• Title/Summary/Keyword: railway embankment

Search Result 97, Processing Time 0.032 seconds

Analysis of the Behavior of Concrete Track on Earthwork Considering the Increase in Train Speed (열차속도 증가를 고려한 토공상 콘크리트궤도의 거동 분석)

  • Kim, Jeong-Il;Ahn, Suk-Jun;Kwon, Jong-Wook;Kim, Jin-Il
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3214-3219
    • /
    • 2011
  • HONAM High Speed Railway project is under construction with the target to have 350km/h design speed from Songjeong Gwangju City to Osong. The track for the whole section of the line is scheduled to be a concrete track in order to decrease total life cycle cost (LCC) according to the decrease of track destruction. However, the study on the related parts to increase the train speed up to 400km/h is on going in order to strength the competitiveness of high speed railway. On this study, the stress of track has been analyzed according to the concrete track design method of Eisenmann using equivalent depth theory proposed by Odemark for behavior analysis of concrete track on track bed, which is having embankment deformation characteristics by train load. The behavior analysis of track is performed to analyze the stress of track bed layer and track according to the variation of design load and train speed. And also, the characteristics of concrete track have been figured out by analyzing the parameter according to the thickness of track bed layer.

  • PDF

Long-term Settlement Prediction of Railway Concrete Track Based on Recurrent Neural Network (RNN) (순환신경망을 활용한 콘크리트궤도의 장기 침하 거동 예측)

  • Kim, Joonyoung;Lee, Su-Hyung;Choi, Yeong-Tae;Woo, Sang Inn
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.3
    • /
    • pp.5-14
    • /
    • 2020
  • The railway concrete track has been increasingly adopted for high-speed train such as KTX due to its high running stability, improved ride quality for the passengers, and low maintenance cost. However, excessive settlement of the railway concrete track has been monitored at embankment sections of the ◯◯ High-speed Line, resulting in the concerns on the safety of railway operation. In order to establish an effective maintenance plan for the concrete track railway exceeding the allowable residual settlement, it is essential to reasonably predict their long-term settlement behavior during the public period. In this study, we developed a model for predicting the long-term settlement behavior of concrete track using recurrent neural network (RNN) and examined the applicability of the developed model.

Performance Test of Large Scale Embankment made with Bottom Ash and Tire Shred (저회-폐타이어 재생혼합토의 실대형 성토구조물 성능 시험)

  • Lee, Sung-Jin;Shin, Min-Ho;Hwang, Seon-Keun;Koh, Tae-Hoon;Lee, Yong-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1756-1767
    • /
    • 2008
  • Recently, a global trend has been established to facilitate the use of waste materials in geotechnical engineering applications. In Korea, where there is the need to save natural resources as these may become scare in the near future and to prevent excessive ground excavation for natural aggregates. The annual production of scrap tire and bottom ash has sharply increased in recent years. Therefore, it will be good waste resource recycling, if we can utilize the above wastes as fill materials in soft ground. In this study, based on the proven feasibility of bottom ash and tire shred-soil mixtures as lightweight fill materials, tire shred-bottom ash mixtures were suggested as a new lightweight fill material to replace the conventional construction material(soil) with bottom ash. Therefore, the main objective of this research is to investigate the feasibility of tire shred-bottom ash mixtures in order to estimate their suitability for the use of lightweight fill materials. So we carried out the performance tests of 2 large scale embankment which were made with tire shred-bottom ash mixture and the conventional fill material(weathered soil) respectively.

  • PDF

Dynamic Behavior Evaluation of Pile-Supported Slab Track System by Centrifuge Model Test (원심모형 실험을 통한 궤도지지말뚝구조의 동적 거동 평가)

  • Yoo, Mintaek;Lee, Myungjae;Baek, Mincheol;Choo, Yun-Wook;Lee, Il-Wha
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.2
    • /
    • pp.5-17
    • /
    • 2019
  • Dynamic centrifuge model test was conducted to evaluate the dynamic stability of the pile-supported slab track method during dynamic railway loading and earthquake loading. The centrifuge tests were carried out for various condition of embankment height and soft ground depth. Based on test results, we found that the bending moment was increased with embankment height and decreased with soft ground depth. In addition, it was confirmed that the pile-supported slab track system could have dynamic stability for short-period seismic loading. However, in case of long-period seismic loading, such as Hachinohe earthquake, the observed maximum bending moment reached to pile cracking moment at the return period of 2,400 year earthquake. The criterion of ratio between embankment height and soft ground depth was suggested for dynamic stability of pile-supported slab track system.

A Study on Reliquefaction Behavior of Railway Embankment Using 1g Shaking Table Test (1g 진동대 실험을 이용한 철도 제방의 재액상화 거동 연구)

  • Chae, Minhwan;Yoo, Mintaek;Lee, Il-Wha;Lee, Myungjae
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.11
    • /
    • pp.71-81
    • /
    • 2021
  • The purpose of this study is liquefaction phenomenon was simulated using the 1g shaking table test. Analysis of liquefaction and Re-liquefaction behavior according to the ground conditions was analyzed when an embankment exists above the ground. The soil used in the experiment was silica sand and the ground composition was a liquefied layer of 50cm (Case 1), a non-liquefied layer of 17.5cm and a liquefied layer of 32.5cm (Case 2). The embankment was formed by fixing the height of 10cm and the slope of the slope at a ratio of 1:1.8. For seismic waves, excitation of a 5Hz sine wave was performed for 8 seconds, and a total of 5 case excitations were performed. In Case 1, it was confirmed that liquefaction occurred at all depths during the first vibration excitation at the free-field and that liquefaction did not occur at all depths except 5cm at the third vibration excitation. At the center of the embankment, liquefaction occurred up to a depth of 20cm during the first vibration excitation, and it was confirmed that liquefaction did not occur at all depths except for a depth of 5cm during the second vibration excitation.

Experimental Evaluation of the Moment Capacity of a Railway Electric Pole Foundation Adjacent to a Fill Slope (실물 재하시험을 통한 성토사면에 근접한 철도 전철주기초의 저항모멘트 평가)

  • Lee, Su-Hyung;Lee, Sung-Jin;Lee, Il-Wha
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.6
    • /
    • pp.5-17
    • /
    • 2012
  • The moment responses of electric pole foundations for a railway were investigated using real-scale load tests. Large overturning moments were applied to two circular rigid piles with a 0.75 m diameter and a 2.5 m embedded depth; the circular rigid piles were installed in an actual railway embankment fill. Two different loading directions-toward the fill slope and toward the track -were applied to evaluate the influence of the fill slope on the moment capacities of the foundations. It was found that the failure of the foundations that were constructed according to Korean railway practices exhibited a sudden overturning pattern without any significant pre-failure displacement. The moment capacity toward the fill slope was less than the moment capacity toward the track by 30%. From the test results, the geometry factor (K), which accounted for the reduction of the moment capacity, due to the fill slope, was 0.7. Moment capacities determined from the load tests were compared with those predicted from three existing design methods, and their applicability was discussed.

Study on the transient flow induced by the windbreak transition regions in a railway subject to crosswinds

  • Zheng-Wei, Chen;Syeda Anam, Hashmi;Tang-Hong, Liu;Wen-Hui, Li;Zhuang, Sun;Dong-Run, Liu;Hassan, Hemida;Hong-Kang, Liu
    • Wind and Structures
    • /
    • v.35 no.5
    • /
    • pp.309-322
    • /
    • 2022
  • Due to the complex terrain around high-speed railways, the windbreaks were established along different landforms, resulting in irregular windbreak transition regions between different subgrade infrastructures (flat ground, cutting, embankment, etc). In this paper, the effect of a windbreak transition on the wind flow around railways subjected to crosswinds was studied. Wind tunnel testing was conducted to study the wind speed change around a windbreak transition on flat ground with a uniform wind speed inflow, and the collected data were used to validate a numerical simulation based on a detached eddy simulation method. The validated numerical method was then used to investigate the effect of the windbreak transition from the flat ground to cutting (the "cutting" is a railway subgrade type formed by digging down from the original ground) for three different wind incidence angles of 90°, 75°, and 105°. The deterioration mechanism of the flow fields and the reasons behind the occurrence of the peak wind velocities were explained in detail. The results showed that for the windbreak transition on flat ground, the impact was small. For the transition from the flat ground to the cutting, the influence was relatively large. The significant increase in the wind speeds was due to the right-angle structure of the windbreak transition, which resulted in sudden changes of the wind velocity as well as the direction. In addition, the height mismatch in the transition region worsened the protective effect of a typical windbreak.

Parametric Analysis for Up-lifting force on Slab track of Bridge under Train Load (열차하중 재하시 교량상slab궤도의 상향력 민감도분석)

  • Choi, Sung-Ki;Park, Dae-Geun;Han, Sang-Yun;Kang, Young-Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.279-282
    • /
    • 2008
  • The vertical forces in rail fasteners at areas of bridge transitions near the embankment and on the pier will occur due to different deformations of adjoining bridges caused by the trainloads. The up-lifting forces is not large problem in the blast track because the elasticity of blast and rail pad buffs up-lifting effect. But, it is likely to be difficult to ensure the serviceability of the railway and the safety of the fastener in the end in that concrete slab track consist of rail, fastener, and track in a single body, delivering directly the up-lifting force to the fastener if the deck is bended because of the end rotation of the overhang due to the vertical load. When the up-lifting force exceeds the clamp force of the fastener clip, the rail pad is out of fastener, which makes decrease the serviceability of the railway, such as noise and vibration. Furthermore, it is possible to reduce the safety of the track as the longitudinal resistance. This study is focused on guideline suggestion to decrease up-lifting force in the fastener adjacent to the civil joint of slab track of bridge throughout the parametric analysis between the vertical spring stiffness of the fastener as the material approach, the space of fastener adjacent to bridge transition, the rigidity of the girder as the geometrical approach and up-lifting force under the train load.

  • PDF

Wetting-Induced Collapse in Fill Materials for Concrete Slab Track of High Speed Railway (고속철도 콘크리트궤도 흙쌓기재료의 Wetting Collapse에 관한 연구)

  • Lee, Sung-Jin;Lee, Il-Wha;Im, Eun-Sang;Shin, Dong-Hoon;Cho, Sung-Eun
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.4
    • /
    • pp.79-88
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in bout 400 km section in 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350 km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. In spite of little study for this wetting collapse problem, it has been recognized that the compressibility of compacted sands, gravels and rockfills exhibit low compressibility at low pressures, but there can be significant compression at high pressures due to grain crushing (Marachi et al. 1969, Nobari and Duncan 1972, Noorany et al. 1994, Houston et al. 1993, Wu 2004). The characteristics of compression of fill materials depend on a number of factors such as soil/rock type, as-compacted moisture, density, stress level and wetting condition. Because of the complexity of these factors, it is not easy to predict quantitatively the amount of compression without extensive tests. Therefore, in this research I carried out the wetting collapse tests, focusing on various soil/rock type, stress levels, wetting condition more closely.

A Study on the Behavior during Constructing of Rigid Reinforced Roadbed to apply for the Slab Track (콘크리트궤도용 강성보강노반의 시공 중 거동에 관한 연구)

  • Kim, Ki-Hwan;Kim, Dae-Sang;Park, Seong-Yong;Park, Jong-Sik;Yoo, Chung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1774-1785
    • /
    • 2011
  • In this paper, Rigid Reinforced Roadbed(RRR) which is expected to have highly applicability to railroad roadbed, was introduced and field tests results were analyzed. Full scale model with 5m height concerning a single track railroad roadbed was constructed. The model had four different sections, which was to assess the effect of geogrid length, spacing, and connection method on deformation characteristics of RRR. Laser displacement meter, earth pressure cell, piezometer, and strain gauge were installed in order to analyze the behavior of reinforced embankment during construction. Horizontal displacements caused by compaction at each section were 20~30% below the displacement limit that of general reinforced retaining wall, which showed that RRR was very stable structure. Maximum tensile strength of reinforcement was withing 10% of the long-term design strength.

  • PDF