The probabilistic production simulation of power system generally has been used to formulate a reasonable power production plan or generation planning. It integrates the convolution process of a generating unit's random outage(FOR) with equivalent load duration curve(ELDC), and provides the reliability indices of power system. This paper presents the reliability characteristics of power system reflected on demand side management and proposes the modified ELDC representation technique due to the high-efficient end-use diffusion among the customers. Load reductions are simulated from the multi-state deconvolution process with the saved capacity of end-use. Case study shows the computed reliability from the power system production simulation incorporated with DSM planning scheme.
Kim, Ki-Youn;Kang, Taesun;Lee, Seung Gil;Park, Hae Dong;Jeong, Jee Yeon
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.27
no.2
/
pp.87-96
/
2017
Objectives: Improvement of the reliability of work environment measurement results is one of the principal subjects to be resolved in the field of industrial hygiene. Thus, this study was conducted in order to review domestic programs for enhancing the reliability of work environment measurement results and propose a more efficient management plan for workplace monitoring. Materials and Methods: The current domestic programs reviewed in this study are the quality control system and evaluation system for industrial hygiene laboratories, the reliability system accompanied by KOSHA (the Korea Occupational Safety and Health Agency), the system of permissible exposure limits and observed inspection system for permissible exposure limits. Their contents and data were analyzed by reviewing articles, reports, and guidelines related to reliability improvement for work environment measurement results. Results: As a result of the literature review, all the domestic programs investigated in this study had both merits and demerits in terms of considering the reliability of work environment measurement results. In particular, the fact that preliminary notification is provided to the head of a workplace before implementation would be an obstacle for elevating the reliability of work environment measurement results. Conclusions: Based on the review results obtained from this study, it is proposed that on-site measurement without preliminary notification should be considered for a more efficient inspection system that would enhance the reliability of workplace monitoring.
In order to improve the reliability of power service and the effective management of distribution power system. DAS (Distribution Automation system) is widely used in KEPCO(Korea Electric Power Corporation) branch offices. Based on the present protective device coordination program which used in KEPCO. this study presents the new concept about both protective device coordination program maximizing the characteristics of DAS and development plan of protective device auto-coordination program with the merits of DAS.
This paper describes a safety program plan of the LRT(Light Rail Transit) project. The SPP is a management document that describes the system safety objectives and how they will achieved so it embodies principles, methods and 1)lattices commonly used in the transit industry. In a Preliminary Hazard Analysis phase, the hazard analysis of collision and derailment is carried out. In this paper we make a definition of hazard that hazard is consist of an inner part(means a reliability) and an outer part(means a fire, flood and earthquake). Also safety principles for infrastructure, stations, electric traction system, railway control of system and train are performed.
To maintain competitiveness in the modern automotive market, it is important to carry out process planning concurrently with new car development processes. Process planners need to make decisions concurrently and collaboratively in order to reduce manufacturing preparation time for developing a new car. Automated generation of a simulation model by using the integrated process plan database can reduce time consumed for carrying out a simulation and allow a consistent model to be used throughout. In this research, we developed a web-based system for concurrent and collaborative process planning and flow analysis for an automotive general assembly using web, database, and simulation technology. A single integrated database is designed to automatically generate simulation models from process plans without having to rework the data. This system enables process planners to evaluate their decisions quickly, considering various factors, and easily share their opinions with others. By using this collaborative system, time and cost put into the assembly process planning can be reduced and the reliability of the process plan would be improved.
This paper presents new practical accelerated life test plans with different censoring times at three levels of stress for Weibull and lognormal lifetime distributions, respectively. The proposed plans are compared with the corresponding two-level statistically optimal plans and three-level compromise and practical plans. Computational results indicate that new practical plans have been more precise and effective than the existing three-level plans under a constraint of total testing time. In addition, a procedure to determine useful ALT plans is illustrated with a numerical example.
One important measure of performance for a repairable system is steady-state availability. In this paper, a method to estimate and establish confidence interval for the steady-state availability under Weibull lifetime and lognormal repair time distributions is proposed. Also, bias and mean squared error of a point estimator for an availability are investigated. In addition, a procedure to derive the sample size and critical value for availability demonstration test is presented and illustrated with a numerical example.
In 2019, the pilot project to establish a record management system for administrative information datasets started in earnest under the leadership of the National Archives. Based on the results of the three-year project by 2021, the improved administrative information dataset management plan will be reflected in public records-related laws and guidelines. Through this, the administrative information dataset becomes the target of full-scale public record management. Although public records have been converted to electronic documents and even the datasets of administrative information systems have been included in full-scale public records management, research on the quality requirements of data itself as raw data constituting records is still lacking. If data quality is not guaranteed, all four properties of records will be threatened in the dataset, which is a structure of data and an aggregate of records. Moreover, if the reliability of the quality of the data of the administrative information system built by reflecting the various needs of the working departments of the institution without considering the standards of the standard records management system is insufficient, the reliability of the public records itself can not be secured. This study is based on the administrative information dataset management plan presented in the "Administrative Information Dataset Recorded Information Service and Utilization Model Study" conducted by the National Archives of Korea in 2021. A study was conducted. By referring to various data, especially public data-related policies and guides, which are being promoted across the government, we would like to derive quality evaluation requirements in terms of records management and present specific indicators. Through this, it is expected that it will be helpful for record management of administrative information dataset which will be in full swing in the future.
Journal of the Architectural Institute of Korea Planning & Design
/
v.34
no.9
/
pp.21-30
/
2018
This study aims for improving the system in Disaster Management of Local Government. In addition, the overall disaster management system was compared to the effectiveness of the disaster prevention system and reliability, and problems and improvement points were derived. The disaster management system in Korea has a structure that promptly investigates and restores damage by a simple procedure. Korea disaster management system manages information on top-down structural disasters through the flow of prevention, preparation, response, and recovery. The process from disaster response to recovery under the leadership of the central disaster safety headquarters is simplified. Disaster management tasks are dispersed among departments, making it difficult to respond promptly. Under the control of the central government, disaster management, such as disaster prevention, investigation, and recovery, are carried out. The disaster management improvement direction of the local government should establish the disaster response system focusing on the local government. Therefore, it is necessary to have budget to operate the organization - centered disaster management budget and the disaster management organization. The disaster response manual should be prepared considering the disaster environment and disaster prevention plan. In order to utilize disaster information, it is necessary to reorganize information system such as integrate and streamline of the private resource database and NDMS.
Park, Soo-Choong;Lee, Seong-Gwon;Jung, Kye-Young;Kim, Jae-Jin
Proceedings of the KSR Conference
/
2011.10a
/
pp.1282-1288
/
2011
Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.