• Title/Summary/Keyword: railroad track

Search Result 602, Processing Time 0.032 seconds

Evaluation of Stiffness Structure and Grouting Efficiency beneath the Precast Slab Track by Elastic Wave Tests (탄성파시험에 의한 프리캐스트 슬래브궤도의 강성구조와 충전성능 평가)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup;Kang, Youn-Suk;Han, Sung-Woo
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1303-1308
    • /
    • 2007
  • Recently, precast concrete tracks are replacing ballast track for efficient and economic maintenance of track. Precast concrete railroad tracks are manufactured in factory, and transported to railroad construction site for installation. Therefore, quality of precast concrete track itself should be sufficiently good. On the contrary to the convenient manufacturing of precast concrete track, the installation of a precast concrete track requires careful steps. Typically, a precast concrete track is placed on an approximately 15-cm thick lean concrete layer. A mortar is filled between lean concrete layer and precast concrete track to adjust the sloping angle of a precast concrete track for a safe train operation at a curvy section. Then, the use of filled mortarproduces a void underneath a precast concrete track, which is harmful to structural safety of a precast concrete track undercyclic loading. Therefore, it is essential to make sure that there is no void left beneath a precast concrete track after mortar filling. In the continuous resonance method, the amplitude of frequency response measured using an instrumented hammer and an accelerometer is plotted against a pseudo-depth, which is half of the wave velocity divided by frequency. The frequency response functions are measured at consecutive measurement locations, 6-cm interval between measurement points, and then combined together to generate a 2-D plot of frequency response. The sections with strong reflections or large amplitude of frequency response are suspicious areas with internal voids and unfilled areas. The 2-D frequency response plot was efficient in locating problematic sections just by examining the color shade of a visualized plot in 2-D format. Some of the problematic sections were drilled to make a visual inspection of mortar filling. The visual image of interface between mortar and precast concrete track was verified using the validity of the continuous resonance technique adopted in this research.

  • PDF

Optimal Vertical Stiffness of Fastener of Concrete Track in High-Speed Railway (고속철도 콘크리트궤도 체결구 최적 수직강성)

  • Yang, Sin-Chu
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.43-52
    • /
    • 2015
  • In this study, to minimize both the costs associated with track maintenance and the energy consumption for train operation, a numerical method that evaluates the optimal vertical stiffness of a fastener for concrete track is presented. A progress model of the track damage is established in order to calculate the concrete track maintenance cost according to the fastener stiffness. Also, the quantitative relationship between the progress of the track damage and the maintenance of the concrete track is derived. The wheel load is more exactly evaluated by using the advanced vehicle-track interaction model, which can precisely consider the behaviors of the track components. An optimal range for the stiffness of the fastener, a range that is applicable to the design of concrete track for domestic high speed lines, is proposed.

A Study on Effect of Vibration Reduction with Ballast Mat of Ballasted Track in Tunnel (터널내 자갈도상제도의 자갈도상매트 시공 후 진동 저감 효과에 대한 연구)

  • You, Chung-Jun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.167-174
    • /
    • 2009
  • Due to the travelling of the train with high speed the period of maintenance activities of the ballasted track is coming to be short, and more from the residential area of the ballasted track tunnel circumference the civil appeal is increasing with railroad vibration problem. To reduce the vibration problem and a maintenance cost establishes the ballast mat in the tunnel within part segment. In this study, to estimate the vibration reduction effect of the ballast mat we have done a comparative analysis with the vibration field test by the transit train by at the ballasted track with ballast mat and the standard ballasted track without vibration protection in tunnel.

Settlement of Embankment and Foundation for Concrete Track of Gyungbu High Speed Railroad (II) (경부고속철도 콘크리트궤도 토공 및 원지반 침하 (II))

  • Kim, Dae-Sang;Park, Seong-Yong;Shin, Min-Ho;Lee, Hyeon-Jung;Kim, Hyun-Ki
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.457-462
    • /
    • 2007
  • An application of concrete track is being activity processed for the construction of Korean railroad. The concrete track has an advantage to decrease the maintenance fee, but is very difficult to control the settlement of ground and embankment consisting of substructure of concrete track below the allowable settlement level. This is the reason why the measurement and evaluation of both ground and embankment settlement before the installation of the concrete track is very important. One ground, a lower subgrade, and five surface settlements are measured to understand the settlement behavior of ground and embankment settlement. The period to measure settlements was more than 1 year after the completion of embankment. In this test site, ground settlement was over during the construction of embankment, but the embankment settlement are being continuously proceeded after the completion of embankment. The settlement velocity gradually is slowing down as time goes by. This paper also analysed the reasons of abrupt settlement increase and concluded that the rainfall was one of the important reason to increase settlement rate.

Study on the Maintenance Cost of Railway Infrastructure Using Line Classification and TMV Data (선로등급 및 검측차 검측정보를 고려한 철도시설 유지보수비용 산정에 관한 연구)

  • Kim, In Kyum;Lee, Jun S.;Choi, Il Yoon;Lee, Hoo Seok
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.275-287
    • /
    • 2017
  • During the feasibility study of new rail lines, maintenance cost of railway infrastructure has mostly been estimated based on the track length and on simplified parameters; however, the estimation reliability can be improved by employing the correction factor from UIC 715, as well as the line classification in UIC 714. The correlations between maintenance cost and various parameters such as weighted track length based on line classification, radius of curvature, gradient and worn -out rate have been analyzed according to the case studies. Prediction of the maintenance cost has been carried out using the cost data, which were representative of the whole cost data; as a result, it was demonstrated that a cost model based on the line classification and the correction factor was more reliable than the existing models. Furthermore, possibilities of using data from both the track measurement vehicle and from the maintenance information system, which are under development, have been investigated and, based on this investigation, a combined cost model using line classification, radius of curvature, gradient and worn-out rate, among other factors, will be proposed in the near future.

Sensitivity of Track Components on the Linear Thermal Buckling (선형온도좌굴에 대한 궤도 구성요소의 민감도)

  • 임남형;강영종;성익현
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.207-212
    • /
    • 2002
  • The actual buckling of the railroad track structure is suspected to be a complex interaction between the vertical, lateral and torsional modes. To make the analysis tractable, however, most studies restrict themselves to either the vertical or the horizontal plane. Based on a comprehensive and realistic three-dimensional track model developed in the previous study, three dimensional buckling analysis of CWR track subjected to temperature load was performed. Using the study on buckling temperature and mode, sensitivity of track components such as tie spacing, ballast resistance, stiffness of pad-fastening system and rail size were investigated.

  • PDF

Development of Automatic Crack Detection using the Gabor Filter for Concrete Structures of Railway Tracks (가버 필터를 사용한 철도 콘크리트 궤도 도상의 자동 균열 감지 개발)

  • Na, Yong-Hyoun;Park, Mi-Yun;Park, Ji-Soo;Park, Sung-Baek;Kwon, Se-Gon
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.4
    • /
    • pp.458-465
    • /
    • 2018
  • Purpose: Concrete track that affects on railway safety can detect cracks using image processing technique. However, since a condition of concrete track and surface noisy are obstructed to detect cracks, there is a need for a way to remove them effectively. Method: In this study, we proposed an image processing to detect cracks effectively for Korean railway and verified its performance through experiment. We developed image acquisition system for capture a railway concrete track and acquired railway concrete track images, randomly selected 2000 images and detected cracks in the image process using proposed Gabor Filter Bank methods. Results: As a result, 94% of detection rate are matched to the actual cracks in same quality and format railway concrete track image. Conclution: The crack detection method using Garbor Filter Bank was confirmed to be effective for crack image including noise in the Korean railway concrete track. This system is expected to become an automated maintenance system in the existing human-centered railway industry.

Evaluation of Residual Stress for Thermal Damage of Railway Wheel Tread (차륜 답면의 열손상에 대한 잔류응력 평가)

  • Kwon, Seok-Jin;Seo, Jung-Won;Lee, Dong-Hyung;Ham, Young-Sam
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.28 no.5
    • /
    • pp.537-542
    • /
    • 2011
  • The thermo-mechanical interaction between brake block and wheel tread during braking has been found to cause thermal crack on the wheel tread. Due to thermal expansion of the rim material, the thermal cracks will protrude from the wheel tread and be more exposed to wear during the wheel/block contact than the rest of the tread surface. The wheel rim is in residual compression stress when is new. After service running, the region in the tread has reversed to tension. This condition can lead to the formation and growth of thermal cracks in the rim which can ultimately lead to premature failure of wheel. In the present paper, the thermal cracks of railway wheel, one of severe damages on the wheel tread, were evaluated to understand the safety of railway wheel in running condition. The residual stresses for damaged wheel which are applied to tread brake are investigated. Mainly X-ray diffusion method is used. Under the condition of concurrent loading of continuous rolling contact with rails and cyclic frictional heat from brake blocks, the reduction of residual stress is found to correlate well with the thermal crack initiation.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

The Overall Measurement System Development for On-line Test of Super-speed Maglev Train (초고속 자기부상철도 시운전시험을 위한 종합계측시스템 개발)

  • Han, Young-Jae;Lee, Jin-Ho;Jo, Jung-Min;Kim, Lee-Hyung;Lee, Chang-Young;Ha, Chang-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.5
    • /
    • pp.902-910
    • /
    • 2016
  • This paper presents the overall measurement system for on-line test of super-speed maglev train. The super-speed maglev train is composed of vehicle, propulsion, power, and so on. In order to evaluate and diagnose for sub-system, we made overall measurement system. Just like the other measurement system, it is designed to distributed type. The hardware is consist of SCXI, PXI, Terminal, UPS, and so forth. It is installed on a train, control room, power room and track to collect lots of signals. The software controls hardware system, monitors main data such as inverter current, converter voltage. Using the measurement system, we evaluated a lot of performances for vehicle, track, and so forth. Through the developed system have improved reliability and safety for super-speed maglev train.