• Title/Summary/Keyword: roof work

Search Result 132, Processing Time 0.023 seconds

Grand M Hotel interior renovation (포항 Grand M Hotel, 리노베이션 계획안)

  • Kim, Hye-Ja
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.97-98
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997 Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

Reliability analysis of shallow tunnel with surface settlement

  • Yang, X.L.;Li, W.T.
    • Geomechanics and Engineering
    • /
    • v.12 no.2
    • /
    • pp.313-326
    • /
    • 2017
  • Based on the reliability theory and limit analysis method, the roof stability of a shallow tunnel is investigated under the condition of surface settlement. Nonlinear Hoek-Brown failure criterion is adopted in the present analysis. With the consideration of surface settlement, the internal energy and external work are calculated. Equating the rate of energy dissipation to the external rate of work, the expression of support pressure is derived. With the help of variational approach, a performance function is proposed to reliability analysis. Improved response surface method is used to calculate the Hasofer-Lind reliability index and the failure probability. In order to assess the validity of the present results, Monte-Carlo simulation is performed to examine the correctness. Sensitivity analysis is used to estimate the influence of different variables on reliability index. Among random variables, the unit weight significantly affects the reliability index. It is found that the greater coefficient of variation of variables lead to the higher failure probability. On the basis of the discussions, the reliability-based design is achieved to calculate the required tunnel support pressure under different situations when the target reliability index is obtained.

A Study on the Placeness and the Plasticity of the Chapel and Exhibition Hall of Chuldu-san Holy Place (절두산 성당의 장소성과 조형성 연구)

  • Jung, In-Ha
    • Journal of architectural history
    • /
    • v.9 no.1 s.22
    • /
    • pp.47-64
    • /
    • 2000
  • The Chapel and Exhibition hall of Chul-du-san-Holy place are considered as the most important work of architect Lee Hee-Tai (1925-1980), and as a work representing Korean architecture in 1960's. What is the reason that these buildings can acquire such a remarkable estimation? This study tries to make clear this reason with an analytic method. These buildings are situated in singular site, in which small mountain comes up alongside with Han-river. Architect laid out the Chapel and Exhibition hall to the memory of 108 saints who died for their faith in this mountain, considering the specificity of the site, the direction of approach stair, and the formation of public space. Architect proposes an opposed composition of form for these two buildings. So the Exhibition hall is characterized by trabeated structure, centripetal force and Apollonian order. It has strictly proportioned facade, which is composed of two 15m-by-l5m squares and subdivided equally in three portions. The Chapel is charaterized by arcuated structure, centrifugal force, and Dionysosian sentiment. In this work, architect Lee Hee-Tai also expressed the locality of Korean architecture with the grammar of column-roof.

  • PDF

Catastrophe analysis of active-passive mechanisms for shallow tunnels with settlement

  • Yang, X.L.;Wang, H.Y.
    • Geomechanics and Engineering
    • /
    • v.15 no.1
    • /
    • pp.621-630
    • /
    • 2018
  • In the note a comprehensive and optimal passive-active mode for describing the limit failure of circular shallow tunnel with settlement is put forward to predict the catastrophic stability during the geotechnical construction. Since the surrounding soil mass around tunnel roof is not homogeneous, with tools of variation calculus, several different curve functions which depict several failure shapes in different soil layers are obtained using virtual work formulae. By making reference to the simple-form of Power-law failure criteria based on numerous experiments, a numerical procedure with consideration of combination of upper bound theorem and stochastic medium theory is applied to the optimal analysis of shallow-buried tunnel failure. With help of functional catastrophe theory, this work presented a more accurate and optimal failure profile compared with previous work. Lastly the note discusses different effects of parameters in new yield rule and soil mechanical coefficients on failure mechanisms. The scope of failure block becomes smaller with increase of the parameter A and the range of failure soil mass tends to decrease with decrease of unit weight of the soil and tunnel radius, which verifies the geomechanics and practical case in engineering.

Study on the Design Automation of Steel House Shop drawing (스틸하우스 설계 자동화의 필요성과 적용방법에 관한 연구)

  • Won, Wan-Youn;Park, Hyeon-Soo
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.103-106
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997. Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

Evaluation of seismic assessment procedures for determining deformation demands in RC wall buildings

  • Fox, Matthew J.;Sullivan, Timothy J.;Beyer, Katrin
    • Earthquakes and Structures
    • /
    • v.9 no.4
    • /
    • pp.911-936
    • /
    • 2015
  • This work evaluates the performance of a number of seismic assessment procedures when applied to a case study reinforced concrete (RC) wall building. The performance of each procedure is evaluated through its ability to accurately predict deformation demands, specifically, roof displacement, inter-storey drift ratio and wall curvatures are considered as the key engineering demand parameters. The different procedures include Direct Displacement-Based Assessment, nonlinear static analysis and nonlinear dynamic analysis. For the latter two approaches both lumped and distributed plasticity modelling are examined. To thoroughly test the different approaches the case study building is considered in different configurations to include the effects of unequal length walls and plan asymmetry. Recommendations are made as to which methods are suited to different scenarios, in particular focusing on the balance that needs to be made between accurate prediction of engineering demand parameters and the time and expertise required to undertake the different procedures. All methods are shown to have certain merits, but at the same time a number of the procedures are shown to have areas requiring further development. This work also highlights a number of key aspects related to the seismic response of RC wall buildings that may significantly impact the results of an assessment. These include the influence of higher-mode effects and variations in spectral shape with ductility demands.

Estimation of 3D active earth pressure under nonlinear strength condition

  • Zhang, D.B.;Jiang, Y.;Yang, X.L.
    • Geomechanics and Engineering
    • /
    • v.17 no.6
    • /
    • pp.515-525
    • /
    • 2019
  • The calculation of active earth pressure behind retaining wall is a typical three-dimensional (3D) problem with spatial effects. With the help of limit analysis, this paper firstly deduces the internal energy dissipation power equations and various external forces power equations of the 3D retaining wall under the nonlinear strength condition, such as to establish the work-energy balance equation. The pseudo-static method is used to consider the effect of earthquake on active earth pressure in horizontal state. The failure mode is a 3D curvilinear cone failure mechanism. For the different width of the retaining wall, the plane strain block is inserted in the symmetric plane. By optimizing all parameters, the maximum value of active earth pressure is calculated. In order to verify the validity of the new expressions obtained by the paper, the solutions are compared with previously published solutions. Agreement shows that the new expressions are effective. The results of different parameters are given in the forms of figures to analysis the influence caused by nonlinear strength parameters.

A Study on the House of the Gentry (士大夫) in the late 16th Century -Centering around Ryu, Hee-Choon's Diary(Miam-Ilgicho) (16세기말(世紀末) 사대부가(士大夫家) 객청(客廳) 조영사례(造營事例) 연구(硏究) -유희춘(柳希春)의 "미암일기초(眉巖日記草)"를 중심(中心)으로-)

  • Lee, Ho-Yeol
    • Journal of architectural history
    • /
    • v.1 no.2 s.2
    • /
    • pp.9-38
    • /
    • 1992
  • In the study the documents in Ryu Hee-Choon's diary (Miahm-Ilgicho) from Oct. 29th 1575 to Feb. 9th 1577, for Kaeg-Chung(客聽) are arranged and analized. Ryu, Hee-Choon (Mi-ahm) was a civil minister in the era of Myung-Jong to Sun-Jo of the Chosun dinasty. This study would be one of the basal material for actually inquiring into the character of houses for the gentry in the late 16th century. Above all, the significance of this is that it study could show the details of the architectural economy, the organization of architectural society and the process of the supply of architectural material at that time. Craftsmen devoting themselves to this work are carpenters, artisans making roof titles, roofers and artisans constructing walls. And the content that are craftsmen of monks(僧匠), artisans of commoners(私匠) and slaves belong to government(官奴) is noticeable thing. In this construction work, monks in temples of the region and laboures commandeered by the government office are mainly mobilized. Except of them, private slaves and commoners mobilized by government office also devoted themselves to this work. But, it required more research whether this aspect could be the general character of the construction work of the gentry in the late 16th century. Architectural material, in the case of wood was cut and transported mostly from islands like Jin-do by labourers commandeered by the head officer of the region and monks. Superintendents seemed to come be non-specialists of noble families of the ruling class. So, it is thought that they managed mainly the manpower supply and administration. And some architectural ironworks, much provisions and marine products for labourers and craftsmen were proided by the government office of the region. This could be understood in the same context as above that goverment office of the region contributed to commandeering labourers and supplying architectural material in some degree. Carpenters and roofers took wages that is, about 7.7 pils(匹) of cotton cloth for each carpenter and 5 pils of cotton cloth and some provisions for each roofer. This would be a noticeable thing for researching wages of craftsmen at that time

  • PDF

Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

A Study for Analyzing Life Cycle Cost of Membrane Water-proofing of Roof - Focused on precaution for securing quality - (건축공사 옥상 도막방수 공법의 LCC 분석 - 품질확보를 위한 사전대책을 중심으로 -)

  • Bae, Jae-Wook;Shin, Seung-Moon;Kim, Sang-Gap;Koo, Choong-Wan;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.57-65
    • /
    • 2008
  • As the society is being developed, the desire about life quality is also growing. Even though the process of waterproof work has very close relation with these life quality, we always focus on management after problem than the precaution of problem. So this process has the highest rate of mengel. We develop LCC analysis model considering the precaution and try to show the necessity of the precaution by comparing and analyzing every alternative proposal during LCC. By studying of the previous work and the result of questionnaire, we deduce the problem of waterproof work in construction area. By discussion with an expert in this process and research, we make solutions about precaution and set the cost items in every alternative proposal about these solutions. We understand the effect of each elements through sensitive analysis of the cost items, and find the economically best suited solution.