• Title/Summary/Keyword: result from fuzzy logic

Search Result 86, Processing Time 0.023 seconds

Application of KITSAT-3 Images: Automated Generation of Fuzzy Rules and Membership Functions for Land-cover Classification of KITSAT-3 Images

  • Park, Won-Kyu;Choi, Soon-Dal
    • Proceedings of the KSRS Conference
    • /
    • 1999.11a
    • /
    • pp.48-53
    • /
    • 1999
  • The paper presents an automated method for generating fuzzy rules and fuzzy membership functions for pattern classification from training sets of examples and an application to the land-cover classification. Initially, fuzzy subspaces are created from the partitions formed by the minimum and maximum of individual feature values of each class. The initial membership functions are determined according to the generated fuzzy partitions. The fuzzy subspaces are further iteratively partitioned if the user-specified classification performance has not been archived on the training set. Our classifier was trained and tested on patterns consisting of the DN of each band, (XS1, XS2, XS3), extracted from KITSAT-3 multispectral scene. The result represents that our classification method has higher generalization power.

  • PDF

Fuzzy Logic Architecture for Deciding the Ranking at Racing Games (레이싱 게임에서 순위 결정을 위한 퍼지 논리 아키텍처)

  • Lee Se Il
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.1 s.33
    • /
    • pp.133-140
    • /
    • 2005
  • If a Player car precedes from start to the end or a fuzzy car wins every day during computer or racing games, most players will lose their interest in the games soon after several times. In order to solve this Problem and increase amusement at racing games, the more important thing than anything else is decide the ranking. In this thesis, in order to give amusement In racing games, the researcher made a fuzzy car and made it race with player cars. Because the preceding fuzzy car runs ahead of player cars, it can recognize their behaviors according to change of following player cars' speed and distance, and the fuzzy car changes its memory, but doesn't enforce actual behaviors. If the fuzzy car would make decision, it has to do behaviors to compete the ranking on the basis of the contracts it has memorized under the situation where a timer is awarded. In addition, although an accompanying fuzzy car has different contents of memory, it is operated in the same way as mentioned above. At the time of experiments, the researcher applied the actual value to the test program and drew result for ranking competition. In conclusion, the researcher could confirm that we can have modeling of various behaviors by means of the method using fuzzy logic rather than simple if-then method.

  • PDF

Evaluation of Arousal Level to Prevent Drowsy Driving by Fuzzy Inference (졸음운전 방지를 위한 fuzzy 추론에 의한 각성도의 평가)

  • Kim, Y. H.;Ko, H. W.;Lyou, J.
    • Journal of Biomedical Engineering Research
    • /
    • v.18 no.4
    • /
    • pp.491-498
    • /
    • 1997
  • This paper describes the arousal measurement and control system using fuzzy logic to prevent drowsy driving. Sugeno's method was used for fuzzy inference in this study. Arousal evaluation and control criteria were modified from result of Nz-IRI analysis depending on arousal sate. Membership function and rule base of fuzzy inference were determined from the modified arousal level criteria When lRl (Inter-SIR Interval) was shorter than 60sec, outputs of both methods were changed from small to big, but output of three step warning method was same level until the next warning range. Since output of fuzzy inference tracked well the change of subject's arousal level, problems of three step warning method could be overcome by fuzzy inference method Furthermore, the output of the fuzzy inference was highly correlated with Nz(r = 0.99). Therefore, the fuzzy inference method for evaluation and the control of arousal will be more effective at real driving situation than three step warning method.

  • PDF

Derivation of a Linear PID Control Law from a Fuzzy Control Theory (퍼지 제어기로부터 PID 제어기의 구현에 관한 연구)

  • 최병재;김병국
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.7 no.2
    • /
    • pp.70-78
    • /
    • 1997
  • Proportional-integral-derivative(P1D) controllers have been still widely used in industrial processes due to their simplicity, effectiveness, robustness for a wide range of operating conditions, and the familiarity of control engineers. And a number of recent papers in fuzzy systems are showing that fuzzy systems are universal approximators. That is, fuzzy controllers are capable of approximating any real continuous function on a compact set of arbitrary accuracy. In this paper, we derive the linear PID control law from the fuzzy control algorithm where all fuzzy sets for representing plant state variables and a control variable use common triangular types. We first lead a linear PD control law from a fuzzy logic control with only two fuzzy sets for error and change-of-error. And then we derive the linear PID control law from a fuzzy controller. We here assumed that the intervals of error, change-of-error, and integral error could be partitioned into arbitrary numbers, respectively. As a result, a linear PID controller is only a sort of various fuzzy logic controls.

  • PDF

A Fixed Point for Pair of Maps in Intuitionistic Fuzzy Mtric Space

  • Park, Jong-Seo;Kim, Seon-Yu
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.7 no.3
    • /
    • pp.159-164
    • /
    • 2007
  • Park, Park and Kwun[6] is defined the intuitionistic fuzzy metric space in which it is a little revised from Park[5]. According to this paper, Park, Kwun and Park[11] Park and Kwun[10], Park, Park and Kwun[7] are established some fixed point theorems in the intuitionistic fuzzy metric space. Furthermore, Park, Park and Kwun[6] obtained common fixed point theorem in the intuitionistic fuzzy metric space, and also, Park, Park and Kwun[8] proved common fixed points of maps on intuitionistic fuzzy metric spaces. We prove a fixed point for pair of maps with another method from Park, Park and Kwun[7] in intuitionistic fuzzy metric space defined by Park, Park and Kwun[6]. Our research are an extension of Vijayaraju and Marudai's result[14] and generalization of Park, Park and Kwun[7], Park and Kwun[10].

Fuzzy Based Failure Mode and Effect Analysis (FMEA) of Hydrogen Production Process Using the Thermococcus Onnurineus NA1 (퍼지기반 해양 미생물 이용 수소 제조 공정의 고장유형 및 영향분석)

  • PARK, SUNG HO;AHN, JUNKEON;KIM, SU HYUN;YOO, YOUNG DON;CHANG, DAEJUN;KANG, SUNGKYUN
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.29 no.4
    • /
    • pp.307-316
    • /
    • 2018
  • In this study, the failure mode and effect analysis (FMEA) of hydrogen production process by using the Thermococcus onnurineus NA1 was conducted and advanced methodology to compensate the weakness of previous FMEA methodology was applied. To bring out more quantitative and precise FMEA result for bio-hydrogen production process, fuzzy logic and potential loss cost estimated from ASPEN Capital Cost Estimator (ACCE) was introduced. Consequently, risk for releasing the flammable gases via internal leakage of steam tube which to control the operating temperature of main reactor was caution status in FMEA result without applying the fuzzification and ACCE. Moreover, probability of the steam tube plugging caused by solid property like medium was still caution status. As to apply the fuzzy logic and potential loss cost estimated from ACCE, a couple of caution status was unexpectedly upgraded to high dangerous status since the potential loss cost of steam tube for main reactor and decrease in product gases are higher than expected.

Prediction of Land-cover Change in the Gongju Areas using Fuzzy Logic and Geo-spatial Information (퍼지 논리와 지리공간정보를 이용한 공주지역 토지피복 변화 예측)

  • Jang, Dong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.6
    • /
    • pp.387-402
    • /
    • 2005
  • In this study, we tried to predict the change of future land-cover and relationships between land-cover change and geo-spatial information in the Gongju area by using fuzzy logic operation. Quantitative evaluation of prediction models was carried out using a prediction rate curve using. Based on the analysis of correlations between the geo-spatial information and land-cover change, the class with the highest correlation was extracted. Fuzzy operations were used to predict land-cover change and determine the land-cover prediction maps that were the most suitable. It was predicted that in urban areas, the urban expansion of old and new towns would occur centering on the Gem-river, and that urbanization of areas along the interchange and national roads would also expand. Among agricultural areas, areas adjacent to national roads connected to small tributaries of the Gem-river and neighboring areas would likely experience changes. Most of the forest areas are located in southeast and from this result we can guess why the wide chestnut-tree cultivation complex is located in these areas and the possibility of forest damage is very high. As a result of validation using the prediction rate curve, it was indicated that among fuzzy operators, the maximum fuzzy operator was the most suitable for analyzing land-cover change in urban and agricultural areas. Other fuzzy operators resulted in the similar prediction capabilities. However, in the prediction rate curve of integrated models for land-cover prediction in the forest areas, most fuzzy operators resulted in poorer prediction capabilities. Thus, it is necessary to apply new thematic maps or prediction models in connection with the effective prediction of changes in the forest areas.

Fuzzy optimization for the removal of uranium from mine water using batch electrocoagulation: A case study

  • Choi, Angelo Earvin Sy;Futalan, Cybelle Concepcion Morales;Yee, Jurng-Jae
    • Nuclear Engineering and Technology
    • /
    • v.52 no.7
    • /
    • pp.1471-1480
    • /
    • 2020
  • This research presents a case study on the remediation of a radioactive waste (uranium: U) utilizing a multi-objective fuzzy optimization in an electrocoagulation process for the iron-stainless steel and aluminum-stainless steel anode/cathode systems. The incorporation of the cumulative uncertainty of result, operational cost and energy consumption are essential key elements in determining the feasibility of the developed model equations in satisfying specific maximum contaminant level (MCL) required by stringent environmental regulations worldwide. Pareto-optimal solutions showed that the iron system (0 ㎍/L U: 492 USD/g-U) outperformed the aluminum system (96 ㎍/L U: 747 USD/g-U) in terms of the retained uranium concentration and energy consumption. Thus, the iron system was further carried out in a multi-objective analysis due to its feasibility in satisfying various uranium standard regulatory limits. Based on the 30 ㎍/L MCL, the decision-making process via fuzzy logic showed an overall satisfaction of 6.1% at a treatment time and current density of 101.6 min and 59.9 mA/㎠, respectively. The fuzzy optimal solution reveals the following: uranium concentration - 5 ㎍/L, cumulative uncertainty - 25 ㎍/L, energy consumption - 461.7 kWh/g-U and operational cost based on electricity cost in the United States - 60.0 USD/g-U, South Korea - 55.4 USD/g-U and Finland - 78.5 USD/g-U.

Benchmarking Evaluation of Web System Using Fuzzy Sets

  • Jeong, Gu-Beom;Kim, Doo-Ywan;Her, Chol-Hoi
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.4 no.3
    • /
    • pp.292-299
    • /
    • 2004
  • For Web System composed of a variety of hardware, software and network system, there is a wide difference in price, function and capacity. In addition, it is important to select the most suitable system when web system is constructed as the claim of high-quality web service from user has increased. Data of bench-marking is usually employed when the system is selected. Evaluation with the result of bench-marking, however, is not easy at web situation composed of a variety of systems. In this paper, first integrated bench-marking of hardware, software and network system metric were determined, and the plan to effectively compare and evaluate the result of bench-marking by using fuzzy set were offered.

Analysis for Electrical Fire Possibility Using Fuzzy Logic with Input Variables of Overcurrent and Saturation Time in the Indoor Wiring (전기배선에서 과전류와 포화시간을 입력변수로 갖는 퍼지기반 전기화재가능성 분석)

  • Kim, Eun-Jin;Kim, Doo-Hyun;Kim, Sung-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.6
    • /
    • pp.34-39
    • /
    • 2015
  • The study is aimed to develop fuzzy logic system that has overcurrent and saturation time as input variable and possibility of electrical fire as output variable by making bad conductor area with physical damage to indoor wiring. Most previous studies focused on thermal characteristics depending on the current size and no study considered the current size and saturation time at the same time. Therefore, the paper made into account current value and saturation time together. To this end, it created bad conductor area half the size of IV conductor (1.6 mm) on purpose and transmit electrical current from 10A to 60A by unit of 2A to find out the thermal characteristics and saturation time for current. Based on the data that came out, the study applied fuzzy logic and established the current and saturation time as input variable and chance of fire as output variable. As a result, the center of area of the system that depended only on the existing current value was 75 while the system that applied both current and saturation time presented the chance of fire at 92. It is found that the chance of bad conductor area and deteriorated insulation of electrical wire had current and saturation time as important variables. The data can be used as basic data like deteriorated wire insulation or operation features of circuit breaker in investigating the cause of electrical fire.