• Title/Summary/Keyword: risk management method

Search Result 1,580, Processing Time 0.031 seconds

The Effect of Construction Safety Supervision System on Risk Control and Reduction (건설안전감리제도가 위험제어 및 절감에 미치는 영향)

  • Lim, Jin-Sang;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.1-9
    • /
    • 2018
  • This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.

Optimal Hedge Strategy Using Future Contract in the Vesting Contract Electricity Market (베스팅계약 전력시장에서 선물 최적헷지전략 연구)

  • 맹근호;송광재;박종근
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.7
    • /
    • pp.414-419
    • /
    • 2004
  • In TWBP new uncertainty will be increased. Risk management is risen to a important problem. Vesting contract makes market Players trade at fixed price in TWBP early stages. In the case of advanced country, market players manage risk with a future contract. When a risk management method moves from vesting contract to future contract, it may have to use together two contracts for schedule period. In this paper, risk management strategy that use vesting contract and forward contract at the same time is proposed.

Case Studies of Risk Assessment in Analyzing Risks Associated with MSDS

  • Kim, Woo Jin;Jeong, Byung Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.32 no.1
    • /
    • pp.153-158
    • /
    • 2013
  • Objective: This study aims to suggest different approaches in analyzing risks associated with musculoskeletal disorders (MSDS) for risk assessment. Background: Upon concluding that the changes in the industrial environments have made it hard to regulate diverse risk factors, the government has implemented a policy for risk assessment. Method: This study has proposed a method, creating programs using Excel that perform qualitative or quantitative analysis, for evaluating risk factors in risk assessments and has applied this in manufacture and service industries. Results: To verify the validity of the developed program, risk assessment has been performed on restaurant chefs as an example. For quantitative evaluation, the study has suggested approaches using the results for REBA evaluation and the analysis report on the work scenes of a fitting-shop in a shipbuilding industry. Application: Constructing and adapting a system using Excel in evaluating risk factors for risk assessments as this study suggests, is expected to contribute to revitalizing risk assessments.

Analysis of the Project Risk Factors Using Modified Kano Model (수정된 Kano 모델을 이용한 프로젝트의 위험요인 연구)

  • Jang, Deok-Jae;Song, HaeGeun;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.2
    • /
    • pp.221-232
    • /
    • 2013
  • Purpose: This paper examines risk factors which affect project success, and proposes a method utilizing the average potential satisfaction index(API) to evaluate how much the satisfaction level of the personnel involved in the project can change by reducing the risk. Methods: The current study derives 11 risk factors affecting project success from literature review and conducts survey of 253 subjects who have project work experience. A modified Kano's questionnaire using 5-point Likert-scale is applied to investigate the amount of satisfaction or dissatisfaction when the risk factors are reducted or not, respectively. Results: The respondents consider that the risk factors which include the three elements of project management(schedule, quality, cost) is more important than other risk factors related to the project environment, and technology and profitability. Conclusion: The average potential satisfaction index proposed in this study can measure the perception on the risk factors of the personnel involved in the project, since it has a strong correlation with the perceived importance by the respondents in this study.

Library Risk Management and Insurance (도서관 리스크관리와 보험)

  • Chung, Hye-Kyoung
    • Journal of Information Management
    • /
    • v.31 no.4
    • /
    • pp.1-12
    • /
    • 2000
  • The potential risks, involved with the management of a library, may cause a tremendous economic loss, so require a systematic management. The rist management process, consisting of risk identification, risk measurement selection of risk treatment methods, implementation, and monitoring and evaluation, suggests the use of insurance to deal with property risks, liability risks and personnel risks. For the systematic risk management of a library, risk manager should be appointed to be responsible for program development and insurance purchase. The limited coverage of library risks, provided by the school cooperative society, should be supplemented through development of insurance products. Further study is required to improve the library risk management and the application of insurance in a systematic and realistic way.

  • PDF

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Study on the Risk Management of International Sale Transactions (국제물품매매거래의 위험관리에 관한 고찰 - Lite-On 사건의 위험관리적 분석을 중심으로 -)

  • Han, Nak-Hyun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.30
    • /
    • pp.59-88
    • /
    • 2006
  • After sources of risks are identical and measured, a decision can be made as to how the risk should be handled. A pure risk that is not identical does not disappear ; the business merely loses the opportunity to consciously decide on the best technique for dealing with that risk. The process used to systematically manage risk exposures is known as risk management. Risk management is the logical process used by business firms and individuals to deal with their exposures to loss. It is a strategy of preloss planning for postloss resources. Besides, in the enterprise judiciary researches the textbook and the instance which relate risks, and reflects it to the written contract provision and various every manuel or holds seminar. It is a risk management which this talks generally. Here it stands but it becomes a problem the quality of type and countermeasure of risks. The purpose of this paper aims to explain adequate preventions to positively predict the risk this before being materialized, in practical section which is directly exposed to these risks in introducing international sale contracts(for example, the FOB and CIF contract) and the active management method of the risk which accompanys to the execution. And also analyzes the Lite-On case which relates with an international sale contracts.

  • PDF

Construction site disaster risk analysis method Using big data Considering individual work units of construction partner company (협력업체 작업 단위를 고려한 빅데이터 기반 건설현장 재해위험도 분석 방안)

  • Choi, Hochang;Lee, Jung-chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.265-266
    • /
    • 2023
  • Recently, many disasters have occurred due to poor management of construction site. In addition, as legal regulations on safety management at construction sites are strengthened, its importance is being further emphasized. In relation to smart safety management technology, a study was introduced to build an analysis model through various safety-related data collected within construction companies. This model derives quantitative disaster risk about the site level through information related to past disasters and near misses. However, construction work is performed separately by work group of each partner company. There is a limitation in that individual workers cannot directly experience this analysis information. In this study, we propose a method to derive the safety disaster risk of individual work units from disaster risk of the site level. We expect that this study to be helpful for smart safety management technology of construction sites.

  • PDF

A Framework for Climate Change Risk Management (기후변화 위험관리를 위한 체계)

  • Lee, Seungjun
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.3
    • /
    • pp.367-379
    • /
    • 2019
  • Purpose: This study aims to propose a framework for climate change risk management by analyzing characteristics of climate-induced disasters. Method: The recent global and domestic trends of loss and damage under natural disaster events and the characteristics of climate-induced disasters were analyzed to design a framework for climate change risk management. Results: In consideration of the uncertainty of climate risk and various spatio-temporal scales of climate disasters, a new framework is suggested for comprehensive climate risk management that includes risk assessment, goal setting, planning, monitoring and evaluation, learning and adjustment. The framework aims at an iterative process that is activated by stakeholder engagement. Conclusion: Pilot studies need to be conducted to revise and polish the framework in the future, and institutional arrangements should be prepared for the effective implementation of the comprehensive climate risk management.

Probabilistic Risk Evaluation Method for Human-induced Disaster by Risk Curve Analysis (확률.통계적 리스크분석을 활용한 인적재난 위험평가 기법 제안)

  • Park, So-Soon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.6
    • /
    • pp.57-68
    • /
    • 2009
  • Recently, damage scale of human-induced disaster is sharply increased but its occurrences and damages are so uncertain that it is hard to construct a resonable response & mitigation plan for infrastructures. Therefore, the needs for a advanced risk management technique based on a probabilistic and stochastic risk evaluation theory is increased. In this study, these evaluation methods were investigated and a advanced disaster risk evaluation method, which is based on the probabilistic or stochastic risk assessment theory and also is a quantitative evaluation technique, was suggested. With this method, the safety changes as the result of fire damage management for recent 40 years was analyzed. And the result was compared with that of Japan. Through the consilience of the traditional risk assessment method and this method, a stochastical estimation technique for the uncertainty of future disaster's damage could support a cost-effective information for a resonable decision making on disaster mitigation.