A caving self-stabilization bearing structure of advancing cutting roof for gob-side entry retaining with hard roof stratum

  • Yang, Hongyun;Liu, Yanbao;Cao, Shugang;Pan, Ruikai;Wang, Hui;Li, Yong;Luo, Feng
    • Geomechanics and Engineering
    • /
    • v.21 no.1
    • /
    • pp.23-33
    • /
    • 2020
  • An advancing cutting roof for gob-side entry retaining with no-pillar mining under specific geological conditions is more conducive to the safe and efficient production in a coalmine. This method is being promoted for use in a large number of coalmines because it has many advantages compared to the retaining method with an artificial filling wall as the gateway side filling body. In order to observe the inner structure of the gateway cutting roof and understand its stability mechanism, an equivalent material simulation experiment for a coalmine with complex geological conditions was carried out in this study. The results show that a "self-stabilization bearing structure" equilibrium model was found after the cutting roof caving when the cut line deviation angle was unequal to zero and the cut height was greater than the mining height, and the caving roof rock was hard without damage. The model showed that its stability was mainly controlled by two key blocks. Furthermore, in order to determine the optimal parameters of the cut height and the cut line deviation angle for the cutting roof of the retaining gateway, an in-depth analysis with theoretical mechanics and mine rock mechanics of the model was performed, and the relationship between the roof balance control force and the cut height and cut line deviation angle was solved. It was found that the selection of the values of the cut height and the cut line deviation angle had to conform to a certain principle that it should not only utilize the support force provided by the coal wall and the contact surface of the two key blocks but also prevent the failure of the coal wall and the contact surface.

Failure pattern of large-scale goaf collapse and a controlled roof caving method used in gypsum mine

  • Chen, Lu;Zhou, Zilong;Zang, Chuanwei;Zeng, Ling;Zhao, Yuan
    • Geomechanics and Engineering
    • /
    • v.18 no.4
    • /
    • pp.449-457
    • /
    • 2019
  • Physical model tests were first performed to investigate the failure pattern of multiple pillar-roof support system. It was observed in the physical model tests, pillars were design with the same mechanical parameters in model #1, cracking occurred simultaneously in panel pillars and the roof above barrier pillars. When pillars 2 to 5 lost bearing capacity, collapse of the roof supported by those pillars occurred. Physical model #2 was design with a relatively weaker pillar (pillar 3) among six pillars. It was found that the whole pillar-roof system was divided into two independent systems by a roof crack, and two pillars collapse and roof subsidence events occurred during the loading process, the first failure event was induced by the pillars failure, and the second was caused by the roof crack. Then, for a multiple pillar-roof support system, three types of failure patterns were analysed based on the condition of pillar and roof. It can be concluded that any failure of a bearing component would cause a subsidence event. However, the barrier pillar could bear the transferred load during the stress redistribution process, mitigating the propagation of collapse or cutting the roof to insulate the collapse area. Importantly, some effective methods were suggested to decrease the risk of catastrophic collapse, and the deep-hole-blasting was employed to improve the stability of the pillar and roof support system in a room and pillar mine.

Coordinated supporting method of gob-side entry retaining in coal mines and a case study with hard roof

  • Liu, X.S.;Ning, J.G.;Tan, Y.L.;Xu, Q.;Fan, D.Y.
    • Geomechanics and Engineering
    • /
    • v.15 no.6
    • /
    • pp.1173-1182
    • /
    • 2018
  • The coal wall, gob-side backfill, and gangues in goaf, constitute the support system for Gob-side entry retaining (GER) in coal mines. Reasonably allocating and utilizing their bearing capacities are key scientific and technical issues for the safety and economic benefits of the GER technology. At first, a mechanical model of GER was established and a governing equation for coordinated bearing of the coal-backfill-gangue support system was derived to reveal the coordinated bearing mechanism. Then, considering the bearing characteristics of the coal wall, gob-side backfill and gangues in goaf, their quantitative design methods were proposed, respectively. Next, taking the No. 2201 haulage roadway serving the No. 7 coal seam in Jiangjiawan Mine, China, as an example, the design calculations showed that the strains of both the coal wall and gob-side backfill were larger than their allowable strains and the rotational angle of the lateral main roof was larger than its allowable rotational angle. Finally, flexible-rigid composite supporting technology and roof cutting technology were designed and used. In situ investigations showed that the deformation and failure of surrounding rocks were well controlled and both the coal wall and gob-side backfill remained stable. Taking the coal wall, gob-side backfill and gangues in goaf as a whole system, this research takes full consideration of their bearing properties and provides a quantitative basis for design of the support system.

2-Dimensional Numerical Analysis of Crossing Tunnel under Railroad using Roof Panel Shield Method (RPS공법을 이용한 철도횡단터널의 2차원수치해석)

  • Shin, Eun-Chul;Roh, Jeong-Min;Lee, Eun-Soo;Kim, Kyeong-Mo;Kim, Jung-Hyi;Jung, Byung-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.591-600
    • /
    • 2005
  • There are many cross tunnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(roof panel shield) method in crossing tunnel construction with comparing other existing cross tunnelling method are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

  • PDF

Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

Numerical Analysis of Crossing Tunnel Under Railroad using Roof Panel Shield Method (Roof Panel Shield 공법을 이용한 철도지하횡단터널 굴착의 수치해석 연구)

  • Shin Eun-Chul;Kim Jung-Hyi;Jung Byung-Chul;Roh Jeong-Min
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.655-660
    • /
    • 2005
  • Recently, the crossing tunnel has been constructed to maintain the operation highway as well as railroad. The advantages of adopting RPS method in crossing tunnel construction are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing tunnel construction.

  • PDF

3-Dimensional Numerical Analysis of Crossing Tunnel under Railroad using RPS Method (RPS공법을 이용한 철도횡단터널의 3차원 수치해석)

  • Shin Eun-Chul;Kim Jung-Hyi;Lee Eun-Soo;Roh Jeong-Min
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.454-461
    • /
    • 2005
  • There are many cross tunnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross tunnelling method are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The 3-dimensional numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

  • PDF

Experimental Study on the Combined Effect of Power and Heat according to the Ventilation of Back Side in Roof Integrated PV System (주택 지붕일체형 PV시스템 후면환기에 따른 발전성능 변화 실험연구)

  • Yoon, Jong-Ho;Han, Kyu-Bok;An, Young-Sub
    • Journal of the Korean Solar Energy Society
    • /
    • v.27 no.3
    • /
    • pp.169-174
    • /
    • 2007
  • Building integrated photovoltaic(BIPV) system operates as a multi-functional building construction material. They not only produce electricity, but also are building integral components such as facade, roof, window and shading device. As PV modules function like building envelope in BIPV, combined thermal and PV performance should be simultaneously evaluated. This study is to establish basic Information for designing effective BIPV by discovering relations between temperature and generation capability through experiment when the PV module is used as roof material for houses. To do so, we established 3kW full scale mock-up model with real size house and attached an PV array by cutting in half. This is to assess temperature influence depending on whether there is a ventilation on the rear side of PV module or not.

A Study on the Form Finding and Optimal Cutting Pattern Analysis Technique of Membrane Structures (막구조물의 형상탐색 및 최적재단도 해석기법에 관한 연구)

  • 서삼열
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.12 no.3
    • /
    • pp.457-464
    • /
    • 1999
  • The object of this study is form finding, stress-strain analysis and cutting pattern analysis of membrane structures under the following assumptions : (1) material is linearly elastic (2) stress state is plane stress. The cable and membrane structures undergo large deformation because of its highly flexibility, therefore, we must take account of its geometric nonlinearity. The analysis procedure is consisted of three steps considering geometric nonlinearity unlike any other structures. First step is the form finding analysis to determine the initial equilibrium shape. Second step is the stress-strain analysis to investigate the behaviors of structures under various external loads. Once a stationary shape has been fount a cutting pattern based on the form finding analysis may be generated for manufacturing procedure. In this paper, form finding, stress-strain analysis and cutting pattern analysis is carried out for applying to Seoguipo worldcup soccer stadium roof structures and optimal cutting pattern analysis technique is proposed.

  • PDF

A Comparative Study on the Characteristics between Paekche and Silla Style Stone Pagodas (백제석탑(百濟石塔)과 신라석탑(新羅石塔)의 비교론적(比較論的) 고찰(考察))

  • Cheon, Deuk-Youm;Han, Seung-Hoon;Kim, Jin-sug
    • Journal of architectural history
    • /
    • v.4 no.1
    • /
    • pp.93-112
    • /
    • 1995
  • The wooden pagoda was first appeared in about late 4th century in Korea. And between the late 6th century and the eary 7th centry, the multistoried wooden pagoda was replaced with the stone pagodas, in order to improve their stability and durability. In Three-kingdom and Unificated-Silla period, there are two types of stone stupas in Korea. The one is Paekche(百濟)style, and the other is Silla(新羅) style stone pagoda. These two styles are basically different in each part like podium, roof stone, body stone, structure and the others. Two types of stupas are distributed in two regions which devided into the East(Silla territory) and West(Paekche territory) in the Korean peninsular. The origin of the Korean stone pagoda can be traced to the Paekche dynasty and Silla dynasty. The former were the result of the careful study of their skillful wooden pagodas, where the latter were actualy originated from copying their sundried brick pagodas with stone. Two important pagodas of the primitive stage are the stone pagoda of Miruksa(彌勒寺) temple in Iksan and Bunhwangsa(芬皇寺) temple in Kyungju. These two pagodas are compared with each other in the style of their construction. Silla style have sharp straight lines and short distance between roof stone and eaves. They give us strong as well as intelletural feeling. Howerever, Paekche style has curved lines and dull angles of cutting area of stone, they give us soft feeling.

  • PDF