Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.369-370
/
2023
Although the construction industry has become highly advanced, traditional accidents still occur on construction sites, prompting numerous studies and systems aimed at accident prevention using smart construction technology. This study is an exploratory investigation of utilizing unmanned aerial vehicles (UAVs) for safety management. The study aims to verify harmful and hazardous factors that UAVs can detect on construction sites, classify management factors, and define improvement measures to present a checklist for each process. Through this, we hope that smart construction technology will be further expanded and applied for on-site safety management.
Korean Journal of Construction Engineering and Management
/
v.6
no.3
s.25
/
pp.120-127
/
2005
This study examines the occurrence of accidents when workers were travelling on construction sites and the differences in risk involved in each occupation. An analysis of 750 fatal accident reports found that in 138 cases, the fatality occurred when the workers were travelling on site. The 138 cases were then divided according to occupation and were then examined to determine how the workers in each occupation had been affected by various hazardous situations. There were significant differences in accident occurrence between the occupations and in the various hazardous situations. The results imply that the cultural aspect of each occupation leads to a substantial difference in the possibility of fatal injuries or death and that such differences in risk should be taken into account when planning the workers' movements on site. The findings of this study aim to help workers to understand the risks entailed when travelling on site and also to assist managers in the planning of workers, movements on construction sites.
Journal of the Korea Institute of Building Construction
/
v.19
no.2
/
pp.185-192
/
2019
Construction has been well known as the industry in which accidents occur more often than other industries. The efforts to eliminate the accidents at construction sites need to be continuously conducted because they tend to cause the social problems such as massive loss of life and property. According to the Korea Occupational Safety and Health Agency (KOSHA), 26,570 (29.3 percent) out of 90,656 workers in total industrial accidents have been occurred in the construction industry in 2016. Particularly, the falling victims are the largest number, which is about 8,699. This number is increasing due to the increase of the large scale, high-rise, and complex construction structures and the various construction methods. In reality, there is a lack of analysis on the risk factors of safety accidents and preventive measures. Therefore, in this study, we have selected risk factors by analyzing the accident cases at construction sites. Based on the results, we conducted a safety practitioner-focused survey and had an interview with safety managers. In analyzing the cases, we have categorized them into three groups such as upper, middle, and lower and compared their statistical results. This study are expected to provide safety management guidelines with workers and safety managers to prevent previously fall accidents at construction site.
Proceedings of the Korean Society of Disaster Information Conference
/
2022.10a
/
pp.169-170
/
2022
As the size of construction projects has become larger in recent years, the nature of the disaster safety factors along with the progress of construction is also becoming more complex and diversified. Accordingly, the introduction of computerized construction, new technologies, and new construction methods has resulted in a variety of risk factors in the process and operations, and many new safety construction methods are being tried. Since the construction industry has variable working environments and constantly changes working methods and components depending on the rate of progress, workers at construction sites are always exposed to risk depending on the specific circumstances of the construction industry. This study attempts to collect and analyze major accident cases generated by major accident construction projects as a result of progress in construction work, and to derive the major causes and causes for each safety management activity that affect safety accidents.
Korean Journal of Construction Engineering and Management
/
v.3
no.3
s.11
/
pp.49-57
/
2002
This paper describes the second stage of the work aiming at proposing a reasonable risk management response system for construction safety. By means of questionnaires/interviews and two sample t-tests, significant risk factors are identified for three different conditions. Then a Case-Based Reasoning System is built for use at construction sites to simulate possible accidents. This Construction Management Reasoning System(CMRS) nay be used by safety managers at sites every day (or education and training of workers to prevent accidents. The case base built so far is limited to the construction of expressway bridges. There is much need for further research since the simulation of possible accidents is to be a good means to enhance safety awareness of construction workers.
Proceedings of the Korean Institute of Building Construction Conference
/
2011.11a
/
pp.151-152
/
2011
As recent construction projects aim to build higher and bigger buildings, lifting operation is getting increasingly important in construction sites. Accordingly, as tower cranes get higher and higher, disasters involving tower cranes are also on the rise. According to occupational incident statistics of the Korea Occupational Health & Safety Agency (KOHSA), most of such incidents occur in installation, dismantling and climbing phases of tower crane. Therefore, it is essential to develop preventative measures to secure safety of tower crane operations, with critical focus on installation, dismantling and climbing of tower crane. Hence, this research attempts to measure criticality of key risk factors in installation, dismantling and climbing phases of tower crane on construction site and propose necessary safety measures. As a result, conclusions herein will contribute to minimize disasters and incidents involving tower cranes in high-rise building construction sites.
Proceedings of the Safety Management and Science Conference
/
2010.04a
/
pp.141-147
/
2010
Risk level for each construction work can be very important factors to establish advanced preventionmeasures. But it is important how to produce it. There are three different methods to set it up for consturuction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.
The Journal of the Convergence on Culture Technology
/
v.6
no.2
/
pp.55-70
/
2020
This study aims to identify the influence of risk-inducing factors and safety inspection on the measures of reducing accidents among workers of building structures in small construction sites. The result can be summarized as follows: First, as for the influence of risk-inducing factors on human factors, preparation for work, disintegrating molds, taking follow-up measures, and keeping records, have statistically significant influences. Therefore, it can be said that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and human factors. Second, as for the influence of risk-inducing factors on facility factors, preparation for work, and taking follow-up measures influenced significantly. This indicates that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and facility factors. Third, as for the influence of risk-inducing factors on management factors, the installation of shores and risk assessment are found to have significant effects. This shows that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors. Fourth, the influence of risk-inducing factors on work factors was significant only in the installation of shores. This indicates that safety inspection has a completely mediating effect in the relationship between risk-inducing factors and work factors. Finally, in the relationship between risk-inducing factors and accident reduction measures, preparation for work, installation of shores, and taking follow-up measures showed significantly positive influences. In contrast, keeping records has a significant negative influence. Thus, safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors.
Journal of Construction Engineering and Project Management
/
v.6
no.2
/
pp.1-7
/
2016
Construction in the UK is the second most dangerous industry in terms of fatal and minor injuries according to the 2014 report of HSE. The use of mobile devices such as iPad, Tablets and Smart phones on the live construction projects is also on the increase in the UK due to the 2016 - Level 2 BIM (Building Information Modelling) implementation target, set by the UK Government. Hence, the use of such devices may become a distraction from work activities on the construction sites and will cause a major risk to the end users. The subject of improving safety of BIM use is widely researched, but there is a gap in knowledge about the actual use of the mobile devices and perception of 'Site BIM', on the construction site activities. The main gap identified in the 'Site BIM' is the health and safety aspect of using such devices on the construction sites. A safer way of working with such devices needs to be identified to avoid any potential site hazards and fatalities before the widespread use of the devices are found on the construction projects. In that context, the paper is aimed to highlight the safety issues that are required to address for the successful implementation of the mobile devices for safer use of the 'Site BIM'. Questionnaire survey was used to collect the site information among construction professionals in the UK. The survey findings suggested that a proactive approach may be helpful to stop potential hazards and risks causing by the use of mobile devices and potential measures need to be identified before any injuries and incidents occur. The paper concludes that training, changing size of mobile devices and ensuring a separate induction training for 'Site BIM' tools will improve the health and safety of the end users of the mobile devices at the live construction sites.
Journal of the Korea Institute of Building Construction
/
v.21
no.4
/
pp.361-375
/
2021
Seoul metropolitan government of South Korea has large population and facilities, and lots of building construction have been performed in urban area. Many safety accidents with causing lives and property damages occurred at construction sites in South Korea and Seoul. Thus, Korea government and Seoul have made efforts to secure the safety of construction sites. In this study, current law and measures by central department and Seoul were analyzed to find limitations and improvement points in construction safety management. Safety inspection results for construction sites in Seoul were investigated to demonstrate the main hazard work and safety risk, and interview surveys targeting safety managing persons were performed according to safety management, inspection, and education. Based on analytical results of current status on safety management, improvement measures were proposed for safety secure on construction safety in Seoul. The proposed measures include improvement of safety management systems, alleviation of safety blind spots according to construction size, strengthening efficiency of safety management, and autonomous safety engagement by construction sites centered.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.