• 제목/요약/키워드: road construction

검색결과 2,058건 처리시간 0.026초

A formal representation of data exchange for slope stability analysis of smart road design and construction

  • Dai, Ke;Huang, Wuhao;Wen, Ya;Xie, Yuru;Kim, Jung In
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1130-1137
    • /
    • 2022
  • The Industry Foundation Classes (IFC) provides standardized product models for the building construction domain. However, the current IFC schema has limited representation for infrastructure. Several studies have examined the data schema for road and highway modeling, but not in a sufficiently comprehensive and robust manner to facilitate the overall integrated project delivery of road projects. Several discussions have focused on slope engineering for road projects, but no solution has been provided regarding the formalized parametric modeling up to now. Iterative design, analysis, and modification are observed during the process of slope design for road projects. The practitioners need to carry out the stability analysis to consider different road design alternatives, including horizontal, vertical, and cross-section designs. The procedure is neither formalized nor automated. Thus, there is a need to develop the formal representation of the product and process of slope analysis for road design. The objective of this research is to develop a formal representation (i.e., an IFC extension data schema) for slope analysis. It consists of comprehensive information required for slope analysis in a structured manner. The deliverable of this study contributes to both the formal representation of infrastructure development and, further, the automated process of slope design for road projects.

  • PDF

하수관로 주변 도로함몰 위험도 평가 방법에 관한 연구 (A Study on Risk Evaluation Method of Ground Subsidence around Sewer)

  • 김진영;최창호
    • 한국지반환경공학회 논문집
    • /
    • 제19권7호
    • /
    • pp.13-18
    • /
    • 2018
  • 최근 도심지를 중심으로 도로함몰이 증가하고 있어 시민들의 안전을 위협하고 있다. 도로 하부에는 상하수도관로, 전기통신시설 등 각종 도로시설물이 매설되어 있는데 이 시설물의 노후화가 도로 함몰의 원인으로 작용하고 있다. 특히, 도로함몰의 주된 원인으로 주목받고 있는 노후 하수관의 경우 단순히 매설연도에 의존하여 하수관 교체 및 보수보강 등의 관리가 이뤄지고 있으며, 하수관 상태에 의한 도로함몰의 위험성은 고려되지 않는 실정이다. 따라서, 본 연구에서는 다양한 하수관 제원 및 주변 환경 정보 및 CCTV 탐사 결과 및 GPR 탐사 결과를 고려한 신뢰성 있는 도로함몰 위험도 평가 방안을 제시하고자 하였다.

임도개설 전·후 식물상 및 식생변화 비교 연구 - 민주지산을 중심으로 - (A Comparative Study of Flora and Vegetation Change before and after Forest Road Construction in the Research Site of Minjujisan)

  • 한승우;권형근;이상명;김현숙;이준우
    • 한국환경생태학회지
    • /
    • 제32권4호
    • /
    • pp.392-412
    • /
    • 2018
  • 본 연구는 임도개설 전 후 년차별로 식물상 및 식생에 미치는 영향을 확인하고 식생의 변화 및 관리 방안을 제공하기 위하여 민주지산 조사구간을 대상으로 임도개설 전년도인 2012년부터 임도 개설 2015년까지 4년에 걸쳐 수행되었다. 임도개설 조사구간 내의 식물군락은 북서사면에서 신갈나무군락, 남서사면에서 굴참나무군락과 일본잎갈나무군락으로 구분되어 남서사면과 북서사면에서 군락의 차이를 보였다. 임도개설 전 후 년차별로 식물상의 변화는 임도 개설 전인 2012년도 총 66분류군(44과 59속 51종 13변종 2품종)에서 2015년도에는 209분류군(71과 153속 178종 27변종 4품종)으로 143분류군이 증가한 것으로 조사되었다. 특히 2013년도에 개설된 임도 근접 사면부의 조사구에서는 차후 년차적으로 높은 식피율과 새로운 분류군의 증가를 보였는데 이는 임도 개설 후 광량이 급격히 증가하여 일어난 현상으로 사료된다. 임도 개설 마지막 년도인 2015년 식생조사 결과를 보면 임도 개발 다음연도는 초본층의 피도가 증가하다가 그 후에는 관목층의 피도가 현저히 증가하는 것으로 나타났다. 따라서 2013년과 2014년에 비해 임도 개설 지역 근접 사면의 식피율이 많은 증가를 보였는 바 지속적인 보완 조사가 수행된다면 향후 임도개설 전 후 식물상 및 식생변화에 있어서 면밀히 분석된 매뉴얼이 완성될 것으로 사료된다.

임도개설(林道開設)에 있어서 투자효과(投資效果)를 최대(最大)로 하는 임도배치(林道配置)프로그램 개발(開發) (Development of Computer Program for the Arrangement of the Forest-road Network to Maximize the Investment Effect on the Forest-road Construction)

  • 박상준;손두식
    • 한국산림과학회지
    • /
    • 제90권4호
    • /
    • pp.420-430
    • /
    • 2001
  • 임도개설상(林道開設上)의 기술적인 문제(問題)와 현장애로를 해소하기 위하여 임도(林道)의 직접적인 효과(效果)인 집재비(集材費)와 개설비(開設費)를 중심으로 투자효과(投資效果)를 최대(最大)로 하는 임도망(林道網) 배치(配置)프로그램을 개발(開發)하였다. 프로그램은 Windows 95/98을 운영체제로 하고 Microsoft Visual Basic 5.0을 사용하여 전체 인터페이스 설계(設計)와 계산 프로그램을 작성하였으며, 인터페이스는 계층적인 구조(構造)로 설계(設計)하고 GUI의 형태(形態)로 제공(提供)하였다. 프로그램 개발에 사용한 입력데이터는 Map데이터(지리정보(地理情報)데이터)로서 수치지형도(數値地形圖)(DTM), 계획구역구분도(計劃區域區分圖), 산림기능구분도(山林機能區分圖), 임내(林內) 도로망도(道路網圖)와 콘트롤데이터(계산용(計算用) 조건인자(條件因子) 테이터)인 임상별(林相別) 목재생산량(木材生産量) 및 노동투입량(勞動投入量), 지형별(地形別) 집재비(集材費), 지형별(地形別) 목도단가(林道單價), 노동단가(勞動單價), 임도(林道) 및 작업도(作業道) 우회율(迂回率), 보행거리계수(步行距離係數), 보행속도(步行速度) 등을 사용하였다. 개발된 프로그램은 현재의 임도개설비(林道開設費)로 향후 벌채(伐採)까지의 적정(適正) 임도밀도(林道密度)와 임도개설연장거리(林道開設延長距離)를 파악할 수 있다. 또한 임도노선배치(林道路線配置)를 프로그램화하여 직접적 경제효과(經濟效果)인 임업적(林業的) 효과(效果)를 제일 우선적으로 생각하여 최적(最適)의 임도노선(林道路線)이 배치(配置)할 수 있으며, 종전의 주관적인 임도노선배치(林道路線配置)보다는 많은 요인(要因)에 의하여 임도망(林道網)이 결정(決定)되고 좀 더 과학적이고 이론적인 임도노선배치(林道路線配置)가 가능하므로 투자효과(投資效果)를 최대(最大)로 하는 임도노선배치(林道路線配置) 계획법(計劃法)을 제시(提示)할 수가 있다. 또한 임도노선배치계산(林道路線配置計算)에서 임도노선(林道路線)마다의 배치우선순위(配置優先順位)가 프로그램상에서 결정(決定)되므로 임도노선배치(林道路線配置) 계획(計劃)을 시업계획(施業計劃)과 병행해서 결정(決定)할 수 있다.

  • PDF

가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발 (Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information)

  • 문현석;강인석
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.101-110
    • /
    • 2009
  • 본 연구는 기존 시공단계 중심의 VR시뮬레이션 활용체계를 설계단계까지 확장하여 도로의 최적 설계정보 지원을 위한 시각화 분석 기능을 개발하는 것이 목적이다. 연구에서는 설계지원을 위한 VR기능으로 도보 선형(alignment)에 의한 토공 시뮬레이션, 대안 노선 선정 시뮬레이션 구조물 타입 선정 시뮬레이션 및 지하시설물 분석 시뮬레이션 기능들을 제안하고 있다. 이러한 VR시뮬레이션 기능을 통해 노선 및 토공 상태의 시각적 확인이 가능하고, 대안 노선의 가상적인 모의 배치를 수행함으로써 최적 설계노선을 선정할 수 있다. 이를 위해 본 연구에서는 도로설계정보 지원을 위한 VR시뮬레이션 기능 개발 방법론 및 시스템(VR Presenter)을 구현하며, VR기능을 적용한 개선된 도로설계 프로세스를 제안하고 있다.

GIS를 이용한 서식지적합성지수(HSI)의 생태영향평가 활용방안연구 - 삼장-산청 국도건설공사를 사례에서 삵을 중심으로 - (A Study on Ecological Evaluation of Habitat Suitability Index using GIS - With a case study of Prionailurus bengalensis in Samjang-Sanchung Road Construction -)

  • 이상돈;권지혜;김아람;정지향
    • 환경영향평가
    • /
    • 제21권5호
    • /
    • pp.801-811
    • /
    • 2012
  • For biodiversity conservation, Biological Impact Assessment is very important. The focus of the study is to enhance efficient Environment Impact Assessment(EIA) based on collecting existing information of endangered species covering the status survey, estimation of effects and reducing methods. Habitat Suitability Index(HSI) can be applicable to Ecological Impact Assessment and finding various reducing methods based on estimating effects. For this study, the EIA report of Samjang - Sanchung highway construction was chosen as an example and Prionailurus bengalensis euptilura as an endangered species was chosen to assess the ecosystem impact on road construction. Water, road, ground coverage, slope, altitude as variables of habitat were weighted and final HSI map was calculated using Arc map and Arc view. Through comparing of before and after HSI, quantitative estimating on effects was possible to minimize impact of road construction to wildlife habitat.

지형요인에 의한 절토사면 붕괴사례 (A Case Study on Cut Slope Failure due to the Geomorphological Factor)

  • 김승현;최지용;이종현;이정엽;구호본
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.1161-1170
    • /
    • 2009
  • The Roads in Gangwon Province generally was made on purpose to use the military road. In case of these roads, tremendous dangerous cut slopes do exist and its road linear shape was badly designed. In order to make up for this situation, the government has continuously established the new road or performed the public works such as the straight line of the curved road. Soksil 2 cut slope was made through the road improvement work. This has small surface failures and collapses. In spite of dry season, this slope are leaking lots of groundwater at the unbelievable point. So as to get curious phenomenon right, we performed a detailed field investigation, the geomorphological analysis, the stability analysis considering field characteristic and ultimately proposed the countermeasure to make sure stability of Sokil 2 cut slope.

  • PDF

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

구 청주읍성 일대 도시공간구조의 변용 양상 (Transformation of Urban Spatial Structure around the Old Castle in Cheong-ju City)

  • 김세진;김태영
    • 한국농촌건축학회논문집
    • /
    • 제15권1호
    • /
    • pp.89-96
    • /
    • 2013
  • This study aims to clarify the transformation of urban spatial structure around old castle in cheong-ju city. The urban spatial structure is composed with road system, block division, and lot system with original cadastral map in 1913 and 2011 GIS. Transformation of road system is classified into control of road line, construction and extension of road. Construction of arterial road was divided into Nam-juro and Mang-sunro with 2 blocks and lot system was destoyed. Transformation of block has not been developed except 4 blocks. The 4 blocks were divided into east-west or north-south direction and became 8 blocks. Transformation of lot system is classified into maintained, subdivided, and destroyed lots in shape and size of lots. Maintained lots were found in large lot in size for public office and park. Subdivided lots were mainly represented with the existing main road, an active alleys, and so on. Destroyed lots by road construction and extension were showed in Nam-juro. Although all these transformations are used to enhance urban spatial structure. The old systems have remained around old castle in cheong-ju city.

Condition assessment model for residential road networks

  • Salman, Alaa;Sodangi, Mahmoud;Omar, Ahmed;Alrifai, Moath
    • Structural Monitoring and Maintenance
    • /
    • 제8권4호
    • /
    • pp.361-378
    • /
    • 2021
  • While the pavement rating system is being utilized for periodic road condition assessment in the Eastern Region municipality of Saudi Arabia, the condition assessment is costly, time-consuming, and not comprehensive as only few parts of the road are randomly selected for the assessment. Thus, this study is aimed at developing a condition assessment model for a specific sample of a residential road network in Dammam City based on an individual road and a road network. The model was developed using the Analytical Hierarchy Process (AHP) according to the defect types and their levels of severity. The defects were arranged according to four categories: structure, construction, environmental, and miscellaneous, which was adopted from sewer condition coding systems. The developed model was validated by municipality experts and was adjudged to be acceptable and more economical compared to results from the Eastern region municipality (Saudi Arabia) model. The outcome of this paper can assist with the allocation of the government's budget for maintenance and capital programs across all Saudi municipalities through maintaining road infrastructure assets at the required level of services.