A Study on the location of Compensation Capacitor and Capacitance in the Concrete Slab Track (콘크리트 슬래브궤도에서 보상 커패시터의 위치 및 전기용량에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Ko, Jun-Seog;Lee, Jong-Woo;Jo, Su-Ik;Yu, Jin-Young
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.879-891
    • /
    • 2009
  • Impedance of rails is increased by the magnetic coupling between rails and reinforcing bars in the concrete slab track. Currently, the current of track circuit has been compensated by installing the compensation capacitors on track circuit because of increasing the impedance of rails. In case of a rapid transit railway, the compensation capacitors are installed every 20[m] to compensate the current of track circuit in the concrete slab track. Because the interval of one block for a rapid transit railway is as long as 1500[m], the compensation capacitors are installed about the number of 70$\sim$75 on track circuit. However, in case the compensation capacitors are broken over the number of three, it is a problem that the amplitude of current is under standard amplitude of current which is 0.8[A]. In this paper, it was suggested installing a compensation capacitor by using resonance phenomenon on the concrete slab track. We represent the electrical model of track circuit and the four terminal network, calculate the parameters demanded for the electrical model in the concrete slab track. Also, we computed the position and capacitance of the compensation capacitor about 2040[Hz], 2400[Hz], 2760[Hz], 3120[Hz] which currently is the track circuit frequency in the Gyeongbu rapid transit railway and demonstrated the validity of it, using the Matlab and PSpice program.

  • PDF

A Study on the Criteria of Settlement in Concrete Slabtrack (토노반상 콘크리트궤도의 노반허용침하기준설정에 관한 연구)

  • Hong, Chul-Kee;Yang, Shin-Chu;Kim, Yun-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.355-364
    • /
    • 2007
  • Recently a concrete slab tracks are being constructed on roadbed in the Gyoeng-bu 2nd phase high speed railways. In respdnding to this trend, new design standards and track materials maintenance systems, based on the slab track material safety and usage perspective, are needed. This research provides a roadbed design criteria and the maintenance system. The proposed roadbed design criteria and the maintenance system are based on the developed analysis meathod of train/slab-track interaction. where the roadbed settlement and train speed are utilized as mediating variables. In the analysis, the dynamic response of train/slab-track interaction apply to various speeds and settlements. the roadbed settlement is shown in a sinusoidal shape of wave, the scope of the settlement occurrence presented in its wavelengths, include 6meters, 10meters, 15merwes, 20meters, 30meters. The train speeds involved are 50, 100, 150, 200, 250, 300, 350, 400kilometers per hour.

Correlation Analysis between Crack and TQI in RC Slab Track

  • Kwon, Se-Kon;Park, Mi-Yun;Kim, Doo-Kie;Sho, Byung-Choon;Park, Jae-Hak
    • International Journal of Railway
    • /
    • v.7 no.1
    • /
    • pp.8-15
    • /
    • 2014
  • Recently, in the total railroad construction field, concrete slab tracks have been adapted in place of ballast tracks. Because ballast tracks need frequent maintenance and are difficult to handle due to increasing maintenance costs, eventually concrete slab tracks were selected as an alternative. However, owing to the hydration heat reactions and temperature-affected shrinkage of the concrete, a variety of studies to solve maintenance problems related to concrete slab tracks are underway. This study analyzed characteristics of TQI values evaluating track irregularity, investigated the relationship between crack progress and TQI, and then evaluated the correlation between the two values. Through our analysis, we found that there is a need to supplement the problems of the current method and develop a track evaluation index which takes cracking into account. We also concluded that TQI is the main decision-making tool in track maintenance.

A Method for the Analysis of Train/Slab-Track Interaction on Settled Roadbed (슬래브궤도 노반침하구간 차량/궤도 상호작용 해석기법 개발)

  • Yang, Sin-Chu;Hong, Chul-Kee
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.296-305
    • /
    • 2007
  • A numerical method for the analysis of train/slab-track interaction on the settled roadbed is developed based on the already developed analysis method of train/ballast-track interaction. The concrete slabs composed of the upper track concrete layer and the lower hydraulic bonded layer are modelled by a equivalent beam. The supporting stiffness of roadbed is evaluated with the modified boussinesq method suggested by Eisenmann. The track irregularity and the gap between slab and roadbed induced by settlement of roadbed are calculated by the effective method newly presented in this study. The validation of the developed method is investigated by a numerical example. The effects of train speed on train and slab track on the settled roadbed with sinusoidal shape of wave length 20m and amplitude 20mm are reviewed.

Experimental Investigation on Fatigue Behavior of Concrete Slab Tracks under Railway Loads (철도하중에 대한 콘크리트 슬래브궤도의 피로거동에 관한 실험적 연구)

  • 강보순
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.639-642
    • /
    • 2003
  • In this paper, fatigue behavior of concrete slab tracks under railway loads by experimental method is discussed. The addition of steel fibers to concrete mix has been receiving more attention as a way of improving the crack behavior of concrete beams an slabs tacks. This study two objectives: 1) to observe the fatigue behavior of fiber reinforced concrete slab in labor, and 2) to present crack propagation and deflection of fiber reinforced concrete slab track under railway loads in the Waghauser test line. Nine beams, two slabs and one test track were experimentally tested.

  • PDF

The Performance Evaluation of Newly Developed Concrete Slab Track (개발형 콘크리트 슬래브궤도의 성능평가)

  • Kang Yun Suk;Kim Eun;Lee Il Hwa;Yang Sin Chu
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.151-156
    • /
    • 2003
  • The purpose of this study is to establish the test procedure of concrete slab track and to estimate the performance of newly developed slab track. The basic direction of conceptual design of KRRI Slab track was determined in the viewpoint of running safety, economic efficiency and maintenance costs. Based on the research results, a detailed conceptual design of KRRI slab track is suggested. For the systematic development of slab track, a comparative study is carried out, comparing merits and demerits of each slab type, and used in the design process of slab track. Slab track tests were performed at lab and the slab track system was improved by the experiment result. Site Test also were performed in test slab track.

  • PDF

The Displacement Limit at the End of an Approach Slab for a Railway Bridge with Ballastless Track (콘크리트궤도 부설 교량의 접속슬래브 단부 처짐한도에 관한 연구)

  • Choi, Jin-Yu;Yang, Shin-Chu
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.2
    • /
    • pp.195-202
    • /
    • 2008
  • The transition area between a bridge and an earthwork is one of the weakest area of track because of the track geometry deterioration caused unequal settlement of backfill of abutment. In case of a ballastless track, the approach slab could be installed to prevent such a phenomenon. But, if there is occurred the inclined displacement on the approach slab by a settlement of the foundation or formation, the track is also under the inclined displacement. And this defect causes reducing the running stability of a vehicle, the riding comfort of passengers, and increasing the track deteriorations by excessive impact force acting on the track. In this study, parametric studies were performed to investigate the displacement limit on the approach slab to avoid such problems. The length and the amount of unequal settlement of approach slab were adopted as parameter for numerical analysis considering vehicle-track interaction. Car body accelerations, variations of wheel force, stresses in rail, and uplift forces induced on fastener clip were investigated. From the result, resonable settlement limit on the end of an approach slab according to slab length was suggested.

Design of Korean Precast Slab Track (한국형 프리캐스트 슬래브 궤도 설계)

  • Zi, Goang-Seup;Lee, Seung-Jung;Jang, Seung-Yup
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1423-1429
    • /
    • 2010
  • We proposed a design procedure for Korean Precast Slab Track system. Korean Precast Slab Track system cannot use the same design procedure to German slab track system because of different shapes and some problems. We identified the problems of German slab track design system that cannot simulate effects of loads. This proposed procedure is implemented for the commercial software of ABAQUS. Using this procedure, one can consider uncombined effects between slab panel and hydraulic sub base, effect of close sleepers.

  • PDF

Experimental Study on the Evaluation of Behavior for Floating Track System Using a Resilient Rubber Mat (고무방진매트가 적용된 플로팅궤도시스템의 거동분석을 위한 실험적 연구)

  • Lee, Siyong;Jeong, Incheol;Choi, Jungyoul;Park, Yonggul
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.4
    • /
    • pp.281-288
    • /
    • 2014
  • The objective of this study was to estimate the vibration reduction capacities of a floating track system using a resilient rubber mat, and to compare the results with the track support stiffness and track impact factor of a conventional slab track system by performing field tests using actual vehicles running along a service line. The theoretically designed track support stiffness and track impact factor were compared with the measured track support stiffness and track impact factor for each tested track. The calculated and measured track support stiffness of the floating track system were found to be similar, and the floating track system satisfied the design specifications of the track impact factor. The overall vibration level and track support stiffness of the floating track system were thereupon found to be significantly lower than those of the conventional slab track system. The experimental results thus showed that the vibration reduction effect of the floating track system is greater than that of the conventional slab track.

Construction and Development of Turnout on concrete roadbed applicable to high speed railway (고속철도 적용을 위한 콘크리트 도상 분기기 개발 및 부설)

  • Park, Choon-Bok;Kwon, Ho-Jin;Jeon, Se-Gon;Yoon, Byung-Hyun;Oh, Soo-Jin;Choi, Yong-Seok
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1223-1228
    • /
    • 2007
  • Since KHSL 2nd phase was adapted as a main track design, the interests of concrete slab track system have been gradually increased in the division of rail track engineering and many engineering companies have been trying to adapt a concrete slab track system at this moment. Advantages of this system proved in advanced country, japan and Germany etc. are excellent maintenance, track stability and increasing of buckling resistance This developed turnout is same with the KHSR 1st phase's design and applications rules, components and signaling system since it observes KTX specification. Comparing it with the former turnout, High-elasticity pad, lubrication-free roller slide plate and Rheda2000 PC sleeper are only different. The purpose of this study is the development of high speed turnout on concrete slab track and its application on site. Now these studies are going to show the verification and confidence about the interface between ballast-track and concrete slab track by finding and solving the possible problems when it is installed on site and to make these turnouts applied perfectly and completely on concrete slab track. Its first trial construction in korea had been successfully completed at Sangju-station on July 20th ,2007 thanks to KORAIL and KR. Hereunder Sampyo E&C trys to introduce all of turnout technologies on concrete slab track system with Rheda 2000 sleeper

  • PDF