• Title/Summary/Keyword: railway construction

Search Result 1,416, Processing Time 0.031 seconds

Deductions of KPIs for BSC and Process KPIs for BPM in Railway Construction (철도건설에서 BSC의 KPI도출과 BPM을 위한 프로세스 KPI도출)

  • Ryu Si-Wook;Ahn Byung-Jun;Ryu Myung-Wook
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.4 s.35
    • /
    • pp.388-393
    • /
    • 2006
  • Recently, Korean government demands that public sectors like railway construction should improve their management efficiency. It is necessary for railway construction supported by government budget to aim at the companywide management efficiency. The Balanced Scorecard (BSC) is known as integrated performance management framework that helps a company to translate strategic objective info relevant performance within an organization. This paper focuses on relationship between KPIs (Key Performance Indicators) used to measure the performance of railway construction industry and process KPT for BPM (Business Process Management). Also, the vision and strategies of the railway construction is introduced, and the CSFs (Critical Success Factors) and the KPI based on BSC is developed. Finally, this paper explores that there is a possibility to fulfill the strategic objectives of railway construction industry through the connectivity between KPI based on BSC and process KPI based on BPM. We explain the detailed procedures with an example of railway construction industry.

A Study on the Cost-Benefit Analysis for the Construction Method of Underground Railway Crossing (철도지하횡단공사 공법의 비용.편익 분석에 관한 연구)

  • Seok, Chong-Chen;Shin, Min-Ho;Eum, Ky-Yong;Kim, Mu-Il
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.407-413
    • /
    • 2006
  • Railways are very important to get stability of railway structure as transportation system carrying a lot of passengers and freight. These days the construction of underground railway crossing such as expansion of new roads, construction of subway and gas pipe is increasing because of economic and social development. But these kinds of construction didn't take into account Cost-benefit analysis of railway which has the most important aspects of railway safety, so the results of construction didn't get a good evaluation. This study adapt Cost-benefit analysis to evaluate the economic validity of underground railway crossing. This study adjust about Cost-benefit analysis of railway part, and analyze the new method and technology of underground railway crossing constructed by Korean National Railroad and Railway Network Authority. Also this study divide between high frequency line and low frequency lineusing B/C, NPV, and IRR analysis. After analysis, B/C ratio method is the most suitable method among B/C, NPV, and IRR analysis method. Therefore this study can express economic benefit quantitatively and decrease the cost by adapting Cost-benefit analysis, and can clearly express the construction feasibility and investment effects of construction of underground railway crossing method.

  • PDF

A Study on Criteria for investment Priority of Railway Project (철도건설 투자우선순위에 관한 연구)

  • Park, Il-Ha;Park, Yong-Gul;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.112-116
    • /
    • 2008
  • Determining the investment priority of the railway project is essential to keep its object of railway investment. [National railway construction plan] provide 4 major evaluation indicators and their weighting range in determining the investment priority of railway construction. Which are investment efficiency, inter-regional balance of development, network effects, government supporting policy. However this present criteria has inconsistency in determining economical feasibility of the railway transportation when applying the same evaluation indicator, investment efficiency, with the road transportation. The railway transportation is superior to road transportation in terms of transportation capacity and distance, while offering less carbon emissions. In spite of the prominent position of the railway transportation, it can be failed to obtain its proper investment priority when being determined under economical feasibility based. Therefore, this study analyzed the inconsistency under present evaluation criteria and proposed new evaluation method for the investment priority of the railway construction using AHP(analytic hierarchy process), while differentiate from the road construction. This method is optimized for only determining the priority of the railway construction itself under object of railway investment respectively.

  • PDF

A Study on Railway Construction System Rationalization - focusing on railway construction in metropolitan area - (철도건설체계의 합리화방안연구 - 대도시지역의 철도건설을 중심으로 -)

  • 이용상
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.387-395
    • /
    • 2002
  • As a result of an increase in population of the Metropolitan area and a steady change of circumstances in many parts, the city is sprawling out into the suburbs. This phenomenon causes the necessity of modification of present urban plan. It is risen as a point of issue that construction systems of new railway routes and underground construction, which should be followed the new urban plan in case of inter-regional railway and regional railway. It is hard to find sufficient financial resources, nevertheless the railway improvement definitely affects regional development and improvement of social environment. Also, there is a limit to government subsidies. In this respect, it is necessary to set up a new idea about movement of existing railway routes and improvement of the equipment. This study examines the present problems of railroad construction system in urban downtown area and introduces a suitable institutional way through referring to the instances of other countries.

  • PDF

Comparative Analysis on the Railway Construction Criteria with Regard to the Trans-Korea Railway Project and the Railway Modernization of DPRK (남북철도 현대화를 위한 남북한 철도건설기준 비교 분석)

  • Kim, Sang-Gyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.1011-1017
    • /
    • 2009
  • In pursuit of the Trans-Korea Railway (TKR) project connecting the Korean peninsular by a rail link, it is critical that the two railway systems in ROK and DPRK are comparable in criteria and standards. Yet, there is substantial divergence of the construction criteria between the two sides, which hinders from conducting the TKR project as well as the railway modernization of DPRK. In this regard, study and comparison of the criteria are a prerequisite for mitigating the hinderance. This study investigated the laws and regulations relating to the railway technologies and construction and in particular conducted a comparative analysis of both railway systems with a focus on railway facilities such as track, structures, electric power and signaling. The results of this study will provide a useful information for the improvement of existing lines and the construction of new lines in DPRK.

Development and Application of Integrated Settlement Management System for Construction and Maintenance of Concrete Railway (콘크리트 궤도의 시공 및 유지관리를 위한 침하관리 통합 시스템의 구축 및 활용)

  • Woo, Sang-Inn;Chun, Sung-Ho;Chung, Choong-Ki;Lee, Il-Hwa;Kwon, Oh-Jung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1196-1202
    • /
    • 2007
  • In construction of high speed railway, the fan shape is limited to achieve reduction of required travel time and concrete railway which has structural stability and induces small maintenance cost with allowable ground settlement is recently applied. So construction of concrete railway on soft ground in which considerable ground settlement occurs increases and settlement management in soft ground section is required. Field monitoring on ground movement and integrated geotechnical information system which manages construction, design, and field monitoring data are essential for settlement management of concrete railway subgrade. Site investigation data are also required due to future repair work. Therefore in this study, integrated geotechnical information system for construction and maintenance of concrete railway is developed. The developed system consists of a database and an application program. The database contains site investigation, construction, design, and field monitoring data throughout a railway. Application program performs various functions on managing and utilizing information in the database with graphic visualization of output. And by providing integrating information with comprehensible visual displays, the applicability and effectiveness of the developed system for construction and maintenance management were confirmed.

  • PDF

A Study on the Maintenance CALS System Construction for the Urban Transit Railway (도시철도 유지보수체계 정보화 시스템 구축에 관한 연구)

  • 박기준;안태기;이호용;한석윤
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.922-928
    • /
    • 2002
  • This paper is about the maintenance CALS system development and construction for the urban transit railway. The operation companies of urban transit railway are driving to construct the maintenance CALS system individually. So, there are concerned problems of duplication investment and waste of budget in the national aspect, inefficient CALS system construction, and etc. In order to resolve that, the KRRI is driving to development and construction of the standardized maintenance CALS system for the urban transit railway. This paper describes the result of basic design of the standardized maintenance CALS system using the CBD development method.

  • PDF

Precast Full Span Construction of Continuous PSC Box Girder Bridge for High Speed Railway (고속철도 PSC 박스거더 연속고의 프리캐스트 경간 일괄 가설)

  • Park Jeong Wha;Kim Kwang Soo;Sim Chungwook;Yoon Chul-Soo
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1168-1173
    • /
    • 2004
  • Bridges and tunnels mainly compose the structural system of Kyung-bu high-speed railway in Korea and the prestressed concrete box girder bridges are applied for the most part of bridge structures. Precast full span construction method was practiced in the construction of many prestressed concrete box girder bridges in Kyung-bu high speed railway for the high quality, great construction speed, low construction cost and construction safety. However, there have been no application of this method in continuous bridges until now. Therefore, a new advanced precast full span construction method is developed using pre-tensioning for precast and post-tensioning in alternating the simple span into a continuous bridge system. since the high-speed railway trains can cause dynamic problems in a continuous bridge. This study shows the structural behavior and the construction process of the new advance method.

  • PDF

Construction of Continuous Bridges in Hi8h-Speed Railway using Precast Span Method (프리캐스트 스팬 공법을 적용한 고속철도 연속교 시공)

  • 김성일;김성호;이원표;윤철수
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.401-407
    • /
    • 2001
  • Out of 412km long Kyung-bu high-speed railway, 302km was designed in tile form of either bridges or tunnels. Most of bridges were designed to be prestressed concrete box girder type. The precast span method was selected because of good quality of bridge section secured by factory manufacturing, fast construction speed, low construction cost with mechanized construction and the safety fur field workers. The precast span method has been mainly utilized in bridges consisted of repeated simple spans. However, we applied the precast span method to continuous bridge for high-speed railway Since it was the first attempt to apply ate precast span method to a continuous bridge for high-speed railway, many design and construction details were studied and implemented in the construction. Design and construction processes of a continuous bridge construction using tile precast span mettled are briefly described in this paper.

  • PDF

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF