• 제목/요약/키워드: railway slab track

검색결과 195건 처리시간 0.041초

Study on vibration energy characteristics of vehicle-track-viaduct coupling system considering partial contact loss beneath track slab

  • Liu, Linya;Zuo, Zhiyuan;Zhou, Qinyue;Qin, Jialiang;Liu, Quanmin
    • Structural Engineering and Mechanics
    • /
    • 제75권4호
    • /
    • pp.497-506
    • /
    • 2020
  • CA mortar layer disengagement will give rise to the overall structural changes of the track and variation in the vibration form of the ballastless track. By establishing a vehicle-track-viaduct coupling analysis and calculation model, it is possible to analyze the CRTS-I type track structure vibration response while the track slab is disengaging with the power flow evaluation method, to compare the two disengaging types, namely partial contact loss at one edge beneath track slab and partial contact loss at midpoint beneath track slab. It can also study how the length of disengaging influences the track structures vibration power. It is showed that when the partial contact loss beneath track slab, and the relative vibration energy level between the rail and the track slab increases significantly within [10, 200]Hz with the same disengaging length, the partial contact loss at one edge beneath track slab has more prominent influence on the vibration power than the partial contact loss at midpoint beneath track slab. With the increase of disengaging length, the relative vibration energy level of the track slab grows sharply, but it will change significantly when it reaches 1.56 m. Little effect will be caused by the relative vibration energy level of the viaduct. The partial contact loss beneath the track slab will cause more power distribution and transmission between the trail and track slab, and will then affect the service life of the rail and track slab.

서울메트로 $1\sim4$호선 고가역(창동역) 고체소음 저감 사례 (The Reduction of Structure-borne Noise in an Elevated Station(Changdong Station) of Seoul Metro Line No. $1\sim4$)

  • 공선용;오희완;김상진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.438-443
    • /
    • 2007
  • In the recent railway construction, the concrete slab track is highlighted as the maintenance-free track and the main stream is moving from ballasted track to concrete slab track. However, in spite of many merits of concrete slab track, the higher noise generated from the concrete slab track is a troublesome question to solve and, by this reason, many studies on noise reduction of concrete slab track are carried out. The railway noise can be classified into the reflection noise emitted from wheel/rail contact and the structure-borne noise transmitted through railway structures. In this presentation, we would like to introduce an example of the successful reduction of structure-borne noise at track retrofitting to maintenance-free concrete slab track in elevated Changdong Station which was built with ballasted track on Rahmen structure.

  • PDF

고속철도 슬래브궤도개발 (Development of HSR slab track)

  • 강윤석;노혁천;양신추;이진욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.303-310
    • /
    • 2000
  • In this study the basic direction of conceptual design of new HSR(High Speed Railway) slab track was determined in the viewpoint of running safety, economic efficiency and maintenance costs. Based on the research results, a detailed conceptual design of HRS slab track is suggested. For the systematic development of slab track, a comparative study is carried out, comparing merits and demerits of each slab type, and used in the design process of slab track. To compensate the demerits of high cost in slab track construction, a program for determination of efficient slab section is coded and applied.

  • PDF

대구-부산간 고속철도 신설선에 대한 슬래브 궤도구조의 도입 타당성에 관한 연구 (A feasibility study on adoption of slab track for the new high speed rail way line between Daegu and Pusan)

  • 김해곤;양근율;김광모
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.27-34
    • /
    • 2003
  • This Study is about adoption of slab track on the new high speed railway line between Daegu and Busan. While ballast track currently used is easy to construct with low investment, the error margin of rail track occurs in the track due to the repetition load of the train. Therefore, repairs should be carried out all the time to put the railway track at the repair level or less. In addition, noise caused by such repairs has become a new social problem at night. Construction costs for slab track are about 1.3-1.5 times higher than those for ballast track. However, slab track will save labor costs by solving various problems of ballast track. In this regard, it is feasible to adopt slab track on the new high speed railway line between Daegu and Busan.

  • PDF

콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구 (The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track)

  • 성덕룡;김영하;박용걸;김성일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

새로운 슬래브궤도 시스템 (A New Slab Track System)

  • 강보순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

독일 고속철도 슬래브궤도의 고찰 (An Investigation on German High Speed Railway Slab Track)

  • 강보순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2001년도 추계학술대회 논문집
    • /
    • pp.508-513
    • /
    • 2001
  • State of the German high speed railway slab track were investigated. The Permanent Way consisting of rails and sleepers laid on ballast is a technically and economically viable solution. After two decades of targeted research and development activities Slab Track turned out to be a reasonable option on special fields.

  • PDF

플로팅궤도 연결부의 하중전달효율 산정을 위한 수치해석 (Numerical Study on Load Transfer Efficiency of Floating Slab Track)

  • 정원석;장훈;박성재;박명균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1287-1292
    • /
    • 2010
  • Recently, many railway stations are built under the railway line in urban area. The passage of railway vehicles generates mechanical vibrations of a wide range of frequency. Thus, it is required to place structural vibration isolation systems to reduce vibration and noise originating from surrounding environments. This study utilizes elastometric bearings as a vibration isolation system. The slab track system on elastometric bearings is called "low vibration track" or "floating slab track." In this low vibration track system, dowel bars or plates can be installed to minimize the discontinuity of displacement between adjacent floating slab tracks. This study is to numerically investigate the effects of dowel members on static behavior of the low vibration track. The study involves two steel dowel systems including dowel bars and dowel plates. Each dowel system is analyzed under the service load condition to assess load transfer efficiency (LTE).

  • PDF

Influence of Slab Length on behavior of Floating Slab Track by Rail-slab-isolator Longitudinal Interaction

  • Nguyen, Huan Ha;Jang, Seung Yup;Chung, Wonseok
    • International Journal of Railway
    • /
    • 제5권4호
    • /
    • pp.163-166
    • /
    • 2012
  • Many different types of floating slab track have been developed and installed around the world to reduce vibrations and noise originating in the surrounding environment. The main objective of this study is to examine the influence of slab length on behavior of floating slab track based on rail-slab-isolator interaction. The floating slab track is modeled by the connection between rail, slab, isolator, and slab mat in the transition zone. All elements were assembled in a simplified two-dimensional (2D) finite element model (FEM). The maximum length of FST is then investigated based on the maximum additional rail stress criterion as described in UIC 774-3R since no fully accepted design criteria for the slab length in FST systems currently exist.

콘크리트슬래브궤도 체결장치의 패드강성에 따른 궤도/교량의 거동 분석 (The Behaviour of Track/Railway Bridge according to Pad Stiffness of Fastener System on Concrete Slab Track)

  • 이준호;성덕룡;박용걸;김성일
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1628-1636
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. But elastic pad becomes superannuated due to repeated train operation. After all, it brings change of pad stiffness and it could directly act on track and bridge as load transmission and impact force. In this study, we carried out laboratory test changing pad stiffness after making a model of 15m bridge and laying concrete slab track. Also, we carried out static and dynamic behaviors test(stress, natural frequency, damping ratio, vibrational acceleration, deflection) of bridge and track and experimentally analyzed them by change of elastic pad stiffness on rail fastener.

  • PDF