• Title/Summary/Keyword: restoration projects and guidelines

Search Result 14, Processing Time 0.015 seconds

A Study on Priority of Planning Factors for Stream Restoration Applied AHP (하천복원 계획 요소 우선순위 도출 연구)

  • Choi, Ok-Hyun;Ahn, Tong-Mahn
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.4
    • /
    • pp.51-60
    • /
    • 2012
  • Most streams in Korea have been managed mainly for the control of flood or usages of the water for agriculture, industry, and others, resulting in the loss of their natural characteristics. In recent years, ecological system and function of streams are recognized as very important, and a paradigm change in their management is prevailing. This study, first, analyzed recent stream restoration policies and projects and derived major restoration planning factors; second, evaluated relative importance and priority of the factors using AHP (Analytic Hierarchy Process) method. The derived planning factors were four factors for the level 1, and sixteen factors for the level 2. Relative importance and priority of each factor were calculated, and finally, a composite relative importance and priority of all the factors were suggested. These findings are hoped to support stream restoration policies and be used in drafting restoration guidelines.

A Study on Environment-friendly Location & Review Criteria by Development Project Types (개발사업 유형별 환경친화적 입지 및 검토기준 연구)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.4
    • /
    • pp.34-46
    • /
    • 2009
  • and to provide (case example-focused) guidelines for environment-friendly oriented plans. Key findings of this study are as follows : first, a total of 2,465 development projects covering $173km^2$ were undertaken in Gyeonggi province in last three years. Second, based on the analysis of 16 development projects in four types, about 20 alternative environment-friendly location were suggested. Thirdly, 56 environment-friendly criteria were suggested for the environmental assessment items by setting at least three alternatives. Going forward, if discussion case examples by project type, environment-friendly location criteria by project type, and environment friendly review criteria by assessment item suggested in this study are fully utilized when initiating or approving various development projects in the future, environment-friendliness will be enhanced in development projects.

Ecological Restoration Planting Design Awareness Survey (생태복원 사업에서의 식재 설계에 관한 인식 조사)

  • Cho, Dong-gil
    • Journal of Environmental Science International
    • /
    • v.31 no.7
    • /
    • pp.579-592
    • /
    • 2022
  • Much controversy has been generated over whether the ecological restoration project in Korea is faithful to the basic approach of ecological restoration compared to projects aimed at creating parks or green spaces. This study was aimed at understanding the level of awareness of practitioners in the planting design method, which is recognized as relatively important in landscape architecture and ecological restoration. The proficiency of practitioners in planting design techniques for ecological restoration projects was investigated and analyzed in seven areas: overall planting design awareness, plant species selection method, planting tree sizes, planting density, use of native species, vegetation climatic zone, soil environment, and weed control. There was no statistically significant difference between the group who thought they were experts in the field of ecological restoration and the group who thought they were experts in the field of parks and green spaces. Moreover, there was no statistically significant difference between the degree of work performance, that is, the group whose main industry was ecological restoration, the group that performed relatively more ecological restoration work, and the group that rarely performed it. Therefore, to apply desirable ecological restoration techniques in the future and to clearly differentiate between the approach in the field of parks and green spaces, the appropriate tree size or planting density selected in the ecological restoration planting design stage must be chosen. To this end, the awareness of expert groups must be improved and related laws, systems, and guidelines must be revised.

A Study on the Post-management and Improvement of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업 사후관리 실태와 개선 방안)

  • Lee, Ji Hyun;Sung, Hyun Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.

Study on Improving Environmental Impact Assessment of Carbon Sink in the Greenhouse Gas Evaluation Criteria for Railway Construction Projects for Carbon Neutrality (탄소 중립을 위한 철도 건설 사업 온실가스 평가항목의 탄소흡수원 분야 환경영향평가 개선 방안 연구)

  • Hwang, Jin-hoo;Namuun, Tuvshinjargal;Won, Joo-hee;Kim, Min-jeong;Park, Da-hye;Jeon, Seong-woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.3
    • /
    • pp.43-55
    • /
    • 2023
  • The railway project is an essential green transportation tool that is considered suitable for the domestic and foreign policy direction of carbon neutrality, but there are some limitations, such as damaging important carbon absorption sources during construction. This study analyzed the environmental impact assessment related to carbon absorption sources of greenhouse gas evaluation items conducted during the railway project, and limitations and implications were derived. The analysis of environmental impact assessment guidelines related to railway projects and carbon absorption sources dealt with prediction and reduction methods related to carbon absorption sources, but guidelines, including environmentally friendly railway construction guidelines, lacked descriptions. Since the greenhouse gas environmental impact assessment, 83 railway project environmental impact assessments have been reviewed, but in some cases, carbon absorption-related predictions have not been implemented, or carbon absorption-related reduction measures have been insufficient. In addition, there were cases where there was a limit to calculating emissions and reduction or where the reduction value was insignificant compared to emissions. In order to supplement the environmental impact assessment in the field of carbon absorption sources related to railway construction projects, alternatives such as quantitative emission and low reduction calculation, review of the no net loss system using the total environmental resource system, and linkage with climate change impact assessment are needed.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

Study on the Feeding Preferences of Luciola unmunsana Larvae (운문산반딧불이(Luciola unmunsana) 유충의 먹이선호도 연구)

  • Jeong, Moon-Sun;Kim, Jong-Man;Lim, Hyun-Jeong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.27 no.3
    • /
    • pp.19-28
    • /
    • 2024
  • The purpose of this study is to investigate the habitat of Luciola unmunsana to understand the status of land snails, which are the larvae prey, and to evaluate the effects of larval feeding preferences and prey size for the restoration of the L. unmunsana habitat as a basis for future restoration projects. The research methods included field surveys of the habitat and laboratory experiments on feeding preferences using three types of land snails (Allopeas clavulinum kyotoense, Euphaedusa fusaniana, Pupinella rufa) observed in the habitat. Field surveys of 13 L. unmunsana habitat sites revealed a total of 24 land snail species. The experimental results regarding the larvae prey were analyzed for statistical significance of feeding preferences using Chi-square tests and independent sample t-tests. Consequently, larvae showed the highest preference for A. c. kyotoense, with statistically significant differences in feeding preferences (p<0.05). Also, statistically significant differences were observed in the size between the land snails that were eaten as prey and those that were not eaten. This research can deepen the understanding of the feeding preferences of L. unmunsana larvae and provide practical guidelines for the effective conservation and restoration strategies of the firefly habitat.

Implication of Self-thinning in Salix Communities on Riverine Wetland Restoration

  • Kim, Jae-Geun;Nam, Jong-Min;Han, Mie-Hie
    • Journal of Ecology and Environment
    • /
    • v.30 no.3
    • /
    • pp.251-255
    • /
    • 2007
  • Self-thinning was measured in Salix communities on Bam Island in Seoul at various age stages. $D^2H$ was used to estimate tree biomass, where D is stem diameter at breast height or 10 cm height for plants with height <1.5 m, and H is height. A log-log plot of density versus $D^2H$ and correlation analysis indicated a significant relationship between density and biomass with equation 'log $D^2H$ = -1.27 log N + 7.06'. This indicates that self-thinning affects biomass in the Salix community with -1.27 as the thinning coefficient. If we assume a thinning exponent -3/2, then the allometric coefficient of the equation, log w = a log $D^2H$ + b, is 1.18. This is much higher than that for any other species studied in Korea. There were statistically significant relationships between age and density and between age and basal area and these relationships suggest guidelines for transplantation of willows and for the assessment of Salix community restoration projects in riverine wetlands based on standard density, basal area, and age. The results of this study may also increase understanding of succession processes in Salix community restoration in riverine wetlands.

A Study on the Status and Improvement Plan of Alternative Habitats - Based on the Projects Subject to Environmental Impact Assessment - (대체서식지 조성 현황 및 개선방안 연구 - 환경영향평가 대상 사업을 중심으로 -)

  • Shim, Yun-Jin;Jung, Gyu-Jong;Eo, Yang-Joon;Ryu, Yoon-Jin;Park, Hyun-Kyung;Kim, Dong-Hwan;Cho, Young-Ho;Yoon, Ju-Duk;Woo, Seung-Hyun;Park, Su-Gon;Jang, Eun-Hye;Chu, Yun-Soo;Park, Yong-Su
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.2
    • /
    • pp.77-85
    • /
    • 2018
  • The intensive habitats loss of natural organisms as a consequence of anthropogenic activities has lead to the use of alternative habitats for species conservation. We reviewed the current status of alternative habitats and suggest the improvement of alternative habitats. Most of alternative habitats regarded in this study are not following the pre-arranged consultation at environmental impact assessment. These alternative habitats are rendered useless due to the insufficient consideration of ecological characteristics of species and lack of detailed plans. A number of alternative habitats are influenced by disturbance such as environmental pollution and construction. Post-monitoring of alternative habitats are needed to estimate immigration rate of species. Post management is also needed to assess the status of population stability. Overall, low effectiveness of alternative habitats is presented in this study. According to the status survey, methods for improvement of alternative habitats are required such as detailed guidelines, establishment of post-monitoring system, improvement of habitat restoration techniques, and guidelines for management and operation of alternative habitats.

A Study on Improving the Unbalanced Deployment of Urban Parks (신·구시가지의 도시공원 불균형 분포 분석 및 개선방안 연구)

  • Sung, Hyun-Chan;Lee, Yang-Ju
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.3
    • /
    • pp.1-15
    • /
    • 2012
  • The objective of this study is to analyze the distribution of urban parks and its problems in a city in Gyeonggi-do where new towns and old towns are mixed. The study will also analyze and understand the unbalanced deployment of urban parks - rest areas and carbon absorbers of an entire city - between old towns and new towns, suggest improvement opportunities and examine and suggest plans to create and expand urban parks in old cities that lack urban parks. Findings showed that first, new towns were 1.2~1.6 higher than old towns in the number of parks, park area, and per capita park area, indicating that parks were unbalanced across towns. Second, as for a plan for improving the unbalanced deployment of urban parks, when the use area needs to be changed in an urban development project, it was suggested to donate 10% of the project site to the city to create it into a park and it was suggested to identify and proactively improve alternative park resources that can replace parks such as rivers and recreational sites. Third, regarding a plan for improving urban parks in old towns, it was suggested to secure urban parks by attracting various urban development projects to old town areas. The amendment of related laws was proposed to double required park area to $6m^2$ per household. Amendments were also suggested for one law and four guidelines to specifically define the location of urban parks as well.