• Title/Summary/Keyword: real-time schedule

Search Result 232, Processing Time 0.027 seconds

Determination of Work Schedule Type by Dynamic Programming (동적계획모형을 이용한 근무형태 결정)

  • 김중순;안봉근;손달호
    • Korean Management Science Review
    • /
    • v.20 no.2
    • /
    • pp.33-43
    • /
    • 2003
  • In this paper we applied dynamic programming to determining work schedule type. In dynamic programming formulation, each day during a planning horizon represents a stage for which a decision is made. The alternatives are given by work schedule types that combine regular time, overtime, additional shift, and so on. In this case, their associated return function is labor cost. The state is defined as the amount of work time allocated to stage 1, stage 2,…, and current stage. A case study for a real manufacturing company was performed to apply dynamic programming to scheduling daily work hours during a week. The case study showed that total cost of our solution derived from dynamic programming decreased by about 6% as compared with the solution obtained from the previous method.

On Energy-Optimal Voltage Scheduling for Fixed-Priority Hard Real-Time Systems (고정 우선순위 경성 실시간 시스템에 대한 최적의 전압 스케줄링)

  • 윤한샘;김지홍
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.31 no.10
    • /
    • pp.562-574
    • /
    • 2004
  • We address the problem of energy-optimal voltage scheduling for fixed-priority hard real-time systems. First, we prove that the problem is NP-hard. Then, we present a fully polynomial time approximation scheme (FPTAS) for the problem. for any $\varepsilon$>0, the proposed approximation scheme computes a voltage schedule whose energy consumption is at most (1+$\varepsilon$) times that of the optimal voltage schedule. Furthermore, the running time of the proposed approximation scheme is bounded by a polynomial function of the number of input jobs and 1/$\varepsilon$. Experimental results show that the approximation scheme finds more efficient voltage schedules faster than the best existing heuristic.

A Distributed Sequential Link Schedule Combined with Routing in Wireless Mesh Networks

  • Cha, Jae-Ryong;Kim, Jae-Hyun
    • ETRI Journal
    • /
    • v.34 no.3
    • /
    • pp.462-465
    • /
    • 2012
  • This letter proposes a new distributed scheduling scheme combined with routing to support the quality of service of real-time applications in wireless mesh networks. Next, this letter drives average end-to-end delay of the proposed scheduling scheme that sequentially schedules the slots on a path. Finally, this letter simulates the time division multiple access network for performance comparison. From the simulation results, when the average number of hops is 2.02, 2.66, 4.1, 4.75, and 6.3, the proposed sequential scheduling scheme reduces the average end-to-end delay by about 28%, 10%, 17%, 27%, and 30%, respectively, compared to the conventional random scheduling scheme.

A Study on the Heuristics Algorithm for a establishing Vehicle Scheduling Plan under dynamic environments - With the emphasis on the GPS and Digital Map - (동적인 환경하에서의 차량경로계획 수립을 위한 발견적 기법에 관한 연구 - GPS와 전자지도의 활용을 중심으로 -)

  • 박영태;김용우;강승우
    • Proceedings of the Korean DIstribution Association Conference
    • /
    • 2003.05a
    • /
    • pp.55-70
    • /
    • 2003
  • The most transport companies are placing increasing emphasis on powerful new techniques for planning their vehicle operations. They have tried to improve their vehicle control and customer service capability by adopting tile advanced information technology, such as GPS(Global Position System) and Using Digital Map. But researches on the VRSP(vehicle routing St schedule problem) in this situation were very few. The purpose of this research is to develop vehicle scheduling heuristics for making a real-time dynamic VRSP under the situation that GPS and using Digital Map are equipped to the transport company. Modified savings techniques are suggested for the heuristic method and an insertion technique is suggested for the dynamic VRSP. The urgent vehicle schedule is based on the regular vehicle schedule. This study suggest on VRSP system using GPS and Digital Map and the performance of the suggested heuristics is illustrated through an real case example.

  • PDF

Automatic Alignment System for Group Schedule of Event-based Real-time Response Web Processing using Node.js

  • Kim, Hee-Wan
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.1
    • /
    • pp.26-33
    • /
    • 2018
  • A web application running on the Internet is causing many difficulties for a program developer, and it requires to process multiple sessions at the same time due to the occurrence of excessive traffic. Web applications should be able to process concurrent requests efficiently and in real time. Node.js is a single-threaded server-side JavaScript environment implemented in C and C ++ as one of the latest frameworks to implement event models across the entire stack. Nodes implement JavaScript quickly and robust to achieve the best performance using a JavaScript V8 engine developed by Google. In this paper, it will be explained the operation principle of Node.js, which is a lightweight real-time web server that can be implemented in JavaScript for real-time responsive web applications. In addition, this application was practically implemented through automatic alignment system for group scheduling to demonstrate event-based real-time response web processing.

Development and Analysis of Real-time Distributed Air Defense System Simulator Using a Software Framework (소프트웨어 프레임워크를 이용한 대공유도무기 실시간 분산 시뮬레이터 개발 및 분석)

  • Cho, Byung-Gyu;Youn, Cheong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.4 s.23
    • /
    • pp.58-67
    • /
    • 2005
  • To overcome limitations of test scope, schedule and cost, M&S(Modeling & Simulation) technique has been applied for T&E(Test and Evaluation) of the state-of-art weapon systems. This paper proposes an air defense simulation software framework to reduce both redundancy an[1 programming errors in system simulator. The proposed framework consists of a 'model' and a 'middleware' The 'middleware' is a reliable communication service layer that supports not only HLA(High Level Architecture) which is an international standard in M&S but also TCP/IP, UDP and etc. The main role of 'model' is to schedule and to run the real-time distributed simulation. The proposed framework has been applied to M-SAM(Middle range Surface to Air Missile) system simulator. The proposed framework's scheduling and communication performance results are satisfactory and were measured by hardwired NTP(Network Timer Protocol) time-stamp with GPS(Global Positioning System) timer for better precision.

Fault-tolerant Scheduling of Real-time Parallel Tasks with Energy Efficiency on Multicore Processors (멀티코어 프로세서 상에서 에너지 효율을 고려한 실시간 병렬 작업들의 결함 포용 스케쥴링)

  • Lee, Kwanwoo
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.3 no.6
    • /
    • pp.173-178
    • /
    • 2014
  • By exploiting parallel processing, the proposed scheduling scheme enhances energy saving capability of multicore processors for real-time tasks while satisfying deadline and fault tolerance constraints. The scheme searches for a near minimum-energy schedule within a polynomial time, because finding the minimum-energy schedule on multicore processors is a NP-hard problem. The scheme consumes manifestly less energy than the state-of-the-arts method even with low parallel processing speedup as well as with high parallel processing speedup, and saves the energy consumption up to 86%.

Development of a Scheduling System for Mould and Die Manufacturing Factory Using Microsoft Project 98 (Microsoft Project 98을 이용한 금형공장의 일정계획 시스템 개발)

  • Ju, Sang-Yoon;Ok, Kyung-Jin
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.246-252
    • /
    • 2000
  • As moulds and dies are manufactured through complex processes under the make-to-order production environment, it is very difficult that the manufacturing activities as like observance of the due date, trace of the progress, etc are controlled with a real time. In this paper, a schedule-planning system using the commercial software Microsoft Project 98 is developed to control the procedures of mould and die manufacturing with real time. Once an initial schedule is planned from the BOM information in the intranet, it is rescheduled by data collected from machines on the shop floor. The system is suitable to medium- or small-sized manufacturing companies as well as large-sized ones, because it can be installed with a low cost.

  • PDF

Message Scheduling Algorithm for Hard Real-time Communications of Periodic Messages on a Switched Ethernet (스위칭이더넷에서 주기적 메시지에 대한 경성 실시간 통신을 위한 메시지 스케쥴링 알고리즘)

  • Kim Myung-Kyun;Lee Hee-Chan
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.9
    • /
    • pp.684-690
    • /
    • 2006
  • This paper proposes a message transmission model for hard real-time communications of periodic messages on a switched Ethernet and also proposes an algorithm to schedule the messages to be transmitted within their deadlines. The proposed scheduling algorithm is a distributed one and is peformed by the source and the destination nodes without the modification of the operational features of the standard Ethernet switch. When a new periodic message needs to be transmitted, it is first checked whether it can be scheduled on both the transmission and the reception links without affecting the already-scheduled messages, and a feasible schedule is made for the new message if it is schedulable. The proposed scheduling algorithm guarantees the transmission of periodic messages within their deadline and allows flexible message transmission on a hard real-time switched Ethernet through the dynamic addition of new periodic messages during run-time.

Design of Scheduling System for Flexible Manufacturing Cells (FMC에서의 일정계획 시스템의 설계)

  • 신대혁;이상완
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.63-71
    • /
    • 1994
  • The purpose of this paper is to describe an effective cell scheduling system for flexible manufacturing cells. Based on the FMC characteristics, cell scheduling can be defined as a dynamic modified flow shop working in a real-time system. This paper attempt to find the optimal cell scheduling when minimizing the mean flow time for n-job/m-machine problems in static and dynamic environments. Real-time scheduling in an FMC environment requires rapid computation of the schedule.

  • PDF