• Title/Summary/Keyword: replacement rate

Search Result 1,131, Processing Time 0.03 seconds

The Properties of Early Strength of Concrete Containing Slag and Fly-ash for In-situ Application (현장 적용을 위한 3성분계 콘크리트의 조기강도 특성)

  • Jung Chul-Hee;Kim Kyoung-Min;Lee Jin-Woo;Bae Yeon Ki;Lee Jae-Sam
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05b
    • /
    • pp.497-500
    • /
    • 2005
  • This study was performed to evaluate the characteristics which are slump, air content and time of set in fresh concrete and compressive strength of hardened concrete containing slag powder and fly-ash. Replacement rate of FA is fixed on 10$\%$ and replacement rate of slag powder are 0$\%$, 20$\%$ and 30$\%$. Also AE water-reducing agents(standard type, accelerating type) are used. The results were as follows. (1)Slump flow of concrete using AE water-reducing agents is similar. Flowability is incresed when replacement rate of slag powder is increased due to slag powder's ball bearing reaction.(2)Time of set of concrete using accelerating type agent is more faster than that of concrete using standard type agent because of ettringite generation that promote setting.(3)Early strength of three-component concrete using accelerating type agent is higher than that using standard type agent. Therefore cumulative pore is reduced due to ettringite

  • PDF

Preventive maintenance model following the expiration of NFRRW (비재생무료교체-수리보증이 종료된 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.22 no.4
    • /
    • pp.775-784
    • /
    • 2011
  • In this paper, we consider the periodic preventive maintenance model for repairable system following the expiration of non-renewing free replacement-repair warranty (NFRRW). Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Cardiac Valve Replacement and Anticoagulation (심장판막치환환자와 항응혈치료)

  • 김종환
    • Journal of Chest Surgery
    • /
    • v.11 no.3
    • /
    • pp.303-315
    • /
    • 1978
  • During the full 10-year period from June 1968 through June 1978, 112 consecutive patients underwent isolated or double valve replacement. A total of 130 valves were used in aortic, mitral or tricuspid positions: 63 prosthetic valves in 56 and 67 glutaraldehyde-preserved porcine aortic valves in 56 patients. There were 31 early and 9 late deaths with a cumulative mortality rate of 35.7 percent. Eighty-five patients survived longer than 10 days postoperatively were studied for the occurrence of thromboembolism and complications related to anticoagulant therapy. At the end of follow-up period, 68 patients were on Coumadin; 74 were on Persantin with or without Coumadin; 11 were off any antithrombotic drugs with 6 of them being off electively after 6 months of tissue valve replacement. Thromboembolism occurred in 7 [8.2%] of 85 patients or 10.9%/patient-year. Embolic rates were as follows: one of 18 patients anticoagulated [5.6%] or 6.1%/patient-year and 4 of 16 patients not anticoagulated [25.0%] or 17.8%/patient-year for the prosthetic valve replacement; and one of 40 patients anticoagulated [2.5%] or 7.9%/patient-year and one of 11 patients not anticoagulated [9.1%] or 7.9%/patient-year for tissue valve replacement. Three complications of major bleeding were experienced by 3 patients during the follow-up period, being related to Coumadin therapy. The importance of proper anticoagulation were stressed for the successful management of patients after cardiac valve replacement, both prosthetic and tissue valves.

  • PDF

A Study on the Estimation of the Optimum Lifetime of Elevator Components for Elevator Accident Prevention (엘리베이터 사고예방을 위한 승강기 부품의 최적 수명 추정에 관한 연구)

  • Kim, Han-jin;Hwang, Min-soo;Choi, Og-man;Lee, An-ki;Kim, Jae-chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1278-1284
    • /
    • 2017
  • As of December 2016, there are 608,828 elevators in operation in Korea and 179,790 elevators in more than 15 years. 30.4% of all elevator are aging. Improved maintenance of the elevator and proactive replacement of the parts of the elevator can extend the lifetime of the elevator and ensure safety. An unclean environment reduces the lifetime of elevator parts. If you do not clean the environment and prevent preventive parts replacement, eventually shortening the lifetime of the parts connected to the failed part or causing more damage will result in greater economic loss. Also, the risk of elevator safety accidents due to failures of elevator parts will be increased accordingly. The study of optimum replacement time of elevator parts will contribute to prevention of safety accident of elevator and prolongation of lifetime of elevator through preventive replacement of elevator parts.

Optimal Spare Provisioning for Group Replacement Policy (경제적인 그룹교체보전을 위한 최적 예비품 재고수준의 결정)

  • Yoo, Young Kwan;Park, Roh Gook
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.9 no.2
    • /
    • pp.81-86
    • /
    • 2014
  • In this paper, a jointly optimal group replacement and spare provisioning policy is presented. Most maintenance policies assume that the spare inventory is always available, but in practice the maintenance schedule is affected by the availability of spare inventory. We present a maintenance-inventory model which jointly optimizes the group replacement interval and spare ordering quantity. Group replacement policy is used when a group of units are put in operation simultaneously. The operating fleet is replaced altogether at a predetermined number of units are failed. A sufficient level of spare inventory is carried to perform a number of group replacement. A cost rate expression which considers the group maintenance cost and inventory holding cost is derived and a heuristic method for searching the optimum value of decision variables is suggested. Numerical examples demonstrate the analytical results and the performance of the presented model.

  • PDF

Optimal Periodic Replacement Policy Under Discrete Time Frame (이산 시간을 고려한 시스템의 교체와 수리 비용 최적화 연구)

  • Lee, Jinpyo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.1
    • /
    • pp.61-69
    • /
    • 2020
  • Systems such as database and socal network systems have been broadly used, and their unexpected failure, with great losses and sometimes a social confusion, has received attention in recent years. Therefore, it is an important issue to find optimal maintenance plans for such kind of systems from the points of system reliability and maintaining cost. However, it is difficult to maintain a system during its working cycle, since stopping works might incur users some troubles. From the above viewpoint, this paper discusses minimal repair maintenance policy with periodic replacement, while considering the random working cycles. The random working cycle and periodic replacement policies with minimal repair has been discussed in traditional literatures by usually analyzing cases for the nonstopping works. However, maintenance can be more conveniently done at discrete time and even during the working cycle in real applications. So, we propose that periodic replacement is planned at discrete times while considering the random working cycle, and moreover provide a model in which system, with a minimal repair at failures between replacements, is replaced at the minimum of discrete times KT and random cycles Y. The average cost rate model is used to determine the optimal number of periodic replacement.

Effects of the Mitral Valve Replacement with Preservation of Posterior Mitral Leaflet and Chorda Tendinae for Mitral Valvular Disease (승모판막질환에서 승모판 대치술시 승모판 후엽 및 건삭 보존의 효과)

  • Jo, Gang-Rae;Kim, Jong-Won
    • Journal of Chest Surgery
    • /
    • v.23 no.3
    • /
    • pp.488-500
    • /
    • 1990
  • Author compared the effect of surgical methods between 40 patients who received mitral valve replacement with complete excision of the mitral valve[resected group] and 41 patients who received mitral valve replacement with preservation of posterior chorda tendineae and posterior mitral leaflet[preserved group] from 1985. 2. to 1989. 4. at cardiothoracic department of Pusan National University Hospital.v 1. There was no significant difference between the preserved group and resected group in cardiopulmonary bypass time and aortic cross clamping time and NYHA classification. 2. In preserved group of Mitral stenosis and Mitral regurgitation, the left ventricular functions were much improved after mitral valve replacement than resected group, but there was not so difference between the preserved group and reserved group in Mitral steno-regurgitation. 3. There were remarkable decrease in complication rate in preserved group compared to resected group. And also the death rates were remarkably decreased in preserved group which was 4.9% compared to resected group which was 17.5%. As the preservation of the posterior mitral leaflet and chorda tendineae during mitral valve replacement in mitral valve disease showed significantly improved effects in the maintaining of left ventricular function and reducing the postoperative complication, I assume the preservation of posterior mitral leaflet and chordae during mitral valve replacement will bring better result.

  • PDF

Clinical Experience of Open Heart Surgery A Report of Annual 108 Cases (1984 년도 연간 개심술 108례 보고)

  • 박병순
    • Journal of Chest Surgery
    • /
    • v.18 no.3
    • /
    • pp.383-390
    • /
    • 1985
  • 108 cases of open heart surgery were done at our department in 1984. There were 58 male and 50 female patients ranging in age from 20 months to 52 years. 75 cases were congenital heart disease, and 33 cases were acquired heart disease. There were 75 congenital heart anomalies with 5 operative deaths [6.7%], consisting of 62 acyanotic cases with 2 deaths [3.2%] and 13 cases of cyanotic cases with 3 deaths [23.1]. In 33 patients of acquired valvular disease, 29 valves were implanted; 20 mitral valve replacement with 2 death [10%], 2 aortic valve replacement with 1 death [50%], 2 double valve replacement [MVR+AVR] and 2 open mitral commissurotomy plus aortic valve replacement with no death. Postoperative, Warfarin sodium was medicated with checking prothrombin time. Finally, the operative mortality was 9.2% in congenital anomaly, and 9.1% in acquired heart disease, overall mortality rate was 9.3%.

  • PDF

Long Term Forecastig for Durable Goods by Cross Country Analysis Using Growth Curve (성장곡선을 이용한 횡단면 분석에 의한 내구재의 장기유요예측모형)

  • 정규석
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.10 no.1
    • /
    • pp.65-78
    • /
    • 1985
  • In this paper, the approach getting a total demand by forecasting the new demand and the replacement demand separately and adding them is used for long term forecasting of durable goods. Cross country analysis using the income as an independent variable and S-shaped growth curve as a fitting model is developed as a method of forecasting new demand. To get the replacement demand the methods using the number of ownership and the replacement rate and the methods using the past demand and the distribution of the product life are proposed. And the theoretical explannation for product life cycle's diversity, which is the one of the major considerations in the long term forecasting, is attempted by the combination of the new demand and the replacement demand patterns. This is applicated the long term forecasting of Korean passenger cars.

  • PDF

Cost Analysis of Manufacturer Under the Free Replacement, Pro-rata, Hybrid and Stepdown Warranty Policy (단계별 사후보증제도와 무료, 비율, 혼합형 보증제도에서 제조업자 입장의 비용분석)

  • 김원중;김재중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.12 no.20
    • /
    • pp.39-45
    • /
    • 1989
  • This article is concerned with cost analysis in product warranty policy. The warranty cost can be different according to warranty rate and warranty renewal policy. In this paper the stepdown warranty is used. The warranty renewal policy is considered when the warranty is received upon free replacement period as item failing. Assuming the non repairable item as one item is sold, investigated manufacturer's cost in stepdown warranty policy. Also manufacturer's cost is calculated in the free replacement. pro-rata. hybrid policy. Numerical example is given over Weibull time to failure distribution, comparing stepdown warranty policy with free replacement, pro-rata, hybrid one in the manufacturer's point of view. The sensitivity analysis of warranty cost according to the number of warranty period step is included.

  • PDF