• Title/Summary/Keyword: road structure

Search Result 919, Processing Time 0.026 seconds

A Study on Congestion Toll Pricing: The Case of Beijing, China (혼잡통행료 산정에 관한 연구 - 중국 베이징의 사례 -)

  • Jiang, Xue;Kim, Ho Yeon
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.21 no.2
    • /
    • pp.107-118
    • /
    • 2018
  • Due to the rapid economic development, traffic congestion has become a dire concern in Beijing, China. Levying a congestion toll is seen as the most effective solution to the problem. Building a congestion pricing model is a crucial step in implementing a workable toll scheme. Unlike previous attempts, this study not only covers the theoretical discussion but also considers three practical issues: the speed-density relationship, the value of travel time savings, and the determination of optimal traffic volume. We estimate the speed-density relationship by regression models and the value of travel time saved through survey results. We further suggest a way through which the government could identify the optimal traffic flow by a series of trial-and-errors, without the knowledge of exact road demand structure. Finally, a practical tolling scheme is proposed for Beijing's second ring road along with some policy recommendations.

Analytical Evaluation of Airborne Noise for the Building Structure' on Railway Transportation Systems (철도부지 상부 입체 건축물의 공기전달음 소음 예측)

  • Yeon, Jun-Oh;Kim, Kyoung-Woo
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.12
    • /
    • pp.1096-1102
    • /
    • 2013
  • The useful practical land shall be reserved when an artificial land covers the railway and road. However, the problem is that since the artificial land places directly on the top of noise sources likely on the railway and road there will arise the weak points, noise and vibration. On this study based on creating the artificial land on the top of a railway vehicle base and placing a tenement on that land, it was comprehended the noise influence from the railway car through the simulation. In order to secure the input value for the simulation, at first measured the noise condition of the railway station building and the railway vehicle base. The output value for the railway station building (place A) was around (53.6~57.6) dB(A), the equivalent continuous sound level for an hour, and for the railway station building (place B) it was around (63.7~68.9) dB. The maximum outdoor noise of the tenement on the artificial land was measured as 64.1 dB(A) under the fixed condition on the simulation modeling. The built purpose of placing the artificial land to prevent the noise influence from the railway met the expectation to be less influenced on the tenement. Rather, because of placing the artificial land the noise level on the lower space could be increased so there requires having a noise control.

A Case Study on Construction of Front-Jacking method in Daejeon E.W. perforate Road Project (대전 동서관통도로 Front-Jacking공법 시공사례)

  • Kim Yong-Il;Hwang Nak-Yeon;Cha Jong-Whi;Jang Sung-Wook;Lee Nai-Yong
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.646-654
    • /
    • 2005
  • The crossing construction under railroad have two methods which are cut and cover and trenchless method. First, cut and cover method is an extremely limited method concerning non-running time. Whereas, trenchless method is free from restriction such as train speed and running time, and has the strong points of safe and rapid construction. Front Jacking method, one of the trenchless methods, is frequently applied recently due to its stability during construction and vantage of assuring schedule reliability. The procedure is that after minimizing interlocking friction with structure and earth pressure due to jacking the small steel tube, pulling the precast box manufactured at the field in the ground using PC strand and hydraulic Jack. This method is able to be applied regardless of section size and length of box and condition of soil. And that is also pro-environmental. This paper presents the case of Daejeon E. W. perforate Road Project applied with the Front Jacking method.

  • PDF

Effectiveness of the Peripheral Transverse Line as Speed-Reduction Treatment on Korean Expressway Ramps (고속도로 노면표시 감속유도시설 효과평가)

  • Lee, Seongkwan Mark;Lee, Kiyoung;Kim, Seokchool
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.85-92
    • /
    • 2012
  • PURPOSES : Since expressways in South Korea are toll roads, many trumpet type interchanges exist, resulting in the installation of loop ramps very frequently. While the travel speed of the main lane is designed to be 100-110 km/h, the structure of a loop ramp is different and is designed for a minimum speed of 40 km/h. In fact, most of the actual travel speeds measured on the ramp exceed the designated speed, which has been a major problem in traffic safety. In this research, a type of pavement marking speed-reduction treatment called the "Peripheral Transverse Line" is installed on expressway loop ramps in order to study the change of driving speeds after the installation. METHODS : To verify statistically the change, this speed-reduction treatment has been installed on the Chungju interchange and the Yeoju junction. The driving speeds before the installation were compared with driving speeds both one month and five monthsafter the installation. RESULTS : As a result, the reductions of the average driving speeds after the treatment were statistically significant. More specifically, the average driving speeds of the Chungju interchange were reduced by 7.1-7.7 % for its tangent road section, and the speeds decreased by 8.5-9.5 % for its curve section. Similarly, in the Yeoju junction, an average speed reduction of 2.9-4.8 % for its tangent section was measured, along with 3.9% long-term speed reduction for its curve section. CONCLUSIONS : Since the pavement marking speed-reduction treatment has been partially proven to be effective from this research, we expect to expand this treatment and re-confirm the effect from a long-term perspective in the future.

Optimal Spacings for Urban Arterial Network (도시간선도로망(都市幹線道路網)의 적정간격(適正間隔))

  • Park, Chang Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.2 no.3
    • /
    • pp.33-41
    • /
    • 1982
  • Development is given for an analytical approach that can investigate parameters characterizing road network geometry. A grid transportation network having a hierarchy structure is considered on a homogeneous and isotropic urban plane in which trip origins and destinations are uniformly dispersed and the trip length distribution is independent of the location of the origin. The object is to find the optimal spacings between urban arterials so as to minimize the sum of travel and construction costs, subject to the hypothesis that a trip assignment follows the Wardrop's first principle. The proposed approach is not the genera method for determining an efficient network layout, but can be used as basic concept for generating and evaluating urban road network alternatives. Given an O-D table and cost estimates the approach is able to outline at least in a qualitative sense the optimal spacings of urban arterial roads.

  • PDF

Study on the Convergent Life Evaluation due to the Bumper Configuration of Multipurpose Vehicle (다목적차량의 범퍼형상에 따른 융합적 수명평가에 관한 연구)

  • Lee, Jung-Ho;Cho, Jae-Ung
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.5
    • /
    • pp.85-90
    • /
    • 2015
  • In this study, the life evaluation due to the structural configuration of bumper attached at the front side of ATV vehicle is studied on the basis of fatigue analysis. As the purpose of this study, the characteristic of bumper exposed on the repetitive loading condition like the vibration is understood. The position of crack happened at the fatigue situation is grasped in advance and complemented in advance. It is considered that the multipurpose vehicle is designed to not be driven on the paved general road but the rough road like the unpaved load. And the weak part of bumper is understood through the study of life evaluation on this driving environment. The durability can be improved by doing the safe design of automotive bumper on the basis of the analysis result. And it is possible to be grafted onto the convergence technique at design and show the esthetic sense.

Estimation of Dynamic Load Amplification Factors under Various Roughness Indices and Vehicle Classes (주행차량의 종류와 아스팔트 콘크리트 포장 평탄성에 따른 동적하중 증가계수 산정)

  • Choi, Jun-Seong;Seo, Joo-Won;Kim, Jong-Woo
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.29-36
    • /
    • 2012
  • In this study, frequently passing vehicles with two, three, four, and five axles were chosen through traffic volume analysis in Kyung-In Expressway in order to analyze how the road roughness and vehicle speed affect on the dynamic loads for roads in various vehicle classes. Dynamic loads according to chosen vehicles are estimated by TruckSim program. Dynamic load amplification factor is ratio between dynamic and static loads, and it is also determined for each vehicle classes. From the result of dynamic loads estimated by the dynamic load amplification factor, it is shown that for three-axles vehicle, when IRI is 3.5 and vehicle speed is 100km/hr, asphalt pavements receive additional 36% of static loads in maximum. The analysis of the amplification factor according to each vehicle classes also indicates that the amplification factor increases as the distance between the axles becomes smaller and each axle receives more loads.

A Case Study on Stability Evaluation of Road Slope based on Geological Condition (지질조건에 따른 도로사면 안정검토에 대한 사례연구)

  • Park, Chal-Sook;Kim, Jae-Hong
    • The Journal of Engineering Geology
    • /
    • v.17 no.4
    • /
    • pp.577-587
    • /
    • 2007
  • The length of study area was about 450m, and it was shown the geological condition of distinguished change of rock by cutting slope. In order to establish a slope stability, we carried out an engineering geological investigations about rock constituent, rock structure and a direction of discontinuous plane. The study area was divided into six section considered by direction of cutting slope, height of slope and geological condition. Analysis of cutting slope stability was carried out with stereo-graphic projection method by DIPS program which was feasible of stability analysis with geometrical correlation for a direction of discontinuous plane and direction of cutting slope. From analysis of cutting slope stability considered by construction, stability and economical efficiency, the slope stability countermeasures such as a high tensile wire net, slope protection method and enhanced retaining wall were established and operated which minimized effect caused by lower end of road on a relaxation of huge rock.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

DEVELOPMENT OF MATDYMO(MULTI-AGENT FOR TRAFFIC SIMULATION WITH VEHICLE DYNAMICS MODEL) II: DEVELOPMENT OF VEHICLE AND DRIVER AGENT

  • Cho, K.Y.;Kwon, S.J.;Suh, M.W.
    • International Journal of Automotive Technology
    • /
    • v.7 no.2
    • /
    • pp.145-154
    • /
    • 2006
  • In the companion paper, the composition and structure of the MATDYMO (Multi-Agent for Traffic Simulation with Vehicle Dynamic Model) were proposed. MATDYMO consists of the road management system, the vehicle motion control system, the driver management system, and the integration control system. Among these systems, the road management system and the integration control system were discussed In the companion paper. In this paper, the vehicle motion control system and the driver management system are discussed. The driver management system constructs the driver agent capable of having different driving styles ranging from slow and careful driving to fast and aggressive driving through the yielding index and passing index. According to these indices, the agents pass or yield their lane for other vehicles; the driver management system constructs the vehicle agents capable of representing the physical vehicle itself. A vehicle agent shows its behavior according to its dynamic characteristics. The vehicle agent contains the nonlinear subcomponents of engine, torque converter, automatic transmission, and wheels. The simulation is conducted for an interrupted flow model and its results are verified by comparison with the results from a commercial software, TRANSYT-7F. The interrupted flow model simulation is implemented for three cases. The first case analyzes the agents' behaviors in the interrupted flow model and it confirms that the agent's behavior could characterize the diversity of human behavior and vehicle well through every rule and communication frameworks. The second case analyzes the traffic signals changed at different intervals and as the acceleration rate changed. The third case analyzes the effects of the traffic signals and traffic volume. The results of these analyses showed that the change of the traffic state was closely related with the vehicle acceleration rate, traffic volume, and the traffic signal interval between intersections. These simulations confirmed that MATDYMO can represent the real traffic condition of the interrupted flow model. At the current stage of development, MATDYMO shows great promise and has significant implications on future traffic state forecasting research.