Cut-slope due to the road construction is one of the most significant problems in the domestic case, that is, 70% of the land is covered by mountain. Moreover, typhoons or heavy rains concentrated in summer season causes the failure of cut-slope. Rock-fall and soil slope failure take 40.8% and 29.5% out of the entire domestic cut-slope failure, respectively. Rock-fall is quickly occurred by the free fall or rolling of rock fragments generally in the upper slope. Soil slope failure produces a clastics-flow and increases casualty especially when caused by heave rainfall because the velocity of the movement is verb high. Considering the car speed and rock-fall velocity, it will take a life in a moment. This study analyzes a set of field data of most recently collapsed domestic road cut-slopes to characterize these cut-slopes and the nature of rock-falls and clastics flows at each site. Based on the results, design criteria for a road alarm system are proposed, considering the relationship between the time required for clastics-flow and the velocity and braking distance of a cat at the incidence. The road alarm system proposed herein would operate instantly after a rock-fall and it will minimize damages, by warning drivels approaching to the collapse or collapsing location in advance.
Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
Geomechanics and Engineering
/
v.32
no.1
/
pp.111-123
/
2023
The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.20
no.3
/
pp.105-111
/
2020
We defined Jeju Wind Castle and analyzed the relationship between Hallasan-Oreum-Batdam, the main subject, for the first time. In Jeju, 1.5m high Batdam(Black Silk Road), 368 Oreums, Hallasan Mountain 1950m are all unique scenery. The verification of this paper demonstrates that Samdasoo's groundwater extraction sea level is equal to the height of Hallasan and that this problem is mathematically complete in neutral plane theory. Donnaeko(700meters above sea level)-Baeknokdamdongneung-Jindallebat-Seongpanak-Gyorae(453 meters)-Witsaeoreum(1700meters) is a rain belt that hits the low-air pressure air-conditioned North Pacific humidity rising from the southeast and the high-pressure cold air of Hallasan Peak. It rains a lot because - and + are neutral plane, which adds to zero. Hallasan is called Jinsan in Jeju history. The answer is Wind Castle. The number of Oreum in Jeju is 369 including Hallasan, and Batdam, which is about 1.5m high, does not collapse even with a typhoon blowing over 50m/s. Because the wind castle's core is 1.5 meters of Batdam and it is a triangular number.
Kim, Seung-Hyun;Koo, Ho-Bon;Rhee, Jong-Hyun;Baek, Yong
The Journal of Engineering Geology
/
v.17
no.2
s.52
/
pp.253-261
/
2007
The failure of the road cut-slope due to heavy rains brings about lots of injuries and damage on national properties. KICT has developed CSMS system by means of prevention to manage the dangerous cut slopes. In spite of the continuous management the frequency of cut-slopes failure is increasing the past due to changes of earth-environment. KICT has installed the "Real-Time Monitoring System" on dangerous slopes. The operation of Real-Time Monitoring System is used as a positive system to reduce injuries and damages. However, Although the slope manager is aware of the signs collapsed in advance, it has temporal and spatial limits until the slope manager performs the works which are preventing the accidents. When real time monitoring system finds out an indication of slope collapse, the Rock-fall Signal Lamp System makes road-users indicated the risk of cut slopes. It is a kind of prevention system that it will minimize the damages of the properties as suspension of traffic automatically or passively.
The research of applying reinforced retaining wall due to support the land pressure that given from train's load has been accomplished actively in domestic area. After the retaining wall has been installed, the collapse or partial destruction that generated by effect of train's vibration and repetitive load of train may be induced. Accordingly in the period of using this, the sufficient durability should be guaranteed and years of durability are one hundred and as these are longer than road structure's, the technique that introduced to wall and monitor the long-term strain is necessary. In this paper, the optical fibre is induced vertically to the reinforced retaining wall and after the subsistence of optical fibre is confirmed, the early strain that applied to optical fibre after insertion is monitored. Before and after the concrete placing, damage feasibility of optical fibre is measured by using OTDR(Optical Time Domain Reflectometer) and after concrete is cultivated, the early strain induced to optical fibre is measured by application of BOCDA (Brillouin Correlation Domain Analysis) system.
Proceedings of the Korean Geotechical Society Conference
/
2009.09a
/
pp.677-694
/
2009
While the budget has been allocated more for repairs and reinforcements, casualties are gradually increased due to slope disaster. Slope disaster causes road damaged as well as casualties. It also causes significant social and economic loss. The measurement device, which is installed inside ground of slope like inclinometer, has the high loss rate when slope is being slided. The electric type and the vibrating wire type have low durability because of corrosion. To cover the demerit of the present slope monitoring, the measurement method using the Multi-Antenna GPS has been developed. The Multi-Antenna GPS has been installed in the local slope as the regular monitoring system for slope. Although the initial cost of the Multi-Antenna GPS for installation is high, the additional cost is low. So it is the suitable method for large slope. The regular monitoring system using the Multi-Antenna GPS is the suitable measurement method for watching slope collapse, which is occurred widely, because it is economical, has high durability, and collects data with high resolution.
Kim, Nag-Young;Park, Du-Hee;Jung, Hyuk-Sang;Kim, Myoung-Il
Geomechanics and Engineering
/
v.21
no.2
/
pp.171-178
/
2020
Mountainous areas cover more than 70% of Korea. With the rapid increase in tunnel construction, tunnel-collapse incidents and excessive deformation are occurring more frequently. In addition, longer tunnel structures are being constructed, and geologically weaker ground conditions are increasingly being encountered during the construction process. Tunnels constructed under weak ground conditions exhibit long-term deformation behavior that leads to tunnel instability. This study analyzes the behavior of the bottom region of tunnels under geological conditions of long-term deformation. Long-term deformation causes various types of damage, such as cracks and ridges in the packing part of tunnels, as well as cracks and upheavals in the pavement of tunnels. We observed rapid tunnel over-displacement due to the squeezing of a fault rupture zone after the inflow of a large amount of groundwater. Excessive increments in the support member strength resulted in damage to the support and tunnel bottom. In addition, upward infiltration pressure on the tunnel road was found to cause severe pavement damage. Furthermore, smectite (a highly expandable mineral), chlorite, illite, and hematite, were also observed. Soil samples and rock samples containing clay minerals were found to have greater expansibility than general soil samples. Considering these findings, countermeasures against the deformation of tunnel bottoms are required.
Tunneling is widely increased in rail-road construction due to the large portion of mountainous regions in Korea as well as the improving running performance of train. Tunneling under poor rock condition, shallow overburden, or existing fault zone has high risk for collapse. Therefore, this study presents the stability of tunnel under unfavorable geological conditions using finite element methods.
In the era of the 4th industrial revolution, smart construction is actively researched, in the domestic construction field, and one of the key elements in this field is Building Information Modeling(BIM). In Korea, smart construction is being implemented through BIM-based digitization and intelligence. The geotechnical engineering field should also prepare for the introduction of BIM. In this study, the concept and application status of GeoBIM were identified, and the direction of future research was presented. This study is a part of the study "Establishment of GeoBIM-based Digital Twin Maintenance System" in the current "Technology Development for Establishment of Jeju Ground Collapse Response System for Safe Road Operation". The subject and scope of the study is continuous excavation at caves located under roads in Jeju Island, and initial research is being conducted on Jaeamcheon-gul and Jeonggusu-gul. This study aims to build a digital twin through individual data construction and integration processes such as cave shape modeling using laser scanners, 3D stratum modeling using borehole information and geophysical exploration data, and modeling of surrounding conditions using drones.
International conference on construction engineering and project management
/
2005.10a
/
pp.952-955
/
2005
In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.