Bimodal tram is a transit with no-step floor for wheel-chaired persons, with docking to the station precisely and moving on schedule like train. Because of the automatic traveling of bimodal tram to search and follow the magnet embedded in roadway, bimodal tram should be careful about rainfall, snow and wind like a car driving on roadway in respect to natural disasters. Though response procedures in emergency are different according to the passengers' boarding, emergency mobilization is needed if any emergency situation happens. Emergency mobilization is the act of preparing for major catastrophic events, which may affect public transportation systems or their service areas, by assembling and organizing resources, including people, equipment, facilities, communications systems, expert technical support, and public information systems and protocols. Mobilization is the process that ensures that the right people will deploy appropriate resources at the correct time. Effective mobilization requires a partnership of local and state agencies. Public transportation operators and systems play vital roles in response to and recovery from emergencies and other unexpected catastrophic events. These systems, and their capabilities to mobilize resources, are profoundly affected by the decisions and directives of others during these activities. In this study, we focused on the emergency management for bimodal tram and reviewed the considerations about infrastructures under natural disasters, especially heavy rainfall.
In the development process of an ECU (Electrical Control Unit), numerous tests are necessary to evaluate the performance and control algorithm. The vehicle based test is expensive and requires long time. Also, it is difficult to guarantee the safety of the test driver. To overcome the various problems faced in the development process, the ECU test has been done using HIL (Hardware In the Loop). The HIL environment has the actual hardware including an ECU and a virtual vehicle model. In this paper, the test platform environment is devloped for the AWS ECU black box test. The test platform is built on HIL (Hardware In the Loop) architecture. Using the developed test platform, the control algorithm of the AWS ECU can be evaluated under the virtual driving condition of the bi-modal tram. Driving conditions, such as a front steering angle and vehicle velocity, are defined through the PC (Personal Computer) input. Input signals are transformed to electrical signals in the PC. These signals become the input conditions of the AWS ECU. The AWS ECU is stimulated by arbitory input conditons, and responses of the system are observed.
Recently, railroad construction has been increased all over the world and as the train is getting high-speeded, there has been a need for guaranteed safety, so that a requirement for heath monitoring techniques for destruction that generated by gradually accumulated damages is now increasing. Especially the rail is crucial part that contact with wheel directly and delivers the train's load to a sleeper. It needs a technique that can guarantee a safety by sensing the possible cracks. In this paper, when train's load applied to the rail, strain distribution that introduced to entire length of rail is monitored using optical fibre. Optical fibre is used as a medium for measuring the strain and BOCDA (Brillouin Optical Correlation Domain Analysis) system is organized for measuring the distributed variation that implied to optical fibre. Optical fibre is attached at lower flange where tension is maximized when the load of train applied to the rail and strain gauge is implied together to compare the accuracy of measurement.
In this paper, Analysis of parameters effecting on the derailment factor was conducted in oder to deduce technical requisites have to be reflected in design of Track and rolling-stocks because it is important to grasp the risk of derailment quantitatively. And then go far toward becoming practical study with that select two section of sharp curved track of actual train in service, incheon Metro Line 1 and make field research in condition of vehicles and track and analysis As a result of parameter study, the following conclusions were obtained. The radius of curve and Cant is in inverse proportion to the derailment factor, but as train operation velocity, standard deviation of alignment irregularity and the ratio lateral force : wheel load of the inside track increase, the derailment factor rise. In the investigation for the derailment safety of incheon Metro Line 1, the derailment factor was below 0.43 in both section R=200 and R=300, so that it proved safe compare with allowance limits 0.8, but it appeared that risk of the derailment in second transition curve is the highest among the entire curve.
Lee Jin-Wook;Choi Chan-Yong;Lee Sung-Hyok;Lee Cnang-Youl
Proceedings of the KSR Conference
/
2004.10a
/
pp.1058-1064
/
2004
As one of reinforcing methods for soft roadbed, the problems that mud-pumping and settlement occurred by soft roadbed, were investigated, evaluated and analyzed through installing relatively economical and efficient geosynthetics on the selected track-bed for testing. Mock-heang to Dong-ryang on the filed resting sections in the Chung-buk lines were selected as investigating the state of track and prepared field after selecting three of 1,700 spots which often make mud-pumping and requiting maintenance for that. Long curved line radiuses(R) of Mock-heang to Dong-ryang are 500m that were installed with 4 types of geosynthetics layers and one ballast layer. Installed testing cross-section is 200m totally with 40 m between places. Strength or prepared roadbed was measured to investigate the state of roadbed and track with constructing(installing) field testing sections and physical properties of roadbed soils were evaluated and analyzed. Also, mud-pumping, settlement of elastic or plastic sleeper, failure or track, wheel-loads, transverse and earth pressures were measured after installing field testing sections.
Most of the train brakes depends on friction between wheels and tracks. This requires braking force reduced in order not to cause wheel slides since the friction decreases as the train speed increases and consequently results in extension of braking distance. The braking system called 'Linear eddy current brake' or simply' Eddy current brake' is a braking system for making a brake independent from friction, which consists in creating electromagnet by coiling around shoes attached. to bogies; having the shoes above the tracks approached to the tracks upon acknowledgement of a braking command; and authorizing braking force that is irrelevant to friction through magnetic repulsion between electromagnet attached to the tracks and train set by the use of the electromagnet's magnet field characteristics. An electromagnetic attraction braking system that consists in pressing pole shoes attached to bogies against the tracks by using electromagnet's attraction force is called 'Electromagnetic track brake' or simply 'Track brake'. This paper has been prepared in purpose of studying technological tendencies of the eddy current brake and the track brake so that it can be utilized as fundamental data for commissioning Korean high-speed trains with the eddy current brake hereafter.
Journal of the Korean Society for Precision Engineering
/
v.33
no.9
/
pp.739-744
/
2016
The truck that is used as running equipment for tank freight car support is a core structural part that supports the load of the car body and significantly influences the safety of freights and vehicles, as well as their running performance. Running equipment is composed of truck frames, wheels and wheel axles, independent suspensions, and brakes. Among these components, the truck frame supporting the load of the vehicles and freights may be the most important component. This study was carried out to analyze the structure of truck frames and to determine whether they are safe when the maximum vertical load, braking part load, and the front and rear load are applied to truck frames. This was achieved by subjecting the truck frames to stress tests and then measuring the stress on each part. The results of the stress tests showed that truck frames have a safe vehicle load design.
It is of great importance to assure the running safety and ride comfort in designing the floating slab track for the mitigation of train-induced vibration. In this paper, for this, analyzed are the system requirements for the running safety and ride comfort, and then, the behavior of train and track at the transition zone between the floating slab track and the conventional concrete slab track according to several main design variables such as spring constant, damping coefficient, spacing and arrangement of isolators and slab length, using the dynamic analysis technique considering the train-track interaction. The results of numerical analysis demonstrate that the discontinuity of the support stiffness at the transition results in a drastic increase of the vertical vibration acceleration of the train body, wheel-rail interaction force, rail bending stress and uplift force. The increase becomes higher with the decrease of the spring constant of isolators and the increase of the isolator spacing, but the damping ratio does not significantly affect the behavior of train and track at the transition. Therefore, to assure the running safety and ride comfort, simultaneously increasing the effectiveness of vibration isolation, it is effective to minimize the relative vertical offset between the floating slab and the conventional track slab by adjusting the spring constant and spacing of isolators at the transition.
In this paper, assessed are the stability of vehicle and track according to vertical support stiffness difference on the transition between conventional and zero-longitudinal resistance (ZLR) rail fastener on bridge. For this, the spring constants of rail fastener have been determined according to different load ranges - KTX load (with or without impact factor) and test load of EN standards - from results of laboratory test on rail pad, the stability analysis of vehicle and track has been performed according to numbers or installation length of ZLR fasteners using vertical vehicle-track coupled model to consider train-track interaction. The analysis results reveal that only the wheel load variation slightly exceed the limit value when 2 ZLR fasteners are used with spring constant determined within the EN test load range, but, in all other cases, all evaluation items are satisfied. Thus, it can be said that the stability of vehicle and track will not be degraded by ZLR fastener.
Xia, Chaoyi;Wang, Kunpeng;Huang, Jiacheng;Xia, He;Qi, Lin;Wu, Xuan
Structural Engineering and Mechanics
/
v.81
no.1
/
pp.69-79
/
2022
The dynamic responses of a pier-pile-soil system subjected to a barge/flotilla collision are analyzed. A coupled high-speed train and bridge system with a damaged pier after barge/flotilla collision is established by taking the additional unevenness of the track induced by the damaged pier as the self-excitation of the system. The whole process of a CRH2 high-speed train running on the 6×32 m simply-supported PC (prestressed concrete) box-girder bridge with a damaged pier is simulated as a case study. The results show that the lateral displacements and accelerations of the bridge with a damaged pier are much greater than the ones before the collision. The running safety indices of the train increase with the train speed as well as with the number of barges in the flotilla. In flotilla collision, the lateral wheel/rail forces of the train exceed the allowable values at a certain speed, which influences the running safety of the trains.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.