• Title/Summary/Keyword: reservoir capacity

Search Result 314, Processing Time 0.026 seconds

The Research of Storage Capacity & Sedimentation of Reservoirs in HONAM Province (호남지방에 저수지의 매몰상황과 저수량에 관한 조사연구(농학계))

  • 이창구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.13 no.2
    • /
    • pp.2262-2275
    • /
    • 1971
  • Fourteenes rervoirs maintained by the local land improvement associations in the province of Chullabuk-Do and 20 reservoir maintained by thos in the province of Chullanam-Do, were surveyed in connection with a correction between storage capacity and sediment deposit. In addition to this survey, 3,347 of small reservoir, that lie scattered around in the above-mentioned two provinces were investigated by using existing two provinces were investigated by using existing records pertaining to storage capacity in the office of City and country, respectively. According to this investigation the following comclusions are derived. 1. A sediment deposition rate is high, being about $10.63m^3/ha$ of drainage area, and resulting in the average decreasc of storage capaity by 27.5%. This high rate of deposition coule be mainly attributed to the serve denudation of forests due to disorderly cuttings of trees. Easpecially, in small reservoir, an original average design storage depth of 197mm in irrigation water depth is decreased to about 140mm. 2. An average unit storage depth of 325.6mm as the time of initial construction is decreased to 226mm at present. This phenomena causes a greater shortage irrigation water, since it was assumed that original storage quantity was already in short. 3. Generally speaking, seepage rates through dam abutment intakepipe, etc, are high due to insufficient maintenance and management of reservoir. 4. It is recommended that sediment deposit should be dredged when a reservoir is dry in drought. 5. Farmers usually waste excessive irrigation water. 6. Water saving methods should be practiced by applying only necessary water for growing stage of rice. 7. In are as where water defficiency for irrigation is severe, a soil moisture content should be kept at about 70% by applying water once in several days. 8. Tube wells should be provided so as to exploit ground water and subsurface current below stream bed as much as possible. 9. If an intake weir was constructed, a water collection well should be built for the use in drought. 10. Water conservation should be forced by converting devastated forests contained in the drainage area of reservoir to protected forests so as to take priority of yrefor estation, gully control, the prohibition of disorderly cutting of trees, etc. 11. Collective rice nurseries should be adopted, and it should be recommended that irrigation water for rice nurseries is supplied by farmer themselves. 12. Sediment desposit in reservoir should be thoroughly dreged so as to secure a original design storage capacity. 13. The structure of overflow weir should be automatic so as to freely control flood level and not to increase dam height.

  • PDF

Application of Three-Dimensional Model to Evaluate Stream Discharge Capacity due to Vegetation (식생분포에 따른 하도의 통수능 검토를 위한 3차원 모형의 적용)

  • Noh, Joon Woo;Lee, Jin Young;Ahn, Ki Hong
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.37-48
    • /
    • 2011
  • Recently, the social and environmental functions of nature river are important due to the increase of expectation for river restoration. So it should be considered the effect of vegetation affecting the conveyance capacity and hydraulic resistance. However, it has not yet proposed a objective standard and modeling method to estimate the effect of conveyance capacity according to vegetaion distribution in the watercourse such as water level or velocity. Therefore, this study simulates the variations of water level and velocity using 3-dimensional hydrodynamic model, EFDC, to consider a conveyance capacity in downstream of the Soyang Reservoir. The simulation results were validated using statistical index such as F-test and T-test. As results, the water level rises about 0.01 to 0.47m and velocity difference are about -0.95m/s to 0.23m/s.

Evaluation of hydropower dam water supply capacity (I): individual and integrated operation of hydropower dams in Bukhan river (발전용댐 이수능력 평가 연구(I): 북한강수계 개별 댐 및 댐군 용수공급능력 분석)

  • Jeong, Gimoon;Choi, Jeongwook;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.505-513
    • /
    • 2022
  • Recently, uncertainty in predicting available water resources is gradually increasing due to climate change and extreme weather conditions. Social interest in water management such as flood and drought prevention is also increasing, and after the unification of water management implemented in 2018, domestic water management is facing a major turning point. As part of such strengthening of water management capabilities, various studies are being conducted to utilize a hydropower dam for flood control and water supply purposes, which was mainly operated for hydroelectric power generation. However, since the dam evaluation methods developed based on a multi-purpose dam are being applied to hydropower dams, an additional evaluation approach that can consider the characteristics of hydropower dams is required. In this study, a new water supply capacity evaluation method is presented in consideration of the operational characteristics of hydropower dams in terms of water supply, and a connected reservoir simulation method is proposed to evaluate the comprehensive water supply capacity of a dam group operating in a river basin. The presented method was applied to the hydropower dams located in the Bukhan River basin, and the results of the water supply yield of individual dams and multi-reservoir systems were compared and analyzed. In the future, the role of hydropower dams for water supply during drought is expected to become more important, and this study can be used for sustainable domestic water management research using hydropower dams.

Estimating generation capacity of geothermal power generation pilot plant project (우리나라 지열발전 pilot plant 프로젝트의 발전량 추정)

  • Song, Yoonho;Lee, Tae Jong;Yoon, Woon Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.197.1-197.1
    • /
    • 2011
  • Target generation capacity of geothermal power generation pilot plant project through the Enhanced Geothermal Systems (EGS) with a doublet system down to 5 km depth was estimated. Production and re-injection temperatures of geothermal fluid were assumed $160^{\circ}C$ and $60^{\circ}C$, respectively, based on reservoir temperature of $180^{\circ}C$ calculated from the geothermal gradient of $33^{\circ}C$ in Pohang area. In this temperature range, 0.11 of thermal efficiency of the binary generation cycle is a practical choice. Assuming flow rates of 40 kg/sec, which is possible in current EGS technology, gross power generation capacity is estimated to reach 1.848 MW. Net generation considering auxiliary power including pumping power for geothermal fluid and condensing (cooling) energy of working fluid can be 1.5 MW.

  • PDF

A Study on Analysis of Reserves and Available Capacity of Unutilized Energy in Rural Community (농어촌지역 미활용에너지의 부존량과 이용 가능량 분석)

  • Park, Mi-Lan;Ryoo, Yeon-Su;Kim, Jin-Wook;Lee, Yong-Uk;Bae, Sung-Don;Chae, Kap-Byung
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.6
    • /
    • pp.19-25
    • /
    • 2014
  • Alternative sources of energy take a higher interest in order to reduce the greenhouse gas under the Climate Change Convention, fossil fuel consumption, and lower social anxiety about nuclear power such as crisis involving the Fukushima plant, problem of obsolete equipment. The energy consumption of agriculture, forestry and fisheries in South Korea is 3,082,000toe by 2011, reliance on electrical energy(35%) and oil(57.2%) is very high with 92.2%. In this study, we examined reserves and available capacity of temperature difference energy for thermal discharge from plant, treated sewage, river water, dam, and agricultural reservoir in rural community. Reserves of unutilized energy are 455,735Tcal/yr in rural community, these accounts for 78% of total reserves 582,385Tcal/y. Thermal discharge from plant has the most reserves of unutilized energy in rural community, it is estimated that it has the reserves of 277,410Tcal/y. Available capacity of unutilized energy in rural community is total 134,147Tcal/y, thermal discharge from plant available for heating is the most 128,035Tcal/y, and it shows in the order of treated sewage 4,318Tcal/y, river water 1,653Tcal/y, and reservoir 141Tcal/y. Elevating temperature area of green house by 2012 is 21,208ha. The amount of energy required for heating the greenhouse a year is dbout 11,365Tcal/y with 8.5% of the total available capacity of unutilized energy.

A study on the measures to use Gunnam flood control reservoir through a reservoir simulation model (저수지 모의 모형을 통한 군남홍수조절지의 활용방안에 관한 연구)

  • Yang, Wonseok;Ahn, Jaehwang;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.6
    • /
    • pp.407-418
    • /
    • 2017
  • Due to geographical features of being close to DPRK (Democratic People's Republic of Korea), the Imjin River basin has difficulties in hydrological observation, and is vulnerable to unexpected flood occurrence. As a countermeasure, Gunnam Flood Control Reservoir construction was planned in 2005. Despite such a structural measure, damages by DPRK's illegal release continues to occur. Futhermore the Imjin River's flow has been decreased due to the effect of continuous drought in the Korean Peninsula since 2012 and DPRK's unilateral storage of water. A new operation method is derived for the Gunnam Flood Control Reservoir in order to cope with drought damages on the Imjin River basin and to ensure efficient response time upon flooding. The operation method maintaining Gunnam Flood Control Reservoir's water level by raising from EL.23.0 m to EL.31.0 m during the flood season for securing reservoir capacity enables to secure additional $14,000,000m^3$ water compared to the existing operation methods. The operation method to store inflow by controlling release to $250m^3/s$ in the early stage of flood has increased 2.66% on average in terms of detention effect of reservoir compared to the existing operation methods. The method enables to secure 19 hours to prepare flood compared to the existing methods.

Planning of Extuary Reservoirs for the Development of Water Resources -A Comparative Study of Representation Cases of Korea and Japan- (유역이수의 고도화에 대응하는 하구담수호의 계획론 -한국.일본의 대표적 사례의 비교연구-)

  • 이희영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.1
    • /
    • pp.44-52
    • /
    • 1982
  • Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.

  • PDF

Development of Multi-Reservoir System Operation Rule Curves for Hydropower Maximization in the Nam Ngum River Basin of Lao PDR (라오스 남능강 유역 다중 저수지 시스템의 최적 수력발전 운영규정 곡선 개발)

  • Lee, Hyun-Jae;Jang, Woong-Chul;Lee, Il-Ju;Lee, Jin-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.803-814
    • /
    • 2022
  • The Lao government is continuously developing hydro-power dams in addition to the existing eight power plants in the Nam Ngum River basin and is expanding the power capacity of the existing power plants to meet the expected increase in electricity demand. Accordingly, the Lao government has requested an update on the existing reservoir operating rule curve in order to run the power plants efficiently. To this end, this study reviewed the current independent operating system as well as the joint operating system in order to maximize the annual power generation produced by a power plant by using CSUDP, general-purpose dynamic programming (DP) software. The appropriate operating regulation curve forms (URC/LRC, MRC) were extracted from the DP results, and the annual power generations were simulated by inputting them as the basic operating data of the reservoir operation set of the HEC-ResSim program. By synthesizing the amount of the annual power generation simulated, the existing operation regulation curve, the operational performance, and the opinion of the field operator, the optimal reservoir operation regulation curves that maximize the annual power generation of the target power plant were developed. Results revealed that a system operating in conjunction with the reservoir produces about 2.5 % more power generation than an independent reservoir due to the synergistic effect of the connection.

A Study on the Application of Total Pollution Load Management System for Water Quality Improvement in Agriculture Reservoir (농업용 호소의 수질개선을 위한 오염총량관리제의 적용에 관한 연구)

  • Oh, Dae-Min;Lee, Young-Shin
    • Journal of Environmental Health Sciences
    • /
    • v.35 no.5
    • /
    • pp.365-375
    • /
    • 2009
  • Agriculture reservoirs need a systematic approach that can control water purity and water improvement. The area under study, Bunam Lake exceeds the agricultural water standard level due to contamination from the upper stream. When the Taean Enterprise City was planned, the water quality improvement plan was applied to minimize the environmental change. However, in order to continuously maintain the water quality in the Bunam Lake, it was essential to apply the Total Pollution Load Management System (TPLMs). In order to achieve the targeted water quality in the Bunam Lake, standard flow rates and targeted water quality levels were applied to obtain the loading capacity which is as follows : BOD 1,891.2 kg/d, T-N 1,945.7 kg/d, T-P 131.7 kg/d. Also, the regional development load was calculated as, BOD 1,083.6 kg/d, T-N 942.2 kg/d, T-P 61.8 kg/d, which is required to be deceased :- by BOD 378.4 kg/d, T-N 198.9 kg/d, T-P 31.6 kg/d in order to safely achieve the targeted water quality in the Bunam Lake.

Evaluation of Mitigation Effect of Upo-Swamp on the Air temperature Variation with Nighttime Cooling Rate (야간 냉각율을 이용한 우포늪의 기온변화 완화효과 평가)

  • Park, Myung-Hee;Kim, Hae-Dong
    • Journal of Environmental Science International
    • /
    • v.20 no.3
    • /
    • pp.309-319
    • /
    • 2011
  • In this study, we investigated the effects of Upo-swamp upon local thermal environment with nighttime cooling rate. To do this, we set up the AWS(Automatic Weather observation System) over the central part of Upo-swamp on the early October 2007. We conducted the study by comparing the AWS data with another weather data observed by several meteorological observations of the Korea Meteorological Administration located at the vicinity of Upo-swamp for one year. The air temperature of Upo-swamp was higher than that of the surrounding in cold-climate season. But it was opposite in warm-climate season. We confirmed that Upo-swamp roles to mitigate the daily and annual air temperature ranges. And the daily air temperature variation of Upo-swamp lagged behind the land one. This phenomenon represent that the heat reservoir capacity of Upo-swamp is much larger than that of the ground.