• 제목/요약/키워드: real power loss minimization

검색결과 22건 처리시간 0.021초

Coordinated Voltage and Reactive Power Control Strategy with Distributed Generator for Improving the Operational Efficiency

  • Jeong, Ki-Seok;Lee, Hyun-Chul;Baek, Young-Sik;Park, Ji-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권6호
    • /
    • pp.1261-1268
    • /
    • 2013
  • This study proposes a voltage and reactive coordinative control strategy with distributed generator (DG) in a distribution power system. The aim is to determine the optimum dispatch schedules for an on-load tap changer (OLTC), distributed generator settings and all shunt capacitor switching on the load and DG generation profile in a day. The proposed method minimizes the real power losses and improves the voltage profile using squared deviations of bus voltages. The results indicate that the proposed method reduces the real losses and voltage fluctuations and improve receiving power factor. This paper proposes coordinated voltage and reactive power control methods that adjust optimal control values of capacitor banks, OLTC, and the AVR of DGs by using a voltage sensitivity factor (VSF) and dynamic programming (DP) with branch-and-bound (B&B) method. To avoid the computational burden, we try to limit the possible states to 24 stages by using a flexible searching space at each stage. Finally, we will show the effectiveness of the proposed method by using operational cost of real power losses and voltage deviation factor as evaluation index for a whole day in a power system with distributed generators.

수도권 순동 무효전력 확보를 위한 FACTS 협조제어 시스템 온라인 설치 (Installation of MFC(Multiple FACTS Coordinated control) On-line System for the Spinning Reserve of a Reactive Power in Metropolitan Area)

  • 장병훈;문승필;하용구;전웅재
    • 전기학회논문지
    • /
    • 제59권12호
    • /
    • pp.2131-2134
    • /
    • 2010
  • In this paper, the on-line system schemes for coordinated control system of multiple FACTS were presented to enhance the voltage stability around the metropolitan areas. In order to coordinated control system of FACTS devices, MFC on-line system calculates the optimal set point(Vref, Qrev) of FACTS devices using the coordinated control algorithm with real time network data which is transferred from SCADA/EMS system. If the system is unstable after contingencies, the new operation set-point of FACTS would be determined using bus sensitivity from tangent vector at voltage instability point. Otherwise, we would determine the new operation set-point of FACTS for considering economical operation, like as active power loss minimization using Optimal Power Flow algorithm. As the test, MFC(Multiple FACTS Coordinated control) on-line system will be installed in Korea power system.

다기의 FACTS 기기 협조제어 시스템 개발 (Development of Cooperated Control System for Multiple FACTS in KEPCO Power Systems)

  • 장병훈
    • 전기학회논문지
    • /
    • 제57권10호
    • /
    • pp.1726-1730
    • /
    • 2008
  • In this paper, the application schemes for coordinated control system of multiple FACTS were presented to enhance the voltage stability around the metropolitan areas. In order to coordinated control of FACTS devices, f-V analysis method which is one of the indices for voltage stability was performed with real time network data which is transferred from SCADA/EMS system. If the system is unstable after contingencies, the new operation set-point of FACTS would be determined using bus sensitivity from tangent vector at voltage instability point. Otherwise, we would determine the new operation set-point of FACTS for considering economical operation, like as active power loss minimization using Optimal Power Flow algorithm. In simulation, the SCADA/EMS 2007's data are used for studying the coordinated control algorithm of multiple FACTS devices that is installed or will be installed in KOREA power system

배전계통 사고복구 구성탐색을 위한 개선된 다익스트라 알고리즘과 퍼지규칙의 적용 (An Application of advanced Dijkstra algorithm and Fuzzy rule to search a restoration topology in Distribution Systems)

  • 김훈;전영재;김재철;최도혁;정용철;추동욱
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.537-540
    • /
    • 2000
  • The Distribution System consist of many tie-line switches and sectionalizing switches, operated a radial type. When an outage occurs in Distribution System, outage areas are isolated by system switches, has to restored as soon as possible. At this time, system operator have to get a information about network topology for service restoration of outage areas. Therefore, the searching result of restorative topology has to fast computation time and reliable result topology for to restore a electric service to outage areas, equal to optimal switching operation problem. So, the problem can be defined as combinatorial optimization problem. The service restoration problem is so important problem which have outage area minimization, outage loss minimization. Many researcher is applying to the service restoration problem with various techniques. In this paper, advanced Dijkstra algorithm is applied to searching a restoration topology, is so efficient to searching a shortest path in graph type network. Additionally, fuzzy rules and operator are applied to overcome a fuzziness of correlation with input data. The present technique has superior results which are fast computation time and searching results than previous researches, demonstrated by example distribution model system which has 3 feeders, 26 buses. For a application capability to real distribution system, additionally demonstrated by real distribution system of KEPCO(Korea Electric Power Corporation) which has 8 feeders and 140 buses.

  • PDF

태양광 모듈의 전압 및 전류 파형을 이용한 부정합 진단 기법 (Diagnosis Method of PV Module Mismatch using Voltage and Current Waveforms)

  • 안희욱;박기엽
    • 한국태양에너지학회 논문집
    • /
    • 제31권3호
    • /
    • pp.17-22
    • /
    • 2011
  • Techniques for mismatch loss minimization to increase the PV system efficiency are under development recently. In this paper, a method to make diagnosis of PV module mismatch is presented, which uses a concept of operating point factor. The method is based on the fact that the ratio of the incremental conductance of a PV module to instantaneous conductance is 1 when the module is operating at its maximum power point. The variations of module voltage and current are taking place by the maximum power point tracker in the power conditioning units of PV system. The effectiveness of the method is verified through an application to a real PV system.

방사상 전력계통의 전압안정도 향상에 관한 연구 (A Study on the Voltage Stability Enhancement in Radial Power System)

  • 김병섭;정윤원;신중린;박종배;채명석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.87-89
    • /
    • 2002
  • This paper presents a new approach using an Improved branch exchange (IBE) technique to maximize the voltage stability as well as loss minimization in radial power systems. A suitable voltage stability index (VSI) for optimal routing algorithm is developed using novel methods both a critical transmission path based on a voltage phasor approach and an equivalent impedance method. Furthermore, the proposed algorithm can automatically detect the critical transmission path to be reached to a critical load faced with voltage collapse due to additional real or reactive leading. To develop an effective optimization technique, we also have applied a branch exchange algorithm based on a newly derived index of loss change. The proposed IBE algorithm for VSI maximization can effectively search the optimal topological structures of distribution feeders by changing the open/closed states of the sectionalizing and tie switches. The proposed algorithm has been tested with the various radial power systems to show its favorable performance.

  • PDF

일부하 곡선을 이용한 배전계통 구간부하 관리방법 (A Section Load Management Method using Daily Load Curve in Distribution Systems)

  • 임성일
    • 조명전기설비학회논문지
    • /
    • 제26권6호
    • /
    • pp.47-52
    • /
    • 2012
  • DAS(Distribution Automation System) is equipped with several software applications such as service restoration, loss minimization, and protective relay coordination. The software applications of DAS are very sensitive to the amount of section load being carried by a particular section of distribution lines. Moreover, each software application requires a different parameter of the section load according to its purpose. Therefore, This paper proposes a new section load management method using real-time measurement data of the distribution lines. In order to provide accurate data to DAS applications, this method considers section loads in terms of the relationship of power versus time. In order to establish that the proposed method is feasible, a performance-testing simulator was developed, and case studies were conducted for a modified real distribution network.

적응 FLC-FNN 제어기에 의한 IPMSM의 효율 최적화 제어 (Efficiency Optimization Control of IPMSM with Adaptive FLC-FNN Controller)

  • 최정식;고재섭;정동화
    • 전기학회논문지P
    • /
    • 제56권2호
    • /
    • pp.74-82
    • /
    • 2007
  • Interior permanent magnet synchronous motor(IPMSM) has become a popular choice in electric vehicle applications, due to their excellent power to weight ratio. This paper proposes efficiency optimization control of IPMSM drive using adaptive fuzzy learning control fuzzy neural network (AFLC-FNN) controller. In order to maximize the efficiency in such applications, this paper proposes the optimal control method of the armature current. The controllable electrical loss which consists of the copper loss and the iron loss can be minimized by the optimal control of the armature current. The minimization of loss is possible to realize efficiency optimization control for the proposed IPMSM. The optimal current can be decided according to the operating speed and the load conditions. This paper considers the design and implementation of novel technique of high performance speed control for IPMSM using AFLC-FNN controller. Also, this paper proposes speed control of IPMSM using AFLC-FNN and estimation of speed using ANN controller. The back propagation neural network technique is used to provide a real time adaptive estimation of the motor speed. The proposed control algorithm is applied to IPMSM drive system controlled AFLC-FNN controller, the operating characteristics controlled by efficiency optimization control are examined in detail.

파라미터 적응보상에 의한 유도전동기의 최대효율 제어기법 (Maximum Efficiency Control of an Induction Motor Drive by Parameter Adaptive Compensation)

  • 손진근;최명규;박종찬;나채동;이성범
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 학술대회 논문집 전문대학교육위원
    • /
    • pp.162-166
    • /
    • 2000
  • In this paper, a maximum efficiency control technique of real-time processing in which parameter variation is compensated in vector control of an induction motors(I.M.) is proposed. Based on equivalent model of I.M., a loss minimization factor(LMF) with the variations of speed is derived. To solve problem of inaccuracy of LMF curves due to machine parameter variation, rotor resistance estimation is performed by using instantaneous reactive power. The estimated rotor resistance values are applied to the maximum efficiency control with a LMF.

  • PDF

Congestion Management in Deregulated Power System by Optimal Choice and Allocation of FACTS Controllers Using Multi-Objective Genetic Algorithm

  • Reddy, S. Surender;Kumari, M. Sailaja;Sydulu, M.
    • Journal of Electrical Engineering and Technology
    • /
    • 제4권4호
    • /
    • pp.467-475
    • /
    • 2009
  • Congestion management is one of the technical challenges in power system deregulation. This paper presents single objective and multi-objective optimization approaches for optimal choice, location and size of Static Var Compensators (SVC) and Thyristor Controlled Series Capacitors (TCSC) in deregulated power system to improve branch loading (minimize congestion), improve voltage stability and reduce line losses. Though FACTS controllers offer many advantages, their installation cost is very high. Hence Independent System Operator (ISO) has to locate them optimally to satisfy a desired objective. This paper presents optimal location of FACTS controllers considering branch loading (BL), voltage stability (VS) and loss minimization (LM) as objectives at once using GA. It is observed that the locations that are most favorable with respect to one objective are not suitable locations with respect to other two objectives. Later these competing objectives are optimized simultaneously considering two and three objectives at a time using multi-objective Strength Pareto Evolutionary Algorithms (SPEA). The developed algorithms are tested on IEEE 30 bus system. Various cases like i) uniform line loading ii) line outage iii) bilateral and multilateral transactions between source and sink nodes have been considered to create congestion in the system. The developed algorithms show effective locations for all the cases considered for both single and multiobjective optimization studies.