• 제목/요약/키워드: repair scope

검색결과 57건 처리시간 0.029초

Analysis of the adhesive damage between composite and metallic adherends: Application to the repair of aircraft structures

  • Ibrahim, Nour Chafak;Bouanani, Morad Fari;Bouiadjra, Bel Abbes Bachir;Serier, Boualem
    • Advances in materials Research
    • /
    • 제5권1호
    • /
    • pp.11-20
    • /
    • 2016
  • In bonded composite repair of aircraft structures, the damage of the adhesive can thus reduce significantly the efficiency and the durability of the bonded composite repair. The adhesive damage models using critical zone have proven their effectiveness due to simplicity and ap-plicability of the damage criteria in these models. The scope of this study is to analyze the effects of the patch thickness and the adhesive thickness on the damage damage in bonded composite repair of aircraft structures by using modified damage zone theory. The obtained results show that, when the thickness of adhesive increases the damage zone increases and the adhesive loses its rigidity, inversely when the patch is reduced the adhesive damage be-comes more significant.

공종별 수선비용 추계모델을 활용한 공동주택 장기수선충당금 적립금액 산정 (Repair Accumulation Cost for the Long-Term Repair Plan in Multifamily Housing Using the Forecasting Model of the Repair Cost)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제16권3호
    • /
    • pp.137-143
    • /
    • 2016
  • Purpose: Apartment housing should conduct a cyclic repair to keep and maintain the building performance since they are constructed. Therefore, the repair plan would be provided for long term period which explains the repair time, items and repair cost. Residents of apartment housing are responsible to pay for the repair activities. For repair cost, residents would reserve the money for repair little by little continuously until the required repair time because the repair cost takes a big burden for residents and lots of money a time. But, there is no systematic approach to provide the long term repair cost because it is no proper forecast of the repair cost to the upcoming repair time. In this study, it aimed at providing the monthly accumulation of the long term repair cost with the survey data in Seoul. Method: For these, the surveyed data are classified into 6 categories and number of data are 1,918. In addition, it developed the repair cost model for the 24 repair works and the cumulation function which is reflected with the each cost model. Result: This study are shown as follows : First, among the various estimation for the repair cost, the power function has a goodness of fit in statistics. Second, the monthly accumulation would be 12,840 won/household in size of $100,000m^2$ management area and $81.7won/m^2$ in size of the 1,000 household number during 40 years.

하수관거 안전성 향상을 위한 보수 시스템 개발 (Development of Repair System for Drain Pipe to Enhance Safety)

  • 정지승;강원대
    • 한국안전학회지
    • /
    • 제26권6호
    • /
    • pp.45-53
    • /
    • 2011
  • This study was performed to develop repair and reinforcing materials in sewage drain pipe by using 40% of CAC(Calcium Aluminate Cement) and 4% of Polymer Powder. Regarding reinforcing materials to enhance load-bearing capacity, polyester textile and wire mesh were adopted and then they were evaluated by the measurement of deflection and Stress-strain Relationship. Two types of drain pipe made by concrete and PE were considered as plain specimens and then loading test were performed after repaired by CAC mortar impregnated reinforcing materials. As the test results of the load-bearing test on both drain pipe, there was higher load-bearing capacity on the specimen adopted wire mesh but debonding of repair mortar was found due to stiffness of wire mesh. By the way, repair system using CAC mortar impregnated polyster textile without wire mesh showed satisfactory results including bonding and load-bearing capacity regardless substrate, so this repair system using by mixture of CAC mortar and polyster textile is suggested as the reasonable repairing method within this experimental scope.

Direction of CM Services Defect Liability in the CM Contract

  • Cho, Young-Jun
    • 한국건축시공학회지
    • /
    • 제13권3호
    • /
    • pp.209-217
    • /
    • 2013
  • The execution of a construction project involves the engagement of many participants. Generally, the Authority uses CM to certify that the Work is built according to the contract documents. The CM work scope is expressed in the Construction Technology Management Act and its Regulation. The mandated and delegated CM services are limited to the construction period. If Contractor is required to repair a construction defect, the Contractor should bear the burden of the inspection service for the defect repair, because it is associated with him. Nevertheless, CM should submit a bond to provide the inspection and supervision service for the defect repair. These may result in conflict with each liability. Therefore, CM service in the law and regulation was investigated and analyzed in this study to classify the characteristics of CM contracts, and it was suggested that the CM liability for the inspection and supervision service for the defect repair should be reconsidered.

공공임대주택 단위 수선비용 특성 분석 (The Characteristics of the Repair Unit Cost in Public Rental Housing)

  • 이강희;채창우
    • KIEAE Journal
    • /
    • 제14권5호
    • /
    • pp.103-109
    • /
    • 2014
  • Apartment housing should require the systematic maintenance to provide the decent living condition during its life. Each household should participate the maintenance activities and pay for the repair. Therefore, the required cost for repair would be needed to plan in the repair schedule because each household could not pay the much repair money at a time. After apartment constructed, a long term repair plan would be prepared in repair time, repair scope and a required cost. A few studies are said that the repair cost depends on the building deterioration, elapsed year and management factors. The above factors are not be certain to affect the repair management while it may be important to prepare the required money and the repair time. In this paper, it aimed at analyzing the correlation between the repair management and the management factors, especially total area, number of household. This would educe the unit cost per number of household and management area in the individual boiler and elevator with full change and full repair. The unit cost per number of household and area for full change are about 199,000 won/household and $1,954won/m^2$ in the individual boiler respectively. The unit cost of the elevator for full change is 94,000 won/household and $5,429won/m^2$ respectively. Second, this study shows that the elapsed year after construction would not be related the repair unit cost.

임대공동주택 구성재의 열화도 패턴에 관한 연구 (A Study on the Deterioration Patterns of Building Components in the Rental Apartment Housing)

  • 이강희
    • 한국주거학회논문집
    • /
    • 제17권4호
    • /
    • pp.65-72
    • /
    • 2006
  • Most of buildings have been deteriorated with time-elapse by reflection of the building location, material, environmental circumstances and so on. The performance would go down and be demolished if anything could not be done after constructed. The maintenance should be required to preserve a decent living condition or improve a inferior condition by various plans and practices. The maintenance plan needs various data such as a repair scope, a repair time, a forecasted cost, a plan of management and so forth. Among the above required data for planning the maintenance, the deterioration characteristics of the building components would be first analyzed. The deterioration pattern would be a key role to affect and make a maintenance plan. In this paper, it aimed at classifying the deterioration patterns of building components. A deterioration pattern would be analyzed between the cumulative repair cost and time-elapse and modeled with these relations. A deterioration patterns are classified into 4 types-a accelerated type, a straight type, a temporary type and a slowly type. As a result of this research, a accelerated type includes window, window frame, general paintings, general water proofing in building components. A straight type includes the lacquer paintings, furnishings in building components and water supply pipe, boiler, sanitaries in mechanical facilities and lighting in electric facilities. Based on these research results, further study should be conducted to include any other components and an estimating model.

공동주택 구성재의 내용년수 산정방법에 관한 연구 (A Study on the Service life of the Building Components in the Apartment Housing)

  • 이강희;장정희;채창우
    • 한국주거학회논문집
    • /
    • 제16권5호
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

지식베이스를 이용한 천정크레인의 전기고장 진단 및 처방 시스템 개발 (The Development of the Knowldege-Based Electric Fault Diagnosis and Maintenance System for Overhead Cranes)

  • 최승영;김선호
    • 대한산업공학회지
    • /
    • 제20권1호
    • /
    • pp.71-85
    • /
    • 1994
  • Overhead cranes which carry heavy items in construction or production areas consist of structure and electric modules. More than 80% of breakdowns bring out of the electric module. As operators do not know all about cranes, it sometimes takes much time to repair the cranes. In order to resolve this problem, the expert system which can diagnose causes of faults and give instructions for repair to operators, has been developed. The scope of the paper is limited to the electric module. First of all, analyzing symptoms and causes, we have developed a rule base with the expert system shell, EXSYS. Furthermore, for the facility maintenance including repair instructions against the causes, the instruction data base was developed with FOXPRO. On the other hand, for the help of user's understanding the fault causes, the graphic animation module which shows malfunctioning component ports or motions in 3D was developed with the graphic software, TOPAS VGA.

  • PDF

공공임대주택 유형별 부재의 사후보전 수선시기 설정연구 (Analysis of the Breakdown repair time of the Building Components in Public Rental-Housing Types)

  • 이강희;안용한;채창우
    • KIEAE Journal
    • /
    • 제13권6호
    • /
    • pp.129-136
    • /
    • 2013
  • The rental housing has played a key role to supply a decent living space for the low-income households. The owner of the rental housing should maintain and manage the building physical condition. On the other hand, rents should use the housing without any damage and pay a certain fare for the rent. A rent is classified into two types : private and public. The public rent is mainly to supply a living space for non-available home owner with a low-rent fare. Many of public rent are built and supplied by the public institution or local government. The supplier would take a responsibility to maintain the building and components, reflected by the maintenance plan and repair scope. In this paper, it aimed at providing the repair time in building components of the public rental housing such as lighting, electrical cable, paintings and etc.. The repair time is analyzed with three calculation methods which are solved by the probability and empirical approach. Results are as follows : First, the repair time of the electrical facilities are maintained with 11yr, 10yr and 7 in permanent, public and redevelopment rent respectively. The roof proof has a repair time with 14yr, 11yr and 8 in permanent, public and redevelopment rent housing respectively. Second, Most of the components has a prior length of the repair time in permanent, public and redevelopment rent sequently. There is a difference in repair time according to the rental types. Therefore, it would continue to research the difference in aspect of the living style, building physics, living consciousness and etc.

Methyl Methacrylate(MMA)계 도로보수재의 기초 물성 평가 (Evaluation of Basic Properties of Methyl Methacrylate (MMA) as a Road Repair Material)

  • 최병철;김규용;편수정;지성준;유하민;남정수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.109-110
    • /
    • 2023
  • Domestic ultra-hard road repair materials require a lot of time before the road can be opened to traffic. Therefore, in this study, Methyl Methacrylate (MMA) based road repair material was used to improve the above problems. Furthermore, the basic physical properties of MMA-based pavement repair materials are examined to confirm their suitability in concrete pavements. For this study, two types of MMA road repair materials (A type and B type) were selected. Then, the curing of the test specimens prepared for painting was carried out under three conditions. The experimental items were viscosity (drop time) and drying time (set to touch, dry-hard). As a result of the experiment, viscosity (drop time) was faster in type A than in type B. The drying time results were as follows. In the case of set ti touch, both type A and type B dried in about 10 minutes regardless of the curing conditions. In the case of dry-hard, regardless of the curing conditions, A type dried longer than B type, but it dried faster than conventional road repair materials. Therefore, within the scope of this study, it is considered that A type has a high potential for utilization as a road repair material.

  • PDF