• 제목/요약/키워드: reliability management plan

검색결과 263건 처리시간 0.022초

The Reliability of Preoperative Simulation Surgery Planning for Distraction Osteogensis in Craniosynostosis Patients

  • Hussein, Mohammed Ahmed;Kim, Yong Oock
    • Journal of International Society for Simulation Surgery
    • /
    • 제3권1호
    • /
    • pp.22-27
    • /
    • 2016
  • Background Craniosynostosis management using distraction osteogensis represent a challenge for surgeons due to the great variability of the skull deformity even within the same etiology. The ability to apply the simulation surgery for improving the preoperative planning for distraction osteogensis could improve the results.Planning and Simulation 14 patients presented with craniosynostosis had been subjected to simulation surgery prior to real surgery. 3D CT scans was obtained upon patient admission. Adjustment of all skull position to Frankfort horizontal plane was done. 3 different distraction osteogensis plans were done for each patient according to the skull morphology. For each plane, movement for each bone segment was done according to the pre-planned distraction vectors. Also the distances of distractions were pre-determined according to the cephalic index as well as brain volume. Intraoperatively, we choose the most appropriate plan for the patient by the surgeon. At the end of distraction, 3D CT scan was obtained, and was compared to the simulation plan. Also the distance and the direction of distraction was compared to that of the plan. Accordingly, the distance was almost matching that of the simulation surgery, however the vector of distraction was not matched.Conclusion Preoperative stimulation planning for craniosynostosis patient is very valuable tool in the surgical management of craniosynostosis patients.

도로자산관리를 위한 포장종합평가지수의 속성과 변화과정의 모델링 (Internal Property and Stochastic Deterioration Modeling of Total Pavement Condition Index for Transportation Asset Management)

  • 한대석;도명식;김부일
    • 한국도로학회논문집
    • /
    • 제19권5호
    • /
    • pp.1-11
    • /
    • 2017
  • PURPOSES : This study is aimed at development of a stochastic pavement deterioration forecasting model using National Highway Pavement Condition Index (NHPCI) to support infrastructure asset management. Using this model, the deterioration process regarding life expectancy, deterioration speed change, and reliability were estimated. METHODS : Eight years of Long-Term Pavement Performance (LTPP) data fused with traffic loads (Equivalent Single Axle Loads; ESAL) and structural capacity (Structural Number of Pavement; SNP) were used for the deterioration modeling. As an ideal stochastic model for asset management, Bayesian Markov multi-state exponential hazard model was introduced. RESULTS:The interval of NHPCI was empirically distributed from 8 to 2, and the estimation functions of individual condition indices (crack, rutting, and IRI) in conjunction with the NHPCI index were suggested. The derived deterioration curve shows that life expectancies for the preventive maintenance level was 8.34 years. The general life expectancy was 12.77 years and located in the statistical interval of 11.10-15.58 years at a 95.5% reliability level. CONCLUSIONS : This study originates and contributes to suggesting a simple way to develop a pavement deterioration model using the total condition index that considers road user satisfaction. A definition for level of service system and the corresponding life expectancies are useful for building long-term maintenance plan, especially in Life Cycle Cost Analysis (LCCA) work.

자동차 부품 프레스공정의 생산시스템 구축 (Construction of Production System for The Automotive Components at Press processes)

  • 손재율
    • 한국기계가공학회지
    • /
    • 제8권3호
    • /
    • pp.54-61
    • /
    • 2009
  • General manufacturing process of the manufacturing time and manufacturing process problems have a problem. In the past, in the manufacturing process the data by hand has been. Therefore, the production performance management information, and materials input, output information, equipment information of the failure of the management problems emerged. Through this research, improvements in real-time production information to collect distribution and overall productivity will increase the efficiency of the system. the production process to improve the quality of management, efficient production methods are presented. is a stable quality control. POP system The new building should be. This is the executive or administrative decisions support. It increases productivity, efficiency, and reduce production costs, increase product reliability. This will increase the company's reputation. This increases the competitiveness of enterprises. POP system toward the future with the new destroyer to prepare for our company. Collectively POP system build this research improves the reliability of the product. Improves the quality of customer service. The expansion of product sales is. increase the competitiveness of enterprises. companies should prepare for the future of the business.

  • PDF

우주 발사 시스템 개발에 있어서의 SE 관리기법 적용 (Application of SE Management Techniques for Space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.53-60
    • /
    • 2005
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effectiveness of these techniques. Management plans and guides are prepared for the work breakdown structure, data, configuration, interface control, quality assurance, procurement, reliability, risk and verification/validat ion. Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering management system.

  • PDF

회피비용을 고려한 EGEAS 모형 개발과 전원개발계획의 최적화 (A Modified EGEAS Model with Avoided Cost and the Optimization of Generation Expansion Plan)

  • 이재관;홍성의
    • 경영과학
    • /
    • 제17권1호
    • /
    • pp.117-134
    • /
    • 2000
  • Pubilc utility industries including the electric utility industry are facing a new stream of privatization com-petition with the private sector and deregulation. The necewssity to solve now and in the future power supply and demand problems has been increasing through the sophisticated generation expansion plan(GEP) approach con-sidering not only KEPCo's supply-side resources but also outside resources such as non-utility generation(NUG) demand-side management (DSM). Under the environmental situation in the current electric utility industry a new approach is needed to acquire multiple resources competitively. This study presents the development of a modified electric generation expansion analysis system(EGEAS) model with avoided cost based on the existing EGEAS model which is a dynamic program to develope an optimal generation expansion plan for the electric utility. We are trying to find optimal GEP in Korea's case using our modified model and observe the difference for the level of reliabilities such as the reserve margin(RM) loss of load probability(LOLP) and expected unserved energy percent(EUEP) between the existing EGEAS model and our model. In addition we are trying to calculate avoided cost for NUG resources which is a criterion to evaluate herem and test possibility of connection calculation of avoided cost with GEP implementation using our modified model. The results of our case study are as follows. First we were able to find that the generation expansion plan and reliability measures were largely influenced by capacity size and loading status of NUG resources, Second we were able to find that avoided cost which are criteria to evaluate NUG resources could be calculated by using our modified EGEAS model with avoided cost. We also note that avoided costs were calculated by our model in connection with generation expansion plans.

  • PDF

블록체인 기반 스포츠 선수 관련 상품의 진품 정보 관리 방안 (Plan for an Information Management System on Sports Players' Related Goods based on Blockchain)

  • 유강수;김세민
    • 산업융합연구
    • /
    • 제18권4호
    • /
    • pp.87-92
    • /
    • 2020
  • 최근 COVID-19로 인한 생활 속 거리두기의 영향으로 여러 스포츠 이벤트들이 취소 또는 연기되거나 무관중 경기로 진행되고 있다. 이에 스포츠 상품 관련 시장이 침체되어 많은 이들이 어려움을 겪고 있다. 이를 극복하기 위해 스포츠 시장 관련자들은 온라인 팬 서비스나 온라인 판매 등 여러 방법을 모색하고 있다. 따라서 본 연구에서는 스포츠 관련 상품의 진품 정보를 관리할 수 있는 방안을 제안하였다. 그에 맞춰 블록 구조, 시스템 흐름, 네트워크 모델을 설계하고 프로토타입을 개발하였다. 이에 도출된 방안을 통하여 전문가를 초빙하여 표적 집단 면접(FGI)을 진행하여 거래과정의 신뢰도와 안정성, 결제의 신뢰도와 안정성, 사고 추적, 시스템의 신뢰도와 안정성을 평가하였다. 본 연구를 통하여 소비자들이 굿즈, 애장품, 싸인볼 등의 스포츠 관련 제품을 거래할 때 신뢰성을 가질 수 있게 할 수 있다.

국도 시설물 유지관리를 위한 현장점검시스템 개발 (The Development of Visual Inspection System for National Road Facility Maintenance Management)

  • 주기범;김태학;박상근
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2003년도 종합학술대회 논문집
    • /
    • pp.72-77
    • /
    • 2003
  • 시설물의 손상현황을 파악하기 위한 현장점검업무는 의사결정과 유지보수공사를 위한 원천 정보를 생성하는 과정으로서 시설물 유지관리 Life Cycle에서 매우 중요한 부분을 차지하고 있다. 하지만, 수작업 및 중복입력 둥의 과다한 업무와 손상상태의 결정, 점검이력의 활용미비, 유지관리업무의 전문성 부족 등으로 효율성과 신뢰성을 갖춘 점검업무가 수행되지 못하고 있는 실정이다. 본 연구에서는 국도 상의 주요구조물인 교량, 터널, 지하차도 등을 대상으로 과다한 현장점검업무를 효율적으로 처리하고 점검결과에 신뢰성을 제공할 수 있는 현장점검시스템을 개발하였다. 현장점검업무의 분석과정에서 나타나는 문제점들을 파악하여 개선방안을 기능설계에서 반영하여 시스템화하였다. 본 시스템은 국도유지건설사무소에서 활용할 애정이며, 손상상태의 추적, 보수 물량 산출 등 유지관리 업무의 효율적인 관리가 가능해질 것으로 기대된다.

  • PDF

지역개발사업의 효율적 관리 및 활용을 위한 관리체계 구축에 관한 연구 (A Study on Construction of Management System for Efficient Management and Application of Regional Development Project)

  • 김남정
    • 토지주택연구
    • /
    • 제7권1호
    • /
    • pp.1-8
    • /
    • 2016
  • 본 연구는 '지역 개발 및 지원에 관한 법률' 시행에 맞춰 이전보다 강화된 지역개발사업 관리방안을 모색하는데 연구의 목적을 갖고 있다. 이를 위해 그동안 지적되어 온 지역개발사업 관리의식의 부족, 통합관리체계의 부재, 사업관리 정보의 신뢰성 부족 등을 개선하고자 다음과 같은 개선방안을 제시하였다. 첫째, 지역개발사업의 관리는 관계법령에 기초한 사업평가관리 체계로 운영할 필요가 있다. 둘째, 지역개발사업의 다양한 정보를 DB화하여 중앙정부 및 지방자치단체에서 활용 가능한 정보시스템을 구축하여야 한다. 셋째, 지역개발사업 관리의 효율성과 전문성을 제고하기 위해 전문위탁 기관 등을 활용한 사업관리 체계마련이 필요하다. 마지막으로 담당 공무원의 전문성 및 책임성을 제고하기 위한 업무환경 개선이 필요하다.

Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • 한국건설관리학회논문집
    • /
    • 제3권4호
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

고효율기기의 보급확산에 따른 전력시스템 공급신뢰도의 영향분석 (Analysis on the Power System Reliability Characteristics according to the High-Efficient End-Use Diffusion)

  • 장승찬;황성욱;조형준;김정훈;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.239-241
    • /
    • 1998
  • The probabilistic production simulation of power system generally has been used to formulate a reasonable power production plan or generation planning. It integrates the convolution process of a generating unit's random outage(FOR) with equivalent load duration curve(ELDC), and provides the reliability indices of power system. This paper presents the reliability characteristics of power system reflected on demand side management and proposes the modified ELDC representation technique due to the high-efficient end-use diffusion among the customers. Load reductions are simulated from the multi-state deconvolution process with the saved capacity of end-use. Case study shows the computed reliability from the power system production simulation incorporated with DSM planning scheme.

  • PDF