• Title/Summary/Keyword: reinforced bridge

Search Result 728, Processing Time 0.038 seconds

Analysis of steel-GFRP reinforced concrete circular columns

  • Shraideh, M.S.;Aboutaha, R.S.
    • Computers and Concrete
    • /
    • v.11 no.4
    • /
    • pp.351-364
    • /
    • 2013
  • This paper presents results from an analytical investigation of the behavior of steel reinforced concrete circular column sections with additional Glass Fiber Reinforced Polymers (GFRP) bars. The primary application of this composite section is to relocate the plastic hinge region from the column-footing joint where repair is difficult and expensive. Mainly, the study focuses on the development of the full nominal moment-axial load (M-P) interaction diagrams for hybrid concrete sections, reinforced with steel bars as primary reinforcement, and GFRP as auxiliary control bars. A large parametric study of circular steel reinforced concrete members were undertaken using a purpose-built MATLAB(c) code. The parameters considered were amount, location, dimensions and mechanical properties of steel, GFRP and concrete. The results indicate that the plastic hinge was indeed shifted to a less critical and congested region, thus facilitating cost-effective repair. Moreover, the reinforced concrete steel-GFRP section exhibited high strength and good ductility.

Punching Shear Strength of Reinforced Concrete Bridge Decks with LB-DECK (LB-DECK를 이용한 철근콘크리트바닥판의 펀칭전단강도)

  • Youn, Seok-Goo;Lee, Jae-Hong;Cho, Sun-Kyu;Jeong, Jae-Dong;Won, Yong-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.390-393
    • /
    • 2006
  • LB-DECK is used for both of permanent formwork and structural component with cast-in place concrete of concrete bridge decks. Current Korean design code recommends that concrete bridge deck with precast concrete panels have to be designed only using conventional flexural design method and does not allow the empirical design method which is based on punching shear strength of bridge deck. This paper present experimental test results of punching shear strength of concrete bridge decks with LB-DECKs. Six full-scaled concrete bridge decks, which are designed with the empirical design method, are fabricated with variation of girder spacings. Test results are presented in the paper and compared with the code predictions of ACI 318, CEB-FIP MC90. Based on the test results, it is proposed that LB-DECK is suitable to apply the empirical design method for concrete bridge decks.

  • PDF

Ambient vibration testing of Berta Highway Bridge with post-tension tendons

  • Kudu, Fatma Nur;Bayraktar, Alemdar;Bakir, Pelin Gundes;Turker, Temel;Altunisik, Ahmet Can
    • Steel and Composite Structures
    • /
    • v.16 no.1
    • /
    • pp.21-44
    • /
    • 2014
  • The aim of this study is to determine the dynamic characteristics of long reinforced concrete highway bridges with post-tension tendons using analytical and experimental methods. It is known that the deck length and height of bridges are affected the dynamic characteristics considerably. For this purpose, Berta Bridge constructed in deep valley, in Artvin, Turkey, is selected as an application. The Bridge has two piers with height of 109.245 m and 85.193 m, and the total length of deck is 340.0 m. Analytical and experimental studies are carried out on Berta Bridge which was built in accordance with the balanced cantilever method. Finite Element Method (FEM) and Operational Modal Analysis (OMA) which considers ambient vibration data were used in analytical and experimental studies, respectively. Finite element model of the bridge is created by using SAP2000 program to obtain analytical dynamic characteristics such as the natural frequencies and mode shapes. The ambient vibration tests are performed using Operational Modal Analysis under wind and human loads. Enhanced Frequency Domain Decomposition (EFDD) and Stochastic Subspace Identification (SSI) methods are used to obtain experimental dynamic characteristics like natural frequencies, mode shapes and damping ratios. At the end of the study, analytical and experimental dynamic characteristic are compared with each other and the finite element model of the bridge was updated considering the material properties and boundary conditions. It is emphasized that Operational Modal Analysis method based on the ambient vibrations can be used safely to determine the dynamic characteristics, to update the finite element models, and to monitor the structural health of long reinforced concrete highway bridges constructed with the balanced cantilever method.

Influence of shear on seismic performance and failure mode of RC piers (전단이 RC 교각의 지진성능 및 파괴모드에 미치는 영향)

  • Lee, Do-Hyeong
    • The Journal of Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.53-63
    • /
    • 2004
  • In this paper, influence of shear on the seismic performance and failure mode of reinforced concrete piers subjected to earthquake loading is investigated. Comparative study has been carried out for reinforced concrete column tests to verify the shear-axial interaction model presented in this paper. Comparison shows that predicted shear hysteretic response agrees well with the test results. Also conducted is a nonlinear time-history analysis of a reinforced concrete bridge damaged by the Kobe earthquake using the current development. Displacement response for piers reveals that maximum displacement is considerably increased due to the effect of shear coupled with axial force variation, which leads to overall stiffness degradation and period elongation. It is therefore concluded that the response considering both shear and axial force gives better explanation regarding the seismic damage evaluation of reinforced concrete bridge piers.

  • PDF

Pseudo-Dynamic Test of Circular Reinforced Concrete Bridge Piers for Seismic Performance (원형 콘크리트 교각의 내진거동에 관한 유사동적 실험)

  • 박종협
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.409-416
    • /
    • 2000
  • This research aims at evaluating the seismic performance of the existing R/C bridge piers which were nonseismically or seismically designed in accordance with the provision of Korea Highway Design Specification. Further experimental investigations have been doing to figure out the retrofitting effects of nonseismic R/C bridge piers confined with glass fiber at the plastic hinge zone. Pseudo-dynamic tests have been carried out on nine scaled R/C column specimens to investigate their hysteretic behavior under earthquake loading, Test parameters are axial load input ground motion confinement steel ration glass fiber and etc,

  • PDF

Reliability Analysis of RC Rahmen Bridge Design (철근콘크리트 라멘교 설계의 신뢰도 분석)

  • Paik, In-Yeol;Kim, Kee-Jun;Hwang, Chul-Sung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.239-241
    • /
    • 2005
  • Reliability analysis of the design of reinforced concrete rahmen bridge is performed. Statistical properties for loads and resistances are taken into account in the analysis and the reliability indices are calculated for strength limit state of the current bridge design specification. Results are presented and discussed for different span lengths and wall heights.

  • PDF

Fatigue Behavior of the Strengthened Bridge Deck with CFS (CFS로 성능향상된 교량상판의 피로거동 특성)

  • 심종성;오홍섭;유재명
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.701-704
    • /
    • 2000
  • Considerable research has been done to study the fatigue behavior of reinforced concrete bridge deck which is strengthened by carbon fiber sheets. Before the strengthening, the specimen was damaged by repeated loads with various repeat cycles. The results of this study show that strengthening efficiency is getting rised in the lower pre-damaged degree. When the fatigue damaged bridge-deck is strengthened, the crack propagation may be controled efficiently

  • PDF

A study on Grid deck for LRT (경량전철용 I형강 격자바닥판에 관한 연구)

  • 이기승;백진기;구자성;이안호;성택룡
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.328-335
    • /
    • 2000
  • The substructure of Light Rail Transit is mainly built on elevated structure that is composed of pier, girder and bridge deck. The bridge deck mostly has been made by field formed reinforced concrete so far. The objectives of the study are to find a method for design and construction of the new bridge deck. I-beam is fabricated to make grid and concrete is poured on it at factory. This type can be used for maintenance of duty line by advantages such as good quality control and short construction time.

  • PDF

The Analytical Study for Effects of Intermediate Diaphragms in Concrete Girder Bridge (콘크리트 거더 교량의 중간 격벽 영향에 관한 해석적 연구)

  • 이호근;고성현;이규정;정원기;이재훈;이형준
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.839-844
    • /
    • 2000
  • The research was conducted to investigate the effects of intermediate diaphragm in concrete girder bridge. The analytical variables consisted of various types(reinforced concrete and steel) and locations of intermediate diaphragm, slab thickness, girder spacing etc. Finite element analyses of the bridge model assuming simply support condition. The Vertical load distribution was determined to be essentially independent of type and location of intermediate diaphragms. Also, it is found that the practical design of intermediate diaphragm may be revised.

A Study on Behavior of Post-integrated Abutment Bridge When Abutment and Bridge Decks are Jammed (교대 협착 발생 시 무조인트화 교량의 거동 분석 연구)

  • Park, Yang Heum;Nam, Moon S.;Jang, Il Young
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.3
    • /
    • pp.31-35
    • /
    • 2021
  • The expansion joints installed on the bridge for the accommodation of expansion and contraction of the supper structure are essential members of the bridge. However, the expansion joints are deteriorated over time and the waterproof function weakens, causing rainwater to penetrate and deteriorate the structure. In order to solve the traffic congestion caused by frequent replacement of the old expansion joints along with the deterioration of the structure, a post-integrated abutment bridge in which the existing expansion joints are removed and replaced with reinforced concrete link connection has been applied to highway bridges since 2016. After the post-integrated abutment method was applied, it was partially applied to bridges in which the superstructure and abutment were jammed. In this study, the causes of problems that may occur when the post-integrated abutment method is applied to the jammed bridge were analyzed numerically. It was analyzed that damage occurred in the link connection part. Based on the results of this study, the application condition for the post-integrated abutment method is reinforced as it is not possible to apply the post-integrated abutment method to bridges are already jammed.