• 제목/요약/키워드: reservoir routing

검색결과 61건 처리시간 0.025초

치수능력 증대에 따른 저수지시스템 분석 (Analysis of Small reservoir system by Flood control ability augmentation)

  • 박기범;이순탁
    • 한국환경과학회지
    • /
    • 제14권11호
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.

홍수 저류지 규모결정 시스템 개발 (Development of System for Sizing Flood Detention Storages)

  • 노재경;오진영;유재민
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.884-888
    • /
    • 2006
  • A system was developed to size flood detention storages at the planned Dangjin residing district. Components of system is consisted of module for deriving relationship between elevation and storage, module for calculating sediment elevation, module for setting outflow sizes and elevations, module for reservoir flood routing, and module for ascertaining sizes of detention facilities. And a system was constructed with Visual Basic 6.0. Using this system, sizes of flood detentions are able to be determined very easily and rapidly only by pushing command buttons and by viewing results.

  • PDF

영산호 운영을 위한 홍수예보모형의 개발(III) -배수갑문 조절에 의한 홍수파의 전달- (River Flow Forecasting Model for the Youngsan Estuary Reservoir Operation(III) - Pronagation of Flood Wave by Sluice Gate Operations -)

  • 박창언;박승우
    • 한국농공학회지
    • /
    • 제37권2호
    • /
    • pp.13.2-20
    • /
    • 1995
  • An water balance model was formulated to simulate the change in water levels at the estuary reservoir from sluice gate releases and the inflow hydrographs, and an one-di- mensional flood routing model was formulated to simulate temporal and spatial varia- tions of flood hydrographs along the estuarine river. Flow rates through sluice gates were calibrated with data from the estuary dam, and the results were used for a water balance model, which did a good job in predicting the water level fluctuations. The flood routing model which used the results from two hydrologic models and the water balance model simulated hydrographs that were in close agreement with the observed data. The flood forecasting model was found to be applicable to real-time forecasting of water level fluc- tuations with reasonable accuracies.

  • PDF

수리학적 홍수추적에 의한 댐 방류시 하류수위 및 주요 하도구간별 홍수도달 시간의 예측 (Forecasting of Peak Flood Stage at Downstream Location and the Flood Travel Time by Hydraulic Flood Routing)

  • 윤용남;박무종
    • 물과 미래
    • /
    • 제25권3호
    • /
    • pp.115-124
    • /
    • 1992
  • 상류댐에서의 홍수량에 의한 하류지점에서의 첨두 홍수량과 홍수 도달 시간은 수리학적 홍수추적방법에 의해 계산될 수 있다. 본 연구는 한강 유역의 전구간을 대상으로 시행되었다. 계산된 춤두 홍수량과 댐사이의 홍수도달시간은 상류에서의 방류계속시간과 바류량의 크기에 관련되어 있고 각 댐구간 사이에서 이 관계를 이용하여 다중회기모형을 제안하였다. 댐하류에서의 첨두홍수량은 수위-유량 관계식에 의해서 첨두홍수위로 변환될 수 있다. 그러므로, 제안된 다중회기모형은 상류댐에서의 홍수 방류량과 방류 계속시간에 의한 하류지점에서의 첨두홍수위와 댐구간 사이의 홍수도달시간을 예측하는데 이용될 수 있을 것이다.

  • PDF

선형 이산화 입력-출력 모형의 매개변수 결정에 관한 연구 (Estimation of Parameters of the Linear, Discrete, Input-Output Model)

  • 강주복;강인식
    • 한국환경과학회지
    • /
    • 제2권3호
    • /
    • pp.193-199
    • /
    • 1993
  • This study has two objectives. One is developing the runoff model for Hoe-Dong Reservoir basin located at the upstream of Su-Young River in Pusan. To develop the runoff model, basic hydrological parameters - curve number to find effective rainfall, and storage coefficient, etc. - should be estimated. In this study, the effective rainfall was calculated by the SCS method, and the storage coefficient used in the Clark watershed routing was cited from the report of P.E.B. The other is the derivation of transfer function for Hoe-Dong Reservoir basin. The linear, discrete, input-output model which contained six parameters was selected, and the parameters were estimated by the least square method and the correlation function method, respectively. Throughout this study, rainfall and flood discharge data were based on the field observation in 1981.8.22 - 8.23 (typhoon Gladys). It was observed that the Clark watershed routing regenerated the flood hydrograph of typhoon Gladys very well, and this fact showed that the estimated hydrological parameters were relatively correct. Also, the calculated hydrograph by the linear, discrete, input-output model showed good agreement with the regenerated hydrograph at Hoe-Dong Dam site, so this model can be applicable to other small urban areas. Key Words : runoff, effective rainfall, SCS method, clark watershed iou상ng, hydrological parameters, parameter estimation, least square method, correlation function method, input-output model, typhoon gladys.

  • PDF

웹기반 홍수관리시스템 구현을 위한 홍수분석모듈개발 (Development of Flood Analysis Module for the Implementation of a Web-Based Flood Management System)

  • 정인균;박종윤;김성준;장철희
    • 한국농공학회논문집
    • /
    • 제56권6호
    • /
    • pp.103-111
    • /
    • 2014
  • This study was to develop the flood analysis module (FAM) for implementation of a web-based real-time agricultural flood management system. The FAM was developed to apply for an individual watershed, including agricultural reservoir. This module calculates the flood inflow hydrograph to the reservoir using effective rainfall by NRCS-CN method and unit hydrograph calculated by Clark, SCS, and Nakayasu synthetic unit hydrograph methods, and then perform the reservoir routing by modified Puls method. It was programmed to consider the automatic reservoir operation method (AutoROM) based on flood control water level of reservoir. For a $15.7km^2$ Gyeryong watershed including $472{\times}10^4m^3$ agricultural reservoir, rainfall loss, rainfall excess, peak inflow, total inflow, maximum discharge, and maximum water level for each duration time were compared between the FAM and HEC-HMS (applied SCS and Clark unit hydrograph methods). The FAM results showed entirely consistent for all components with simulated results by HEC-HMS. It means that the applied methods to the FAM were implemented properly.

황룡강 유역 저수지군 하류하천 영향평가 (Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed)

  • 황순호;강문성;김지혜;송정헌;전상민;이상현;최진용
    • 한국농공학회논문집
    • /
    • 제54권3호
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

홍수추적 속산도식해법에 대한 소고 (A study on the quick graphical method of flood routing)

  • 박정근
    • 한국농공학회지
    • /
    • 제18권1호
    • /
    • pp.4079-4086
    • /
    • 1976
  • In many reservoir projects, economic considerations will necessitate a design utilizing surcharge. Determination of the most economical combination of surcharge and spillway capacity for a given spillway crest level will require flood routing studies and economic studies of the dam-reservoir-spillway combinations. Many methods of actual flood routing have been devised, each of them with its advantages and disadvantages. Some of these methods are listed below: (1) Arithmetical trial-and-error method. (2) Modified Puls' method (3) Cheng's graphical method (4) Horton's arithmetical method (5) Ekadahl's arithmetical method (6) Digital computer programming. For the purpose of preliminary design and cost estimating of dams and spillways, it is often required to estimate, for a given design flood and spillway crest level. the approximate values of two among the three characteristics of the spillway spillway length, maximum discharge and surcharge depth at maximum discharge, when one of these quantities is given. As is well known, the outflow hydrograph for an ungated overflow spillway assumes the form of a wave-shaped curve with a minimum point for Q=o At zero time and a maximum point for Q=Qmax at its intersection with the falling leg of the inflow hydrograph (see Fig. 4) The shaded area between the inflow and outflow hydrographs represents at the approximate scale the temporary retention Vt. In line with the remarks, draw by free hand the assumed outflow hydrograph with its maximum point for the given Qmax (see Fig. 4) and by planimetration find Vt. From the reservoir capacity curve (Fig. 3) find Vs for the given spillway crest level and make V=Vs+Vt. From the above curve find surcharge water elevation for V and surcharge depth Hmax over spillway crest. From the discharge formula compute {{{{L= { Q} over { { CH}^{3/2 } } }}}} The methed provides a means for a quick and fairly accurate estimation of spillway capacity.

  • PDF

홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화 (Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir)

  • 노재경
    • 한국관개배수논문집
    • /
    • 제17권2호
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF

홍수전파와 배수갑문 운영에 따른 새만금호 내부 수리특성의 동적응답 (Dynamic Response of Hydraulic Characteristics in the Inner Saemankeum Reservoir According to Gate Operation and Flood Events)

  • 서승원;조완희
    • 한국해안해양공학회지
    • /
    • 제17권4호
    • /
    • pp.269-279
    • /
    • 2005
  • 새만금호의 방조제 완공이후와 내부 개발이후 만경강 및 동진강의 홍수량 유입과 내부 수위를 관리하기 위해 수문을 작동할 매 수리특성이 어떻게 반응할 것인가를 평가하기 위한 수치실험이 수심적분된 ADCIRC 모형을 이용하여 실시되었다. 2차원 동적하도추적에 따르면, 상류에서는 홍수수문의 시간적 변화가 민감하나 홍수파가 호 내로 유하 하면서 급확대되는 물리적 특성에 따라 호 중심부터는 안정화된다. 평상시 관리수위를 유지하기 위해 수문을 제어하는 경우, 내부개발이후가 방조제 완공직후에 비해 수문 인근영역에서 유속, 수위 등에 동적응답이 즉각적으로 보다 크게 일어나고, 외해수를 호 내측으로 받아들이면 불규칙 수면교란이 일시적으로 발생하는데 내부개발 전후에 따라 최대 10km 및 16km정도까지 상류방향으로 전파된다.