• Title/Summary/Keyword: road collapse

Search Result 83, Processing Time 0.024 seconds

Study on Suggestion a Standard Installation for Damage Reduction alarm System using Cut-Slope Data (국내 도로절개면 현황 및 붕괴 분석을 통한 경보시스템 설치 기준에 관한 기초적 연구)

  • Bae, Gyu-Jin;Koo, Ho-Bon;Baek, Yong
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2002
  • Cut-slope due to the road construction is one of the most significant problems in the domestic case, that is, 70% of the land is covered by mountain. Moreover, typhoons or heavy rains concentrated in summer season causes the failure of cut-slope. Rock-fall and soil slope failure take 40.8% and 29.5% out of the entire domestic cut-slope failure, respectively. Rock-fall is quickly occurred by the free fall or rolling of rock fragments generally in the upper slope. Soil slope failure produces a clastics-flow and increases casualty especially when caused by heave rainfall because the velocity of the movement is verb high. Considering the car speed and rock-fall velocity, it will take a life in a moment. This study analyzes a set of field data of most recently collapsed domestic road cut-slopes to characterize these cut-slopes and the nature of rock-falls and clastics flows at each site. Based on the results, design criteria for a road alarm system are proposed, considering the relationship between the time required for clastics-flow and the velocity and braking distance of a cat at the incidence. The road alarm system proposed herein would operate instantly after a rock-fall and it will minimize damages, by warning drivels approaching to the collapse or collapsing location in advance.

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

Wind Castle: The Natural Intelligence Control of Hallasan-Oreum-Batdam I (윈드캐슬: 한라산-오름-밭담의 자연지능 제어 I)

  • Lee, Moon-Ho;Kim, Jeong-Su
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.3
    • /
    • pp.105-111
    • /
    • 2020
  • We defined Jeju Wind Castle and analyzed the relationship between Hallasan-Oreum-Batdam, the main subject, for the first time. In Jeju, 1.5m high Batdam(Black Silk Road), 368 Oreums, Hallasan Mountain 1950m are all unique scenery. The verification of this paper demonstrates that Samdasoo's groundwater extraction sea level is equal to the height of Hallasan and that this problem is mathematically complete in neutral plane theory. Donnaeko(700meters above sea level)-Baeknokdamdongneung-Jindallebat-Seongpanak-Gyorae(453 meters)-Witsaeoreum(1700meters) is a rain belt that hits the low-air pressure air-conditioned North Pacific humidity rising from the southeast and the high-pressure cold air of Hallasan Peak. It rains a lot because - and + are neutral plane, which adds to zero. Hallasan is called Jinsan in Jeju history. The answer is Wind Castle. The number of Oreum in Jeju is 369 including Hallasan, and Batdam, which is about 1.5m high, does not collapse even with a typhoon blowing over 50m/s. Because the wind castle's core is 1.5 meters of Batdam and it is a triangular number.

A Case Study of the Rock-fall Signal Lamp System for Preventing the Damage at the Cut-Slopes (사면붕괴 피해 예방을 위한 낙석신호등 설치 사례 연구)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Rhee, Jong-Hyun;Baek, Yong
    • The Journal of Engineering Geology
    • /
    • v.17 no.2 s.52
    • /
    • pp.253-261
    • /
    • 2007
  • The failure of the road cut-slope due to heavy rains brings about lots of injuries and damage on national properties. KICT has developed CSMS system by means of prevention to manage the dangerous cut slopes. In spite of the continuous management the frequency of cut-slopes failure is increasing the past due to changes of earth-environment. KICT has installed the "Real-Time Monitoring System" on dangerous slopes. The operation of Real-Time Monitoring System is used as a positive system to reduce injuries and damages. However, Although the slope manager is aware of the signs collapsed in advance, it has temporal and spatial limits until the slope manager performs the works which are preventing the accidents. When real time monitoring system finds out an indication of slope collapse, the Rock-fall Signal Lamp System makes road-users indicated the risk of cut slopes. It is a kind of prevention system that it will minimize the damages of the properties as suspension of traffic automatically or passively.

Strain measurement of optical fiber embedded in the reinfoned retaining wall used in the railway (광섬유가 삽입된 철도용 보강토 옹벽의 초기 변형을 측정)

  • Yoon, Hyuk-Jin;Song, Kwang-Yong;Kim, Dae-Sang;Kim, Ki-Hwan;Kim, Jung-Seok;Kwon, Tae-Soo;Na, Hee-Seung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1509-1513
    • /
    • 2009
  • The research of applying reinforced retaining wall due to support the land pressure that given from train's load has been accomplished actively in domestic area. After the retaining wall has been installed, the collapse or partial destruction that generated by effect of train's vibration and repetitive load of train may be induced. Accordingly in the period of using this, the sufficient durability should be guaranteed and years of durability are one hundred and as these are longer than road structure's, the technique that introduced to wall and monitor the long-term strain is necessary. In this paper, the optical fibre is induced vertically to the reinforced retaining wall and after the subsistence of optical fibre is confirmed, the early strain that applied to optical fibre after insertion is monitored. Before and after the concrete placing, damage feasibility of optical fibre is measured by using OTDR(Optical Time Domain Reflectometer) and after concrete is cultivated, the early strain induced to optical fibre is measured by application of BOCDA (Brillouin Correlation Domain Analysis) system.

  • PDF

The Monitoring System Using Multi Antenna GPS for Weak Slope (Multi Antenna GPS를 이용한 취약사면 상시모니터링 시스템)

  • Noh, Won-Seok;Kim, Wan-Jong;Jang, Hyun-Ick;Kim, Hak-Soo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.677-694
    • /
    • 2009
  • While the budget has been allocated more for repairs and reinforcements, casualties are gradually increased due to slope disaster. Slope disaster causes road damaged as well as casualties. It also causes significant social and economic loss. The measurement device, which is installed inside ground of slope like inclinometer, has the high loss rate when slope is being slided. The electric type and the vibrating wire type have low durability because of corrosion. To cover the demerit of the present slope monitoring, the measurement method using the Multi-Antenna GPS has been developed. The Multi-Antenna GPS has been installed in the local slope as the regular monitoring system for slope. Although the initial cost of the Multi-Antenna GPS for installation is high, the additional cost is low. So it is the suitable method for large slope. The regular monitoring system using the Multi-Antenna GPS is the suitable measurement method for watching slope collapse, which is occurred widely, because it is economical, has high durability, and collects data with high resolution.

  • PDF

Deformation characteristics of tunnel bottom after construction under geological conditions of long-term deformation

  • Kim, Nag-Young;Park, Du-Hee;Jung, Hyuk-Sang;Kim, Myoung-Il
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.171-178
    • /
    • 2020
  • Mountainous areas cover more than 70% of Korea. With the rapid increase in tunnel construction, tunnel-collapse incidents and excessive deformation are occurring more frequently. In addition, longer tunnel structures are being constructed, and geologically weaker ground conditions are increasingly being encountered during the construction process. Tunnels constructed under weak ground conditions exhibit long-term deformation behavior that leads to tunnel instability. This study analyzes the behavior of the bottom region of tunnels under geological conditions of long-term deformation. Long-term deformation causes various types of damage, such as cracks and ridges in the packing part of tunnels, as well as cracks and upheavals in the pavement of tunnels. We observed rapid tunnel over-displacement due to the squeezing of a fault rupture zone after the inflow of a large amount of groundwater. Excessive increments in the support member strength resulted in damage to the support and tunnel bottom. In addition, upward infiltration pressure on the tunnel road was found to cause severe pavement damage. Furthermore, smectite (a highly expandable mineral), chlorite, illite, and hematite, were also observed. Soil samples and rock samples containing clay minerals were found to have greater expansibility than general soil samples. Considering these findings, countermeasures against the deformation of tunnel bottoms are required.

Stability of Tunnel under Shallow Overburden and Poor Rock Conditions Using Numerical Simulations (수치해석적 방법을 통한 저토피 및 암질불량구간의 터널 안정성 검토)

  • Kim, Jungkuk;Kim, Heesu;Ban, Hoki;Kim, Donggyou
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.11
    • /
    • pp.39-47
    • /
    • 2021
  • Tunneling is widely increased in rail-road construction due to the large portion of mountainous regions in Korea as well as the improving running performance of train. Tunneling under poor rock condition, shallow overburden, or existing fault zone has high risk for collapse. Therefore, this study presents the stability of tunnel under unfavorable geological conditions using finite element methods.

A case study of digital twin construction based on geospatial building information modeling (GeoBIM) - Focusing on the case of Jaeamcheon-gul and Jeonggusu-gul in Jeju Island - (지하공간건설정보모델링(GeoBIM) 기반의 디지털 트윈 구축사례에 관한 연구 - 제주도 재암천굴, 정구수굴 사례를 중심으로 -)

  • Lee, Jong-Hyun;An, Joon-Sang;Choi, Jae-Woong;Baek, Yong
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.20-30
    • /
    • 2021
  • In the era of the 4th industrial revolution, smart construction is actively researched, in the domestic construction field, and one of the key elements in this field is Building Information Modeling(BIM). In Korea, smart construction is being implemented through BIM-based digitization and intelligence. The geotechnical engineering field should also prepare for the introduction of BIM. In this study, the concept and application status of GeoBIM were identified, and the direction of future research was presented. This study is a part of the study "Establishment of GeoBIM-based Digital Twin Maintenance System" in the current "Technology Development for Establishment of Jeju Ground Collapse Response System for Safe Road Operation". The subject and scope of the study is continuous excavation at caves located under roads in Jeju Island, and initial research is being conducted on Jaeamcheon-gul and Jeonggusu-gul. This study aims to build a digital twin through individual data construction and integration processes such as cave shape modeling using laser scanners, 3D stratum modeling using borehole information and geophysical exploration data, and modeling of surrounding conditions using drones.

KOREAN CONSTRUCTION JOB MARKET FORECAST FOR CIVIL/ARCHITECTURAL ENGINEERS

  • Hwan Pyo Park;Myung Jin Chae;Minwoo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.952-955
    • /
    • 2005
  • In the early 90's, we had serious shortage of construction engineers in Korea. The shortage was acute especially in construction quality control and supervision area, which were gaining social attention due to the road bridge and the department store collapse that took the hundreds of lives in the early 90's in Seoul, Korea. In order to meet the high demand of construction engineers, the engineering license regulations were changed in 1995. Engineers who did not pass the written exam but have equivalent working experience are given engineering license to practice engineering legally. Since year 2000, while the severe engineer-shortage has been resolved, the opposite situation has occurred: there is serious over-supply of construction engineers. Policy makers and engineering practitioners are agreed to bring back the old-fashioned written exam engineer licensing system like before 1995, i.e., no more written exam exemption. However, the engineers who obtained license without taking written exam may not want to go back to old policy which would take their license. It is required to provide appropriate grace period before the new policy takes effect to minimize the impact of the changes. This paper forecasts the supply-demand of construction engineers providing the basis for the most appropriate policy changes.

  • PDF