• Title/Summary/Keyword: remaining service life

Search Result 96, Processing Time 0.025 seconds

Prediction Model of Remaining Service Life of Concrete for Irrigation Structures by Measuring Carbonation (중성화 측정을 통한 콘크리트의 잔존수명 예측 모델)

  • Lee, Joon-Gu;Park, Kwang-Soo;Kim, Han-Joung;Lee, Joung-Jae
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.4
    • /
    • pp.529-540
    • /
    • 2003
  • Recently, the researches on the durability design of concrete structures have been studied. As the examples, models to evaluate the service life prediction of the structure have been developed. The purpose of this article is to develop the model for predicting remaining service life. The final aim is to provide the user time for repairing the concrete structures. In addition, it makes possible to maintain the concrete structure economically. 70 reservoirs out of the inland concrete structures were selected and concrete structures of their components were surveyed. Two methods were used for measuring carbonation; TG/DTA method and Phenolphtalein indicator and, the value of pH was measured by the pH meter, After deriving correlations of calcium carbonate and used year, duration from completion year to 2002, pH value, and concrete cover depth the model was developed for predicting remaining service life by measuring data as small as possible. The conventional models had been developed on the basis of experiment data obtained from the restricted lab environment like as carbon gas exposure. On the other hand this model was developed on the basis of measuring data obtained from the real field that the complex deterioration actions are occurred such as freezing and thawing, carbonation, steel corrosion, and so on. The reliability of the developed model will be evaluated high in this point and this model can help to maintain concrete structures economically by providing the manager time to repair the deteriorated concrete structures in site of facility management.

Development of Expert System for Fatigue Assessment of Slab Bridge (슬래브교의 피로도 평가 전문가 시스템)

  • 오병환;김세훈;박종범;김지상
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.396-401
    • /
    • 2003
  • For a realistic and reasonable determination of condition and status, assessment system should include load modeling for the loads acting on slab bridges due to traffic loads, evaluation system for fatigue, and determination of remaining service life. The purpose of the present study is to develop a realistic expert system which can estimate reasonably the fatigue and service life of slab bridges, based on the load models that are derived from the traffic loads.

  • PDF

Preliminary Evaluation of Subsurface Cavity and Road Cave-in Potentials Based on FWD Deflections (FWD 처짐량 기반 도로 공동 및 함몰 위험도 평가 기초 연구)

  • Kim, Tae-Woo;Yoon, Jin-Sung;Lee, Chang Min;Baek, Jongeun;Choi, Yeon-Woo
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.59-68
    • /
    • 2017
  • PURPOSES : The objective of this study is to evaluate the potential risk level of road cave-ins due to subsurface cavities based on the deflection basin measured with falling weight deflectometer (FWD) tests. METHODS: Ground penetrating radar (GPR) tests were conducted to detect road cavities. Then FWD tests were conducted on 13 pavement test sections with and without a cavity. FWD deflections and a deflection ratio was used to evaluate the effect of geometry of the cavity and pavement for road cave-in potentials. RESULTS : FWD deflection of cavity sections measured at 60 cm or a closer offset distance to a loading center were 50% greater than more robust sections. The average deflection ratio of the cavity sections to robust sections were 1.78 for high risk level cavities, 1.51 for medium risk level cavities, and 1.16 for low risk level cavities. The relative remaining service life of pavement with a cavity evaluated with an surface curvature index (SCI) was 8.1% for the high level, 21.8% for the medium level, and 89.8% compared to pavement without a cavity. CONCLUSIONS : FWD tests can be applied to detect a subsurface cavity by comparing FWD deflections with and without a cavity measured at 60 cm or a closer offset distance to loading center. In addition, the relative remaining service life of cavity sections based on the SCI can used to evaluate road cave-in potentials.

Remaining Service Life Estimation Model for Reinforced Concrete Structures Considering Effects of Differential Settlements (부등침하의 영향이 반영된 철근콘크리트 구조물 잔존수명 평가모델)

  • Lee, Sang-Hoon;Han, Sun-Jin;Cho, Hae-Chang;Lee, Yoon Jung;Kim, Kang Su
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.1
    • /
    • pp.133-141
    • /
    • 2020
  • Korea Infrastructure Safety and Technology Corporation (KISTEC) specifies that the safety inspection and precise safety diagnosis of concrete structures shall be conducted in accordance with the 'Special Law on Safety Management of Infrastructure'. The detailed safety inspection and precise safety diagnosis guidelines presented by KISTEC, however, gives only the grade of members and structures, and thus it is impossible to quantify remaining service life (RSL) of the structures and to quantitatively reflect the effect of differential settlements on the RSL. Therefore, this study aims to develop a RSL evaluation model considering the differential settlements. To this end, a simple equation was proposed based on the correlations between differential settlements and angular distortion, by which the angular distortion of structures was then reflected in nominal strengths of structural members. In addition, the effects of the differential settlements on the RSL of structures were analyzed in detail by using the safety diagnosis results of actual concrete structure.

Development of Probabilistic Prediction System for Remaining Life of Reinforced Concrete Bridge Decks (도로교 콘크리트 바닥판의 합리적인 수명 평가 및 예측시스템 개발)

  • 오병환;최영철;이준혁
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.10a
    • /
    • pp.637-640
    • /
    • 2002
  • The deterioration of RC deck slabs has been a serious problem and high portion of budget has been a spent for repair and strengthening of deck slab. The concrete deck slabs are subject to direct application of vehicle loading and accumulation of fatigue damage. Besides, various environmental causes. In this paper, an probabilistic study is carried out to predict exact load effects and structural capacity of deck slab during its service life, and estimate an appropriate remaining life of deck slab. To achieve this purpose the live load model is developed using by influence line including deterioration of deck slab, and deterioration model of bridge deck slab is developed. In addition, the fatigue life of reinforced concrete deck slabs considering corrosion of reinforcement are estimated based on experimental formula. This study will help rational decisions for the management and repair of reinforced concrete deck slabs.

  • PDF

Development of exchange period program for chemical cartridge feasible in the work spot (1) - Experiment of estimated breakthrough time using discarded cartridges (작업장에서 사용 가능한 방독마스크 정화통 교체주기 프로그램의 개발(I) - 폐정화통을 이용한 파과시간 예측 실험)

  • Han, Don-Hee;Lee, Sang-Young
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.18 no.3
    • /
    • pp.204-215
    • /
    • 2008
  • Many researches for service-life of chemical cartridges of respirators have been performed in many countries. On the result of these researches a few softwares programs were eventually developed to be used. In spite of that, it is difficult to apply these researches and softwares practically in the work spot because of too many factors that influence on service-life of chemical cartridges. This study was the first of two conducted for the purpose of developing program for estimating exchange period or service-life of chemical cartridges available feasibly in the workplaces. Collecting plan of cartridges discarded after use is in principle that three cartridges from three workers at a time, three steps of 1/2 exchange time due to smelling, just routine exchange time and 1.2 to 1.3 expanded time of routine exchange, total nine cartridges are collected in the same job site. 33 cartridges for organic vapor were collected in paint spray process of ship yard and paint factory, and 6 cartridges for acid were collected in plating process. These cartridges were analysed the remaining breakthrough time in 3M Innovation Center. Challenge vapor and breakthrough concentration were complied with Korean regulation for chemical cartridge respirators. Estimated breakthrough time was determined from previously used time plus breakthrough time for the remaining. Exchange period of cartridge would be the shortest time among three estimated breakthrough times. On the result breakthrough time for organic vapor was found to be relatively easily estimated, but that for acid aerosol or vapor was difficult to be confident. Even though this method was difficult to be precisely predicted exchange period of cartridge, it could be an alternative program practically available in the job site.

Development of On-line Life Monitoring System Software for High-temperature Components of Power Boilers (보일러 고온요소의 수명 감시시스템 소프트웨어 개발)

  • 윤필기;정동관;윤기봉
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1999.05a
    • /
    • pp.171-176
    • /
    • 1999
  • Nondestructive inspection and accompanying life analysis based on fracture mechanics were the major conventional methods for evaluating remaining life of critical high temperature components in power plants. By using these conventional methods, it has been difficult to perform in-service inspection for life prediction. Also, quantitative damage evaluation due to unexpected abrupt changes in operating temperature was almost impossible. Thus, many efforts have been made for evaluating remaining life during operation of the plants and predicting real-time life usage values based on the shape of structures, operating history, and material properties. In this study, a core software for on-line life monitoring system which carries out real-time life evaluation of a critical component in power boiler(high temperature steam headers) is developed. The software is capable of evaluating creep and fatigue life usage from the real-time stress data calculated by using temperature/stress transfer Green functions derived for the specific headers and by counting transient cycles. The major benefits of the developed software lie in determining future operating schedule, inspection interval, and replacement plan by monitoring real-time life usage based on prior operating history.

  • PDF

Development of Small-Specimen Creep Tester for Life Assessment of High Temperature Components of Power Plant (발전소 고온부의 수명 평가를 위한 소형 시편용 크리프 시험기의 개발)

  • Kim, Hyo-Jin;Jeong, Yong-Geun;Park, Jong-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.10 s.181
    • /
    • pp.2597-2602
    • /
    • 2000
  • The most effective means of evaluating remaining life is through the creep testing of samples removed from the component. But sampling of large specimen from in-service component is actually impossible. So, sampling device and small-specimen creep tester have been applied. Sampling device has been devised to extract mechanically small samples by hemispherical, diamond -coated cutter from the surface of turbine rotor bores and thick-walled pipes without subsequent weld repairs requiring post weld heat treatment. A method of manufacturing small creep specimen, 2min gage diameter and 10min gage length, using electron beam welding to attach grip section, has been proven. Small-specimen creep tester has been designed to control atmosphere to prevent stress increment by oxidation during experiment. To determine whether the small specimens successfully reproduce the behavior of large specimens, creep rupture tests for small and large specimens have been performed at identical conditions. Creep rupture times based on small specimens have closely agreed within 5% error compared with that of large specimen. The errors in rupture time have decreased at longer test period. This comparison validates the procedure for fabricating and testing on small specimen. This technique offers potential as an efficient method for remaining life assessment by direct sampling from in -service high temperature components.

음식물쓰레기 감량방안에 관한 연구 (한식메뉴를 중심으로)

  • 정조인
    • Journal of Applied Tourism Food and Beverage Management and Research
    • /
    • v.9
    • /
    • pp.243-271
    • /
    • 1998
  • The changes of life-style by improving the standard of living produce the development of food service industry. But, the consequence is that food waste also increase. I think that the problems about the food waste become more critical. There are some reports about counting the amount of remaining foods until now. But, I can not find reports about the calory analysis of the remaining foods. So, I analysis the amounts and calories of the food and remaining food served at the restaurants for the purpose of groping how to reduce the remaining food and conclude as follows. First, the average amount of the food giving to one person is 1007gm(from 300gm to 1367gm), and the average amount of the remaining food is 126gm(from 29gm to 172gm). Second, the average calory of the food giving to one person is 795.5kcal(from 464kcal to 1225kcal), and the average calory of the remaining food is 140.8kcal(from 29kcal to 289kcal). So, we gain 130kcal more than recommending calory to woman. Therefore, we need to studies of developing menu, controlling the amount of supplied food, and improving how to supply. Also we need to study about the using of food bank and publish and use about recycling of food waste.

  • PDF

The study of retrofit method for the used control system of Power Plants to improve its reliability (발전소 제어설비의 신뢰성 평가를 이용한 최적 개조방안 도출(보령화력 사례))

  • Shin, Yoon-Oh;Jung, Chang-Ki
    • Proceedings of the KIEE Conference
    • /
    • 1999.07b
    • /
    • pp.737-739
    • /
    • 1999
  • All equipment generally has a specified design service life. As an equipment nears the end of its design service life, replacement must be considered. In some cases, it is possible and more economical to continue the usage of the existing equipment for a longer period. So, replacement should be carefully decided considering the feasibility and economic benefits of the existing equipments' life extension. In this paper, assessment procedure for deciding between life extension and replacement of the electronic control system is presented with an application example. In particular estimation of the electronic control system's remaining life is focused on.

  • PDF