Journal of the Korea Institute of Building Construction
/
v.19
no.1
/
pp.67-76
/
2019
The domestic construction industry is changing according to its preference for demand and supply along with urbanization and economic development. Accordingly, initial risk assessments is more important than before. In particular, demand for lease-based investment products such as commercial and office buildings has surged as a substitute for financial products due to low interest rates of banks. Therefore, the objective is to suggest a basic study on financial analysis model development by applying optimization method in residential officetel. To achieve the objective, first, the previous studies are investigated. Second, the causal loop diagram is structured based on the collected data. Third, the system dynamics method is used to develop cost-income simulation and optimization model sequentially. Finally, the developed model was verifed through analyzing a case project. In the future, the proposed model can be helpful whether or not conduct execution of an officetel development project to the decision makers.
Lineman, Maurice J.M.;Do, Yuno;Kim, Ji-Yoon;Joo, Gea-Jae
Journal of Environmental Science International
/
v.23
no.8
/
pp.1523-1536
/
2014
Restoration is the process of reducing or reversing damage to an ecosystem so that it can function in its original manner. However, many restoration programs do not achieve this. In the Nakdong Estuary, the largest migratory nesting site in the center of the East Asian-Australasian flyway, an estuarine barrage was constructed in the 1980s that required site restoration following its completion in 1987 and the expansion of several large industrial complexes(Noksan and Jangrim) and a residential development(Myeongji). The goal of the restoration was to restore the function of the wetland to its pre-disturbance state. To achieve this, a restoration program was designed consisting of three stages. The first stage(1993-1995), saw the construction of three artificial wetlands(Shinhori, Daemadeung, and Eulsuk), the second(2003-2005) involved the dredging and returning of farmed lands to their natural state, and the third(2008-2012) focused on the rehabilitation and vegetation development of the wetlands. However, the project has not achieved all of the desired goals, and it is an example of the lapses in ecological restoration following anthropogenic disturbance. Issues that resulted in an incomplete restoration included the timing of the stages, noncompliance with the restoration plan, not directly monitoring the restoration or continuing the monitoring following completion of the development project, and the political subversion of the restoration plan. For the success of the restoration plan, it is necessary to avoid mistakes such as inconsistent monitoring, unequal levels of stakeholder involvement, and political interference.
Journal of Korean Home Economics Education Association
/
v.25
no.2
/
pp.1-19
/
2013
The purpose of this study was to develope and implement a project teaching learning process plan in order to improve a creativity and character for 'residential space utilization' section of Technology Home Economics in middle school. The teaching learning process plan consisting of 15-session lessons had been developed and implemented according to the ADDIE model mixed with 6 project learning steps. In the development stage, 8 activity materials(7 individual and 1 group activity sheets) and 7 teaching learning materials(2 sets of pictures & photos, 4 moving pictures and 1 space plan resources book) were developed for the 15-session lessons. The plans applied to 5 classes 163 students in the second grade of G middle school in Gwangju during Oct. 17th to 18th of Nov. 2011. The results from the survey and portfolio showed that the 15-session lessons had overall achieved the general goal of the project teaching learning process plan to improve a creativity and character. Students were stimulated by individual and group activities with creativity and character elements in the class. The students evaluated the whole process of 15 lessons were interesting and helpful to improve creativity and consideration and cooperation of aspect of character. The individual and group results of the portfolio were excellently and creatively done with the average of nearly 85% points. The researcher also found the improving process of students in the whole classes. This plan might apply to other parts of housing as well as various other areas of home economics.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.11a
/
pp.81-82
/
2015
BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.
Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.
International conference on construction engineering and project management
/
2015.10a
/
pp.132-137
/
2015
A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.
Purpose: The purpose of this study is to explore the relationship between suburban waterfront und urban regeneration strategies. Specifically, This paper investigates how urban design strategies for suburban waterfront has been conceptualized and realized in a case-based research study of the regeneration of suburban waterfront in Berlin, Germany. Since Germany's reunification, Berlin was faced a wide variety of challenges and has been transformed into a new capital city. First of all, Wasserstadt Berlin-Oberhavel was a key development task for the urban regeneration in Berlin. The Wasserstadt Berlin-Oberhavel project with over 207 hectares will provide new residential urban areas, office spaces, educational facilities and cultural facilities. In details, 3,640 apartments with 12,700 units and around 4,800 jobs will be created. Method: The study consists of five sections. The first and second section are divided into two stages:"waterfront definition in urban design" and "urban design strategy in waterfront". The third section explores the waterfront development process of Wasserstadt Berlin-Oberhavel. The fourth section aims to investigate the strategies for urban regeneration as well as waterfront development. Finally, the fifth provides some of the key policy challenges for Urban Regeneration in suburban waterfront area. Result: The results showed that urban regeneration strategies in suburban waterfront have a substantial impact on all two dimensions: relationship between waterfront and urban context, relationship between waterfront and natural environment.
The objective of this study is to analyze the project performance and development process of the phase 1 project of GFEZ from 2004 to 2010. The phase 1 project from 2004 to 2010 is consist of eleven project zones. Among these zones, eight zones are currently underway and three zones have been completed. The performance of the phase 1 projects is no so much because it were stated later than planning with the difficulty of business developers selection. The major performances are development and supply of industrial & residential land, construction of road and railway, investment promotion of 102 companies, and creation of 20,971 new jobs. Most of the direct invested companies were located at Gwangyang and Yulchon Districts, and were mainly logistics and related service, iron and steel, machinery, shipbuilding, and fine chemicals. The main problems, however, are the limit of promotion of high-tech industries and large firms, low FDI reported rate, difficulty of superior business developers, delayed business progress of Hadong district. Therefore, efforts to solve these problems are required for the success of GFEZ.
Korean Journal of Construction Engineering and Management
/
v.25
no.4
/
pp.45-52
/
2024
Estimating the sales price of a residential building development project is difficult because of it has many complex variables such as location, environment, and economic conditions. Many previous studies related to influence factors of the sales price is to identify by survey of experts and it is few studies by comparing with actual sales price. Accordingly, the purpose of this study is to identify the factors influenced on the projects by using correlation analysis from collected actual data in this study. For the purpose, first, the factors such as economy, location, housing, financial environmental factors were identified from previous studies. Second, data were collected on actual sale prices and selected factors. Finally, the actual sales price and factors were compared and analyzed by using correlation analysis. As a result, the R2 values of economy, location, housing and financial environmental factors were over 0.5 respectively. Therefore, it was confirmed that these factors were significantly correlated with actual sales price. The results of this study are expected to be utilized as basic data for research and development of a new sale prices prediction model.
Journal of the Korea Institute of Building Construction
/
v.18
no.3
/
pp.285-294
/
2018
Due to the low interest rates of banks according to the breakdown economy after the global financial crisis in 2008 As a substitute for financial products, the investment demand has been increased for rentable investment funds such as commercial building and officetel. However, the problems such as oversupply, decrease of a rental profit and negative perception of development projects have been occurred. One of the primary problems is the existing deterministic method of project feasibility analysis. Therefore, the objective of this study is to develop feasibility model by applying system dynamics method in residential officetel. To achieve the objective, first, the previous studies are investigated. Second, the causal loop diagram is structured based on the collected data. Third, the feasibility model is developed through the causal loop diagram. Fourth, the effectiveness is validated and compared to collected actual data. The proposed model can be helpful whether or not conduct execution of an officetel development project to the decision makers.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.