The accuracy of point load apparatus is depend on point to point coaxial fitting. Also, the estimation of applied point load using the pressure gauge frequently lead to erroneous results. An improved point load apparatus has been developed in this study by mounting linear bearing on polished support rod, and eccentric error of point to point axis has been sustained less than 0.1 mm even under series of extreme work load conditions. Two digital displacement gauges are attached to measure the distance from point to point with sample specimen. A load cell mounted at the end of upper conical platen measure the applied net load on sample instead of preassure gauge. Total of 107 point load tests has been achieved to assure the quality and performance of developed apparatus. This exercise turned out to be successful.
The discontinuity of rock is one of important elements that have impact on the dynamic movement of rock. A slope made of gneiss has complicated geological structure because of the gneiss forming process through metamorphism covering wide range and the anisotropic structure with foliation. In this study, before cutting slope, the rock of slope had been found as a good quality by the boring test. But during construction tension cracks had occurred in the section with 170m length during large-scale excavation work with depth more than 20m. Ground surface geological investigation, boring exploration, resistivity logging and borehole image processing had been done to find the causes of the tension crack. It was possible to estimate the scale of fault existing in large area through resistivity logging and geological investigation. Large scale slickenside and fault clay had been found as the result of comprehensive analysis.
Proceedings of the Korean Geotechical Society Conference
/
2010.09a
/
pp.519-526
/
2010
The construction site for $\bigcirc\bigcirc$ transformer substation was located at a mountain valley. In order to prepare the site, the valley was first filled with crushed rock debris up to 63m. Since the main concern of this project is to minimize differential settlement of the foundation of transformer facilities, dynamic compaction was performed every 7m followed by reinforcement with EMP(Ez-Mud Piling). The EMP is one of bored piling methods, in which a hole is bored by means of air percussion and maintain by injecting Ez-Mud. Then a PHC pile (Pretensioned spun High strength Concrete pile) is embedded and finalized with a hammer. In this study, bearing capacities and long term behavior of a pile installed by EMP were investigated. To achieve these objectives, a series of tests such as static and dynamic load tests were conducted. In addition, a construction quality control standard was proposed based on the test results.
Park, Dohyun;Ryu, Dong-Woo;Choi, Byung-Hee;SunWoo, Choon;Han, Kong-Chang
Tunnel and Underground Space
/
v.23
no.1
/
pp.78-85
/
2013
A primary objective in creating a stratified thermal storage is to maintain the thermodynamic quality of energy, so thermally stratified energy can be extracted at temperatures required for target activities. The separation of the thermal energy in heat stores to layers with different temperatures, i.e., the thermal stratification is a key factor in achieving this objective. This paper introduces different methods that have been proposed to characterize the thermal stratification in heat stores. Specifically, this paper focuses on the methods that can be used to determine the ability of heat stores to promote and maintain stratification during the process of charging, storing and discharging. In addition, based on methods using thermal stratification indices, the degrees of stratification of stored energy in Lyckebo rock cavern in Sweden were compared and the applicability of the methods was investigated.
Journal of the Korean Society of Earth Science Education
/
v.2
no.1
/
pp.80-90
/
2009
The purpose of this study is to investigate the characteristics of the mind maps which were drawn with pencil or color pens by elementary students. For this study, 31 students of the 6th grade were selected and trained mind mapping. After training, the subjects had drawn mind maps with color pens about the ROCK for 15minutes and drew mind maps with pencil after 2days of mind mapping using color pens. In addition to activities of mind mapping, the students handed in their papers which were written one's impression of drawing two kinds of mind mapping. The results were follows: First, in central circle which was linked words connected firstly with ROCK as key word, the difference of 2kinds mind maps were little showed in the quantity and quality of the words, branches and their adequacy. Second, the mind maps using pencils had more words, branches and images than mind maps of using color pens in the whole assessment. Third, the most students suggested that the mind mapping using pencil were advantage to economy of time, retouching words and branches, also the mind mapping using pencil made the students relax the strain for drawing it because of retouching possibility. Consequently, the results of this study suggest the mind mapping using pencil has advantage effect on the purpose of gaining students' thinking abundantly and economy of time in elementary science classes.
The state of in situ stress is an important factor in considering the suitability of a site as a geological repository for nuclear waste. In this study, three-dimensional distinct numerical analysis was conducted to investigate the effect of deformation zones on the state of stress in the Oskarshamn area, which is one of two candidate sites in Sweden. A discontinuum numerical model was constructed by explicitly representing the numerous deformation zones identified from site investigation and far-field tectonic stress was applied in the constructed model. The numerical model successfully captured the variation of measured stress often observed in the rock mass containing large-scale fractures, which shows that numerical analysis can be an effective tool in improving the understanding of the state of stresses. Discrepancies between measured and modelled stress are attributed to the inconsistent quality of measured stress, uncertainty in geological geometry. and input data for fractures.
Hatherly Peter;Medhurst Terry;Sliwa Renate;Turner Roland
Geophysics and Geophysical Exploration
/
v.8
no.1
/
pp.112-117
/
2005
Geophysical logging is routinely undertaken as part of most coal mine exploration programs. Currently, the main application for the logs is to determine coal seam depth and to qualitatively estimate coal quality, lithology, and rock strength. However, further information can be obtained, if quantitative log interpretation is made. To assist in the uptake of quantitative interpretation, we discuss log responses in terms of the mineralogy of the clastic sedimentary rocks frequently found in the Australian black coal mining areas of the Sydney and Bowen Basins. We find that the log responses can be tied to the mineralogy with reasonable confidence. Ambiguities in the interpretation will be better resolved if a full suite of logs is run. A method for checking for internal consistency, by comparing calculated and observed velocities, is also described. A key driver for quantitative interpretation is geotechnical characterisation. We propose a classification system for clastic rocks that takes into consideration physical rock properties that can be inferred from geophysical logs.
A groundwater source heat pump (GWHP) was developed in this study by adapting a borehole heat exchanger with closed-loop and open-loop systems in a new building. In the pilot test building, the air-conditioning on the second floor was designed to employ a closed-loop system and that on the third floor had an open-loop system. The GWHP design is based on the feasibility of groundwater resources at the installation site. For the hydrogeological survey of the study site, pumping and injection tests were conducted, and the feasibility of GWHP installation was evaluated based on the air-conditioning load demand of the building. The site was found to be satisfactory for the design capacity of the thermal load and water quality. In addition, the effect of groundwater movement on the performance of the closed-loop system was tested under three different operational scenarios of groundwater pumping. The performance of the system was sustainable with groundwater flow but declined without appropriate groundwater flow. From long-term observations of the operation, the aquifer temperature change was less than 2℃ at the observation well and 5℃ at the injection well with respect to the initial groundwater temperature. This pilot study is expected to be of guidance for developing GWHPs at fractured rock aquifers.
In domestic cases, the standard support pattern of 2-lanes road tunnels is presented because construction experience and high degree various data was abundant. But, it is not desirable to apply standard for 2-Arch tunnels that the precedent and measuring data is insufficient existing support pattern blasting plan and interpretation of separate way concerning specific terrain and rock quality. In this study, behavior according to load distribution ratio and Unsymmetrical Pressure about standard support pattern which is applied in design and construction of 2-arch tunnels was analysed and the examination of blasting vibration has influence on the center wall is conducted as a consequence reasonableness of support whether or not with presumed support pressure and ground reaction curve method. In result appropriateness of standard support pattern, support quantity is proper but considers specific terrain and rock quality condition when design and construction of further step 2-arch tunnel standard support pattern must be decided by considering terrains, soil properties and construction condition of the objective tunnel.
It is well known that shotcrete is the most important support member for the construction of large underground spaces. Generally, the strength of the field shotcrete is heavily dependent on the field mixing and spraying conditions so that it is different from the strength of the shotcrete mixed in laboratories. As a support member, the early strength of shotcrete unlike concrete is very important to the initial stabilization of the underground spaces. Therefore, the field methods to efficiently test the early strength of shotcrete have been highly required. This paper aimed to verify the pneumatic pin penetration test and the point load test for measuring the early strength of the field shotcrete. As a result of the experiments through a series of uniaxial compression, pin penetration, and point load tests for the range of the early shotcrete strength, two equations to estimate reliably the uniaxial compressive strength by the pin penetration and the point load tests were acquired.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.