• Title/Summary/Keyword: risk assessment method

Search Result 1,287, Processing Time 0.029 seconds

Risk assessment of water inrush in karst tunnels based on a modified grey evaluation model: Sample as Shangjiawan Tunnel

  • Yuan, Yong-cai;Li, Shu-cai;Zhang, Qian-qing;Li, Li-ping;Shi, Shao-shuai;Zhou, Zong-qing
    • Geomechanics and Engineering
    • /
    • v.11 no.4
    • /
    • pp.493-513
    • /
    • 2016
  • A modified grey clustering method is presented to systematically evaluate the risk of water inrush in karst tunnels. Based on the center triangle whitenization weight function and upper and lower limit measure whitenization weight function, the modified grey evaluation model doesn't have the crossing properties of grey cluster and meets the standard well. By adsorbing and integrating the previous research results, seven influence factors are selected as evaluation indexes. A couple of evaluation indexes are modified and quantitatively graded according to four risk grades through expert evaluation method. The weights of evaluation indexes are rationally distributed by the comprehensive assignment method. It is integrated by the subjective factors and the objective factors. Subjective weight is given based on analytical hierarchy process, and objective weight obtained from simple dependent function. The modified grey evaluation model is validated by Jigongling Tunnel. Finally, the water inrush risk of Shangjiawan Tunnel is evaluated by using the established model, and the evaluation result obtained from the proposed method is agrees well with practical situation. This risk assessment methodology provides a powerful tool with which planners and engineers can systematically assess the risk of water inrush in karst tunnels.

A Study on the Collecting Method of Reliability Database for Gas Facilities (가스설비의 신뢰도데이터 수집방법에 관한 연구)

  • Rhie, Kwang-Won;Yoon, Ik-Keun;Han, Sang-Tae;Oh, Sin-Kyu;Kim, Tae-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.2
    • /
    • pp.37-44
    • /
    • 2008
  • The safety assessment for facility industry is now being periodically performed. For the purpose of scientific safety management, QRA(Quantitative Risk Assessment) is also being performed, and reliability data of the facilities is essential to perform the assessment. Generally, the existing safety assessment is performed by using the values announced in other industry processes, which result in the drop of reliability. In order to solve this problem, there is an urgent need to establish reliability database for the facilities. The most appropriate method is to perform a direct reliability analysis towards the facilities undergoing safety assessment. In this study, in compliance with the assessment method and procedure of OREDA-2002 handbook, the facility reliability data are collected, which include the calendar time and operational time in terms of different facility items, the number of failures in terms of different failure mode, the mean, standard deviation, lower limit and upper limit of failure rate, and the failure rate. And the data process method for this special occasion is also proposed when the number of failure is 0.

Risk Assessment for the Failure of an Arch Bridge System Based upon Response Surface Method(I): Component Reliability (응답면 기법에 의한 아치교량 시스템의 붕괴 위험성평가(I): 요소신뢰성)

  • Cho, Tae-Jun;Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.6 s.78
    • /
    • pp.74-81
    • /
    • 2006
  • Probabilistic Risk Assessment considering statistically random variables is performed for the preliminary design of a Arch Bridge. Component reliabilities of girders have been evaluated using the response surfaces of the design variables at the selected critical sections based on the maximum shear and negative moment locations. Response Surface Method(RSM) is successfully applied for reliability analyses for this relatively small probability of failure of the complex structure, which is hard to be obtained by Monte-Carlo Simulations or by First Order Second Moment Method that can not easily calculate the derivative terms of implicit limit state functions. For the analysis of system reliability, parallel resistance system composed of girders is changed into parallel series connection system. The upper and lower probabilities of failure for the structural system have been evaluated and compared with the suggested prediction method for the combination of failure modes. The suggested prediction method for the combination of failure modes reveals the unexpected combinations of element failures in significantly reduced time and efforts compared with the previous permutation method or system reliability analysis method.

Risk Assessment for a Bridge System Based upon Response Surface Method Compared with System Reliability (체계신뢰성 평가와 비교한 응답면기법에 의한 교량시스템의 위험성평가)

  • Cho, Tae-Jun;Moon, Jae-Woo;Kim, Jong-Tae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.295-300
    • /
    • 2007
  • Probabilistic Risk Assessment considering statistically random variables is performed for the preliminary design of a Arch Bridge. Component reliabilities of girders have been evaluated using the response surfaces of the design variables at the selected critical sections based on the maximum shear and negative moment locations. Response Surface Method (RSM) is successfully applied for reliability analyses for this relatively small probability of failure of the complex structure, which is hard to be obtained by Monte-Carlo Simulations or by First Order Second Moment Method that can not easily calculate the derivative terms of implicit limit state functions. For the analysis of system reliability, parallel resistance system composed of girders is changed into parallel series connection system. The upper and lower probabilities of failure for the structural system have been evaluated and compared with the suggested prediction method for the combination of failure modes. The suggested prediction method for the combination of failure modes reveals the unexpected combinations of element failures in significant]y reduced time and efforts compared with the previous permutation method or system reliability analysis method.

  • PDF

Direct fault-tree modeling of human failure event dependency in probabilistic safety assessment

  • Ji Suk Kim;Sang Hoon Han;Man Cheol Kim
    • Nuclear Engineering and Technology
    • /
    • v.55 no.1
    • /
    • pp.119-130
    • /
    • 2023
  • Among the various elements of probabilistic safety assessment (PSA), human failure events (HFEs) and their dependencies are major contributors to the quantification of risk of a nuclear power plant. Currently, the dependency among HFEs is reflected using a post-processing method in PSA, wherein several drawbacks, such as limited propagation of minimal cutsets through the fault tree and improper truncation of minimal cutsets exist. In this paper, we propose a method to model the HFE dependency directly in a fault tree using the if-then-else logic. The proposed method proved to be equivalent to the conventional post-processing method while addressing the drawbacks of the latter. We also developed a software tool to facilitate the implementation of the proposed method considering the need for modeling the dependency between multiple HFEs. We applied the proposed method to a specific case to demonstrate the drawbacks of the conventional post-processing method and the advantages of the proposed method. When applied appropriately under specific conditions, the direct fault-tree modeling of HFE dependency enhances the accuracy of the risk quantification and facilitates the analysis of minimal cutsets.

Sample Size Estimation for Risk Assessment and Monitoring Based on Heavy Metal Monitoring Data from Food Items (위해평가 및 모니터링 수행을 위한 표본크기 추정연구: 식품 중 중금속 모니터링 데이터를 중심으로)

  • Kang, Hui Seung;Ko, Ahra;Jeong, Da-Hyun;Ha, Mira;Hwang, Myung-Sil;Hong, Jin-Hwan;Hwang, In Gyun;Yoon, Hae-Jung
    • Journal of Food Hygiene and Safety
    • /
    • v.30 no.2
    • /
    • pp.127-131
    • /
    • 2015
  • This study aimed to calculate the required sample size to monitor food items during risk assessment studies. Based on a data set from a previous study (2,400 data points for heavy metal assessment from 17 food items), the required sample size was estimated by using a single equation with the standard deviation value, error range, and 95%-99% confidence intervals. The required sample size was calculated with each of the heavy metals for the assessment. The results showed that cadmium, lead, and mercury of required sample sizes for further monitoring were range of 7-90, 7-1, 062, and 11-238, respectively. We found that the required sample size varied depending on the standard deviation of the previous monitoring data. This study provides a basic method to determine the minimum sample size required in food monitoring to devise practical sampling strategies.

Indoor Exposure and Health Risk of Polycyclic Aromatic Hydrocarbons (PAHs) in Public Facilities, Korea

  • Kim, Ho-Hyun;Lim, Young-Wook;Jeon, Jun-Min;Kim, Tae-Hun;Lee, Geon-Woo;Lee, Woo-Seok;Lim, Jung-Yun;Shin, Dong-Chun;Yang, Ji-Yeon
    • Asian Journal of Atmospheric Environment
    • /
    • v.7 no.2
    • /
    • pp.72-84
    • /
    • 2013
  • In the study, pollution levels of indoor polycyclic aromatic hydrocarbons (PAHs) in public facilities (vapor phase or particulate phase) were evaluated, and a health risk assessment (HRA) was carried out based on exposure scenarios. Public facilities in Korea covered by the law, including underground subway stations, funeral halls, child care facilities, internet cafes (PC-rooms), and exhibition facilities (6 locations for each type of facility, for a total of 48 locations), were investigated for indoor assessment. For the HRA, individual excess cancer risk (ECR) was estimated by applying main toxic equivalency factor (TEF) values suggested in previous studies. Among the eight public facilities, internet cafes showed the highest average $PM_{2.5}$ concentration at $110.0{\mu}g/m^3$ (range: $83.5-138.5{\mu}g/m^3$). When assuming a risk of facility exposure time based upon the results of the surveys for each public facility, the excess cancer risk using the benzo(a)pyrene indicator assessment method was estimated to be $10^{-7}-10^{-6}$ levels for each facility. Based on the risk associated with various TEF values, the excess cancer risk based upon the seven types cancer EPA (1993) and Malcolm & Dobson's (1994) assessment method was estimated to be $10^{-7}-10^{-5}$ for each facility. The excess cancer risk estimated from the TEF EPA (2010) assessment was the highest: $10^{-7}-10^{-4}$ for each facility. This is due to the 10-fold difference between the TEF of dibenzo(a,e)fluoranthene in 2010 and in 1994. The internet cafes where smoking was the clear pollutant showed the highest risk level of $10^{-4}$, which exceeded the World Health Organization's recommended risk of $1{\times}10^{-6}$. All facilities, with the exception of internet cafes, showed a $10^{-6}$ risk level. However, when the TEFs values of the US EPA (2010) were applied, the risk of most facilities in this study exceeded $1{\times}10^{-6}$.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A Case Study for the Selection of a Railway Human Reliability Analysis Method (철도 인간신뢰도분석 방법 선정을 위한 사례분석)

  • Jung, Won-Dea;Jang, Seung-Cheol;Wang, Jong-Bae;Kim, Jae-Whan
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.5 s.36
    • /
    • pp.532-538
    • /
    • 2006
  • The railway human reliability analysis(R-HRA) plays a role of identifying and assessing human failure events in the framework of the probabilistic risk assessment(PRA) of the railway systems. This study introduces a case study that was performed to select an appropriate R-HRA method. Three HRA methods were considered in the case study: (1) the K-MRA(THERP/ASEP-based) method, (2) the HEART method, (3) the RSSB-HRA method. Two case events were selected based on the review of the railway incidents/accidents, which include (1) a real-end collision event, which occurred on the railway between the Gomo and Kyungsan stations in 2003, (2) the signal passed at danger(SPAD) events, which are caused from a variety of factors. The three HRA methods were applied to both case events, and then the strengths and limitations of each method were derived and compared with each other from the viewpoint of the applicability of a HRA method to the railway industry.

Study on the Selection and Application of a Spatial Analysis Model Appropriate for Selecting the Radon Priority Management Target Area (라돈 우선관리 대상 지역 선정에 적합한 공간분석모형의 선정 및 활용에 관한 연구)

  • Nam Goung, Sun Ju;Choi, Kil Yong;Hong, Hyung Jin;Yoon, Dan Ki;Kim, Yoon Shin;Park, Si Hyun;Kim, Yoon Kwan;Lee, Cheol Min
    • Journal of Environmental Health Sciences
    • /
    • v.45 no.1
    • /
    • pp.82-96
    • /
    • 2019
  • Objective: The aims of this study were to provide the basic data for establishing a precautionary management policy and to develop a methodology for selecting a radon management priority target area suitable for the Korean domestic environment. Methods: A suitable mapping method for the domestic environment was derived by conducting a quantitative comparison of predicted values and measured values that were calculated through implementation of two models such as IDW and RBF methods. And a qualitative comparison including the clarity of information transmission of the written radon map was carried out. Results: The predicted and measured values were obtained through the implementation of the spatial analysis models. The IDW method showed the lowest in the calculated mean square error and had a higher correlation coefficient than the other methods. As results of comparing the uncertainty using the jackknife concept and the concept of error distance for comparison of the differences according to the model interpolation method, the sum of the error distances showed a modest increase compared with the RBF method. As a result of qualitatively comparing the information transfer clarity between the radon maps prepared with the predicted values through the model implementation, it was found that the maps plotted using the predicted values by the implementation of the IDW method had greater clarity in terms of highness and lowness of radon concentration per area compared with the maps plotted by other methods. Conclusions: The radon management priority area suggests selecting a metropolitan city including an area with a high radon concentration.