• Title/Summary/Keyword: railway ballast

Search Result 282, Processing Time 0.032 seconds

Three Dimensional Buckling Analysis of Continuous Welded Rail Track Under Thermal Load (온도하중을 고려한 장대레일 궤도의 3차원 좌굴 거동)

  • 강준석;임남형;양신추;강영종
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.471-478
    • /
    • 2000
  • For many decades, the railway was constructed using tracks with jointed rails of relatively short lengths. The joints cause many drawbacks in the track and lead to signeficant maintenance cost. so, railroad engineers became interested in eliminating joints. Continuous welded rail(CWR) track has many advantages over the conventional jointed-rail track. but, in the case of the elimination of rail joints, it may cause the track to be suddenly buckled laterally by thermal loads. In this paper, firstly, 3-D CWR track model and CWRB program exactly considering the influence of tie are developed far linear static and buckling analysis using finite element method. Characteristics of CWR track model are using 7-dofs beam element as rail, Offset technic exactly considering centroid axies difference of track components(rail, rail-pad-fastener, tie), and Thermal gradient considering thermal difference of top flange and bottom flange in rail section.. second,, Through the static and linear buckling analysis by CWRB, Influences of various track components (rail, ballast, fastener, tie and so on..) on CWR track behavior and stability was characterized.

  • PDF

Damage Cause Analysis of Concrete Sleepers for Sharp Curved Track on Urban Railway Bridge (도시철도 교량상 급곡선 자갈궤도용 콘크리트침목 손상원인 분석)

  • Choi, Jung-Youl;Shin, Tae-Hyoung;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.3
    • /
    • pp.517-522
    • /
    • 2021
  • In this study, the causes of damage to the concrete sleepers in a ballast track with under sleeper pads attached to the base of the sleepers installed in the sharp curved track(R=180m) of the urban railway bridge were analyzed. The damage types of concrete sleepers were investigated, and the correlation with track irregularity was reviewed. Also, stress generated in the concrete sleeper was reviewed through structural analysis. As a result, most of the cracks of the sleepers occurred in the section with severe track irregularity. In addition, as a result of the analysis, the stress generated in the track components and the sleepers was found to be reduce in the fastening system using the 4-anchor.

Characteristics of Vibration of Track and Vehicle Body According to Type of Track in Tunnel of High-Speed Railway Lines (고속철도 터널에서의 궤도 형식에 따른 궤도와 차체의 진동 특성)

  • Kim, Man Cheol;Jang, Seung Yup
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.125-132
    • /
    • 2006
  • In the present study, in order to elucidate the vibration characteristics of track and train body according to the type of track in tunnel, the vibration accelerations of the track and the KTX train body have been measured in tunnels of Kyong-Bu high-speed railway(HSR) lines, and the frequency analysis of the measured data has been performed. From this, the vibration characteristics of the track components such as rail, sleeper, ballast and slab, the tunnel lining and the vehicle body according to the type of track are investigated and their relation is analyzed. The test results show that the vibration of rail and vehicle body rapidly increases at 80Hz in tunnel, and that is much higher in the tunnel on which the concrete slab track is placed. According to the results of the present study, rail supporting stiffness can variate the vibration characteristics of the total system including the vehicle, and therefore the correlation between the vibration of vehicle should be taken into account to determine the supporting stiffness of the slab track.

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

A Dynamic Analysis of PSC Box Bridge Varying Span Lengths for Increased Speeds of KTX (고속철 속도변화에 대한 PSC박스 교량의 경간길이 별 동적해석)

  • Oh, Soon Taek;Lee, Dong Jun;Shim, Young Woo;Yun, Jun Kwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.204-211
    • /
    • 2011
  • A dynamic analysis procedure is developed to provide a better estimation of the dynamic responses of bridge during the passage of high speed railway vehicles. Particularly, a three dimensional numerical model including the structural interaction between high speed vehicles, bridges and railway endures to analyse accurately and evaluate with in-depth parametric studies for dynamic responses of various bridge span lengths running KTX railway locomotive up to increasing maximum speed(450km/h). Three dimensional frame element is used to model the simply supported pre-stressed concrete (PSC) box bridges for four span lengths(40~25m). Track irregularity employed as a stationary random process from the given spectral density functions and irregularities of both sides of the track are assumed to have high correlation. The high-speed railway vehicle (KTX) is used as 38-degree of freedom system. Three displacements (Vertical, lateral, and longitudinal) as well as three rotational components (Pitching, rolling, and yawing) are considered in the 38-degree of freedom model. The dynamic amplification factors are evaluated by the developed procedure under various traveling conditions, such as track irregularity camber, train speed and ballast. The dynamic analysis such as Newmark-${\beta}$ and Runge-Kutta methods which are able to analyse considering the dynamic impact factors are compared and contrasted.

Prediction Method and Characteristics of Micro-pressure Wave on High-speed Railway Tunnel (고속선 터널미기압파 특성 및 예측기법 연구)

  • Yun, Su-Hwan;Nam, Seong-Won;Kim, Seok-Won
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.8-14
    • /
    • 2015
  • This paper describes a prediction method for micro-pressure wave emitted from a tunnel on the Kyung-bu high-speed railway. Pressure and micro-pressure wave were measured simultaneously to obtain some constants for the prediction method. The change of a micro-pressure wave were analyzed according to the speed of the train, the track bed type, and the distance from a tunnel portal. At a train speed of 300km/h, the micro-pressure wave of 4.0km long ballast track tunnel is about 7.5Pa; that of 3.3km long slab track tunnel is about 14.3Pa The strength of the micro-pressure wave decreases in inverse proportion to the distance and becomes about 0.5~1.0Pa at a point of 100m from the tunnel exit. Micro-pressure waves were predicted using the formula with the obtained the constants. Using a comparison between the predicted data and field measurement data, it was confirmed that micro-pressure wave can be predicted easily through the prediction formula.

A study on the lateral Earth Pressure and Stress Relaxation Region According to the Infinitesimal Deformation of the Wall and Backside Earth Built by Non-excavation Method Under Railroad (철도하부 비개착공법의 벽면배면토사의 미소변형에 따른 수평토압 및 응력이완영역에 관한 연구)

  • Park, Yoon-Sik;Lee, Jun-Seok;Cho, Kook-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2393-2399
    • /
    • 2011
  • In the case where the bottom of railroad is penetrated by non-excavation construction method, the design is performed based on the assumption that there is no displacement and no change of stress However, measurement data showed that reduction of earth pressure and relaxation of stress take place by the displacement. In this study, we investigated the earth pressure on the structure under the railroad constructed by a non-excavation method and the stress relaxation region. The design based on earth pressure is non-economical because it is an over design. Relaxation of stress may lead to road base settlement and rail irregularly due to the reduced railroad supporting stiffness, to ballast crack in the case of concrete roadbed. The result showed that it is reasonable to set the stress on the structures as active earth pressure not as earth pressure at rest. Additionally, the study on the stress relaxation region identified the regions that should be supported in future construction by a non-excavation method.

  • PDF

Effective Methods Reducing Joint Vibration and Elongation in High speed Rail Bridge (고속철도교 신축부의 진동 및 신축의 효율적인 저감 방안)

  • Min, Kyung-Ju;Kang, Tae-Ku;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.800-806
    • /
    • 2011
  • Thermal expansion which occurs at the high speed rail joint is proportional to the free length from the point of fixity. This thermal expansion behaves similar to free expansion because the girder longitudinal stiffness is much larger than longitudinal resistance of rail pads. But the longitudinal displacement in the long rail is nominal because the longitudinal support condition of the girder is normally MFM(movable-fix-movable) system. Due to these girder expansion characteristics, there is longitudinal relative displacement at the rail pad and rail fastener spring which connects rail and girder. If the relative displacement between rail and girder is beyond the elastic limit for the rail pad, rail fastener system shall be applied using sliding fastener to prevent rail pad damage and fastener separation resulting from slip. On the other hand, train vertical vibration and tilting can occur due to the lack of fastener vertical force if the sliding fastener is applied at the girder joint. In the high speed rail bridge, vibration can occur due to the spring stiffness of the elastomeric bearing, also both vertical downward and upward displacement can occur. The elastomeric bearing vertical movement can cause rail displacement and finally the stability of the ballast is reduced because the gravel movement is induced.

  • PDF

Characteristics of Track Behaviors according to Accelerated Tilting Train Speed (틸팅차량 증속에 따른 기존선 궤도의 거동 특성)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1653-1661
    • /
    • 2008
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.

  • PDF

Test Construction of the Paved Track at Subway Main Line (도시철도 본선 토공구간에서의 포장궤도 시험부설)

  • Lee, Il-Wha;Kang, Yun-Suk;Kong, Sun-Yong;Kim, Sang-Jin;Lee, Shun-Gu;Jung, Yun-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF