety score, ratio of the safety level, inspection costs, repair costs, and reconstruction costs can be obtained. In a further study, the changes in maintenance costs can be analyzed according to the changes in the target management levels using the developed method. The optimal management level can be suggested by reviewing the results.

Fundamental Stress Analysis for a Development of the Safety Block

  • Kang, Ji-Woong;Kim, Sang-Tae
    • International Journal of Safety
    • /
    • v.11 no.2
    • /
    • pp.1-4
    • /
    • 2012
  • The falling accidents have increased in the structure and heavy industries. Therefore, a various falling prevention systems with safety block and lanyard have been supplied in order to prevent falling accidents and acquire the long life and cost down for the maintenance. However, there are not the reliable and domestic the falling prevention system until now. Almost systems were imported from U.S.A, Japan, U.K and Germany. The structural safety of the imported safety block is satisfied sufficiently, but it has heavy weight due to the cover with the aluminum and thickness. So, many workers are not feeling themselves. Thus, the aim of this work is to develop a commercial safety block that has a light weight and strength. And the cost efficiency of the system and safety for workers also will be improved remarkably.

Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase (시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안)

  • Lee, Jae-Hyun;Jeong, Jae-Wook;Jeong, Jae-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF