• Title/Summary/Keyword: road pavement

Search Result 1,210, Processing Time 0.024 seconds

A Study on Development of the Concrete Pavement Condition Index (콘크리트 포장상태 평가지수의 개발에 관한 연구)

  • Kwon, Soo-Ahn;Kim, Nam-Ho;Seo, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.2 no.3
    • /
    • pp.145-153
    • /
    • 2000
  • Pavement evaluation is a fundamental component for rational pavement management. Optimal rehabilitation method and the priority of rehabilitation should be based on the evaluation data. Some types of pavement condition index are needed for objective evaluation of Pavement condition and management of road network. In this study a expressway concrete pavement condition index model is developed through regression analysis that correlates panel rating with distress measurement from the test sections. The derived condition index can be used for network level PMS for the expressway concrete pavement. Correlation coefficient of the model was 0.68. The selected independent variables were International Roughness Index, crack and area of patching.

  • PDF

Field Investigation into Early Age Behavior of Joint Plain Concrete Pavement

  • Park, Dae-Geun;Suh, Young-Chan;Kim, Hyung-Bae
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.1053-1060
    • /
    • 2003
  • The temperature variation of the concrete pavement in the early age significantly affects the initiation and propagation of its early age cracks. This implies that the measurement and analysis of early age temperature trend are necessary to examine the causes of early age cracks in the concrete pavement. In this study, it is investigated how the early age temperature trend in the concrete pavement affects the random crack initiation and behaviors of saw-cut joints using the actual construction site which is located at the KHC test road. During 72 hours after placing the concrete pavement, the ambient air temperature and temperatures at the top, middle, and bottom in the concrete pavement were measured and the random crack initiation in concrete slabs and early age behaviors in the joints were surveyed. The investigation results indicate that the first random crack was initiated at one of the slabs placed in the early morning which have higher temperature changes during early 72 hours. In addition, the joints that were saw-cut in the morning were cracked more rapidly than those saw-cut in the afternoon.

  • PDF

Pavement Performance Model Development Using Bayesian Algorithm (베이지안 기법을 활용한 공용성 모델개발 연구)

  • Mun, Sungho
    • International Journal of Highway Engineering
    • /
    • v.18 no.1
    • /
    • pp.91-97
    • /
    • 2016
  • PURPOSES : The objective of this paper is to develop a pavement performance model based on the Bayesian algorithm, and compare the measured and predicted performance data. METHODS : In this paper, several pavement types such as SMA (stone mastic asphalt), PSMA (polymer-modified stone mastic asphalt), PMA (polymer-modified asphalt), SBS (styrene-butadiene-styrene) modified asphalt, and DGA (dense-graded asphalt) are modeled in terms of the performance evaluation of pavement structures, using the Bayesian algorithm. RESULTS : From case studies related to the performance model development, the statistical parameters of the mean value and standard deviation can be obtained through the Bayesian algorithm, using the initial performance data of two different pavement cases. Furthermore, an accurate performance model can be developed, based on the comparison between the measured and predicted performance data. CONCLUSIONS : Based on the results of the case studies, it is concluded that the determined coefficients of the nonlinear performance models can be used to accurately predict the long-term performance behaviors of DGA and modified asphalt concrete pavements. In addition, the developed models were evaluated through comparison studies between the initial measurement and prediction data, as well as between the final measurement and prediction data. In the model development, the initial measured data were used.

Development of Tire/Pavement Noise Simulator (도로포장면과 타이어간의 소음 재현장비의 개발)

  • Kim, Young-Kyu;Lee, Seung-Woo;Yoo, Tae-Seok
    • International Journal of Highway Engineering
    • /
    • v.9 no.3
    • /
    • pp.51-62
    • /
    • 2007
  • Recently various low-noise-pavement methods have been developed. Since tire/pavement noise is the major source of traffic noise at high speed condition, the core-technology of low-noise pavement is to produce the road surface texture that can reduce tire/pavement noise. The difficulties in the development of the low-noise pavements are high costs and time to construct test roads, since vehicles have to travel on the test roads to evaluate the noise from a particular condition of pavement surface. Tire/Pavement Noise Simulator were developed to overcome those difficulties and the reliability of developed Tire/Pavement Noise Simulator are investigated based on the simulating and measuring the noise of tire-tined concrete pavement and tire-non tined concrete pavement.

  • PDF

A Study on the Relation between IRI and PrI (평탄성 지수 IRI와 PrI의 상관관계에 관한 연구)

  • Kim, Kook-Han;Lee, Byung-Duck;Choi, Go-Il;Yang, Sung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.5 no.1 s.15
    • /
    • pp.11-18
    • /
    • 2003
  • Road roughness, as the key factor influencing not only drivers' ride quality and safety but also pavement deterioration, is one of the most important pavement performance indicator to be evaluated by users' subjective assessment. For this reason, a specific number of the pavement roughness has been adopted to monitor the condition of a road for pavement management systems and to evaluate the quality of newly constructed sections, however, none of the unified methodology was internationally accepted. In Korea highway network, road roughness has been used mainly to evaluate newly placed pavement by using 7.6m CP (California Profile meter) to calculate PrI (Profile Index). But this instrument is manually operated to measure road profiles by traffic closure and their interpretation depends on personal bias. Therefore, problems arisen from the manually operated instrument will be overcome by using the APL (Longitudinal Profile Analyzer) which can be operated in the speed of 80km per hour. A study was conducted to correlate the relation from both concrete and asphalt pavement between IRI (measured by APL) and PrI (measured by 7.6m CP). Test results showed that there was a good correlation between IRI and PrI.

  • PDF

Evaluation of State of Concrete Pavement Sublayers Considering Direction of FWD (FWD 방향을 고려한 콘크리트 포장 하부 상태 평가)

  • Lee, Jae Hoon;Lee, Jae Hoon;Sohn, Dueck Su;Liu, Ju Ho;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.16 no.6
    • /
    • pp.69-78
    • /
    • 2014
  • PURPOSES : The purpose of this paper is showing that the state of pavement sublayers can be evaluated differently according to direction of FWD. METHODS : The concrete pavement slabs above subgrade without anything, subgrade with cavity, and box culvert were modeled by finite element method(FEM). The modeled pavements were analyzed by changing the direction of falling weight deflectometer(FWD). The deflection results obtained from FEM were used to calculate radius of relative stiffness and composite modulus of subgrade reaction using AREA method. Then, the analyzed results were compared to the results of the test performed at the Korea Expressway Corporation(KEC) test road. RESULTS : The composite modulus of subgrade reaction increased with subgrade elastic modulus, while radius of relative stiffness decreased. The pavement sections of pure earth showed the consistent results regardless of FWD direction. In case there was cavity, the radius of relative stiffness was larger and composite modulus of subgrade reaction was smaller when FWD was leaving the cavity than when approaching the cavity. This pattern became clear when the cavity got larger. In case of the section with box culvert, the pattern was opposite to the case of cavity. When the soil cover depth increased, the effect of box culvert got smaller. When the load was applied far from the cavity and box culvert, the effect was also declined. The test performed at the KEC test road showed identical results to those of finite element analysis. CONCLUSIONS : The direction of FWD should be considered in evaluation of the state of pavement sublayers because it can be evaluated differently even under identical condition.

Behavior of Jointed Concrete Pavement by Box Culvert and Reinforced Slab (박스형 암거와 보강슬래브에 의한 줄눈 콘크리트 포장의 거동)

  • Park, Joo Young;Sohn, Dueck Su;Lee, Jae Hoon;Yan, Yu;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.25-35
    • /
    • 2012
  • PURPOSES : Hollows are easily made, and bearing capacity can be lowered near underground structures because sublayers of pavement settle for a long time due to difficult compaction at the position. If loadings are applied in this condition, distresses may occur in pavement and, as the result, its lifespan can decrease due to the stress larger than that expected in design phase. Although reinforced slab is installed on side of box culvert to minimize the distresses, length of the reinforced slab is fixed as 6m in Korea without any theoretical consideration. The purpose of this paper is investigating the behavior of concrete pavement according to the cover depth of the box culvert ad the length of the reinforced slab. METHODS : The distresses of concrete pavement slabs were investigated and cover depth was surveyed at position where the box culverts were located in expressways. The concrete pavements including the box culverts were modeled by finite element method and their behaviors according to the soil cover depth were analyzed. Wheel loading was applied after considering self weight of the pavement and temperature gradient of the concrete pavement slab at Yeojoo, Gyeonggi where a test road was located. After installing pavement joint at various positions, behavior of the pavement was analyzed by changing the soil cover depth and length of the reinforced slab. RESULTS : As the result, the tensile stress developed in the pavement slab according to the joint position, cover depth, and reinforced slab length was figured out. CONCLUSIONS : More reasonable and economic design of the concrete pavement including the box culvert is expected by the research results.

Development of Pavement method for Farm Roads (기계화 경작로의 포장공법 개발(지반공학))

  • 송창섭;리신호;오무영;성찬용
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.431-437
    • /
    • 2000
  • The aim of the work described in this paper is to develope a pavement method for farm road. To this ends, a series of material test are conducted on in-situ soil which was mixed additives-coarse aggregate, polypropylene fiber, excellent soil compound etc. With the laboratory test results, in-situ pavement test was conducted during two years. The serious problem of the pavement is not appeared up to this time. And the measurement of field data is continued presently. The majority merits of this pavement method is low cost and using environmental materials.

  • PDF

An Experimental Study on Fine Dust Emissions near Special Modified Asphalt Pavement and Conventional Asphalt Pavement (특수개질 및 일반 아스팔트 포장체 도로변의 미세먼지 발생에 대한 실험적 연구)

  • Tae-Woo Kang;Hyeok-Jung Kim
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.11 no.3
    • /
    • pp.282-288
    • /
    • 2023
  • In this study, we analyzed the amount of roadside fine dust generated from newly constructed specially modified asphalt pavement and general asphalt pavement from existing roads. We collected the 1,000 g (100 g/day) of dust samples from the roadside of the express bus terminal and commercial facility area in Chungcheongnam-do's C site at three-day intervals during the summer of 2022 and 2023. The collected samples were separated from fine dust according to size in the 75-150 ㎛ range and, were separated only from Tire and Road Wear Particles through density separation. No.1-3 are general asphalt pavement section as an existing road. Fine dust and Tire and Road Wear Particles in No.1-3 were 24.27 g, 24.36 g, 0.53 g, and 0.53 g, respectively, and the quantitative results for 2022 and 2023 were similar. On the other hand, No.4-6 are newly constructed specially modified asphalt pavement section. Fine dust decreased by 14.8 % and tire and road wear particles decreased by 29.6 % in 2023 compared to 2022 in No.4-6. In addition, according to the results of thermogravimetric analysis, Tire and road wear particles in No.1-3 are tire and road components at 30 % and 70 %, respectively. And Tire and road wear particles in No.4-6 are tire and road components at 35 % and 65 % in 2023, respectively. From these results, it was confirmed that the newly constructed specially modified asphalt pavement can be effective in reducing roadside fine dust and Tire and Road Wear Particles. However, there may be some shortcomings in conclusive research results due to limited space and sample collection period. In the future, we plan to conduct various case studies.

Evaluation of Surface Temperature Variation and Heat Exchange Rate of Concrete Road Pavement with Buried Circulating Water Piping (열매체 순환수 배관이 매설된 콘크리트 도로 포장체의 표면 온도 변화와 방열량 평가)

  • Byonghu Sohn;Yongki Kim
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.19 no.3
    • /
    • pp.1-13
    • /
    • 2023
  • Hydronic heated road pavement (HHP) systems have been well established and documented to provide road safety in winter season over the past two decades. However, most of the systems run on asphalt, only a few are tested with concrete, and there rarely is a comparison between those two common road materials in their performance. The aim of this study is to investigate the thermal performance of the concrete HHP systems, including surface temperature variations of experimental pavements in winter season. For preliminary study a small-scale experimental system was installed to evaluate the heat transfer characteristics of the concrete HHP in the test field. The system consists of 3 concrete slabs made of 1 m in width, 1 m in length, and 0.25 m in height. In these slabs, circulating water piping was embedded with different pipe depths of 0.08 m (Case A), 0.12 m (Case B), and 0.20 m (Case C) and same horizontal space of 0.16 m. Heating performance in winter season was tested with different inlet temperatures of 25℃, 30℃, 35℃ and 40℃ during the entire measurement period. Overall, the surface temperature of the concrete HHPs remained above 3℃ in all experimental conditions applied in this study. The results of the surface temperature measurement with respect to the pipe depth showed that Case B was the highest among the three cases. However, the closer the circulating water pipe was to the pavement surface, the greater the heat exchange rate. This results is considered that the heat is continuously accumulated inside the pavements and then the temperature inside the pavements increases, while the amount of heat dissipation decreases as the temperature difference between the inlet and outlet of circulating water decreases. In this preliminary test the applicability of the concrete HHP on road deicing was confirmed. Finally, the results can be used as a basis for studying the effects of various variables on road pavements through numerical analysis and for conducting large-scale empirical experiments.