• Title/Summary/Keyword: rail transportation

Search Result 564, Processing Time 0.03 seconds

Train Service Analysis of Intercity Rail Station (지역간 철도역의 열차운행체계 연구)

  • Lee, Jin-Seon;Kim, Gyeong-Tae;Park, Beom-Hwan
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.111-122
    • /
    • 2007
  • This paper investigates the rail service patterns by train class. The emphasis in intercity rail planning is to more efficiently use of existing station facilities. Rail transit operations are affected by the system layout and ridership patterns and by work rules. Operations are also influenced by past practices and the institutional setting. Main factors to decide train service patterns are the location, socioeconomic characteristics, land use and travel demand of the station. In this context, the travel demand of intercity rail station is of crucial significance. Tests on a KTX case shows that train service frequency can be efficiently decreased in weekday to transport the same passenger demand. The work has shown many subjects that need further research including various factors influencing on train frequency. This study serves the railroad authorities in planning and determining business strategy in the increasingly competitive environment of regional rail transport.

The Funding system for Shanghai Metro And The Practical Experiences of Utilizing Foreign Funds

  • Zhou Yao Dong
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.09a
    • /
    • pp.185-191
    • /
    • 1998
  • Metro, as a kind of city rail transit, is a modem city passenger transit system with mass transportation and independent special rails. It has become a backbone of the traffic in the metropolis and an important modern symbol of a city. A modem traffic system is indispensable for Shanghai to be an international metropolis of finance, trade and economy. At present, Shanghai metro line No. 1 and its extension have been put into operation, metro line NO. 2 will be put into trial operation by the end of 1999, the Pearl Line, an elevated rail transit system is under construction and other lines will be constructed later according to the plan. But the funding of the city rail transit construction (both metro and light rail) is a big difficult problem to the infrastructure construction of the metropolises either at home or abroad, which is also a problem to restrict the development of the city rail transit of Shanghai. We have learned from the internal and external experiences of the rail transit construction that it is an important means to deal with the funds of the city rail transit construction to actively utilize foreign funds. It makes up the shortage of the internal funds on the one hand, the external advanced science and technology and the management experiences can be introduced on the other hand. In order to discuss and study conveniently with you together the new problems appearing in the metro construction and to open up a new train of thought, this article will give out a certain analysis and description to the funding method in the metro construction of Shanghai and the characteristics of utilizing foreign funds in the rail transit construction as well as the problems which we are faced with.

  • PDF

An Empirical Analysis on Public Transportation Demand and TOD Design Factors in Seoul subway adjacent area (서울시 역세권의 TOD환경과 대중교통이용수요 관계분석)

  • Moon, Young-Il;Rho, Jeong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.13 no.4
    • /
    • pp.211-220
    • /
    • 2011
  • TOD(Transit Oriented Development) has recently been active, which presents that TOD planning elements should be comprehensively taken into consideration in order to enhance domestic transit ridership by changing environments in rail station areas and an empirical analysis on the type of rail station areas and transportation demand should be a prerequisite for usage of future development planning. This study aims to grasp a variety of TOD of influence factors in Seoul rail station area and to perform analysis to identify relationship between public transportation demand and these TOD design factors. To make it come true, we gathered data with respect to Density, Diversity, and Accessibility as representative TOD planning elements and carried out factorial and regression analysis. Consequently, we drew 7 influence factors base on factorial analysis: Factor 1(Diversity/ -Use Mix(LUM)), Factor 2(Density/development density), Factor 3(Accessibility/public transportation facility supply), Factor 4(Design/street design), Factor 5(Green/access mode (pedestrian, bike), Factor 6(Design/subway size), Factor 7(Accessibility/Public transit operation) As the result of model development by using factorial and regression analysis, positive influence factors on passenger flow in rail station area are Factor 1(Diversity : Land-Use Mix), Factor 3(Accessibility : public transportation facility supply), Factor 2(Density : development density), Factor 5(Design/ access mode) and Factor 6(subway size) Next, negative influence factor on passenger flow in rail station area shows Factor 7(Accessibility/Public transit operation) as the most influential factor. This is because the growth of service interval of linked subway and bus leads to reduced demand.

Transfer Impedence of Trip Chain with a Railway Mode Embedded - Using Seoul Metroplitan Transportation Card Data - (철도수단이 내재된 통행사슬의 환승저항 추정방안 - 수도권 교통카드자료를 활용하여 -)

  • Lee, Mee young;Sohn, Jhieon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1083-1091
    • /
    • 2016
  • This research uses public transportation card data to analyze the inter-regional transfer times, transfer frequencies, and transfer resistance that passengers experience during transit amongst the metropolitan public transportation modes. Currently, mode transfers between bus and rail are recorded up to five times during one transit movement by Trip Chain, facilitating greater comprehension of intermodal movements. However, lack of information on what arises during these transfers poses a problem in that it leads to an underestimation of transfer resistances on the Trip Chain. As such, a path choice model that reflects passenger movements during transit activities is created, which attains explanatory power on transfer resistance through its inclusion of transfer times and frequencies. The methodology adopted in this research is to first conceptualize the idea of metropolitan public transportation transfer, and in the case that mode transfers include the city-rail, to newly conceptualize the idea of transfer resistance using transportation card data. Also, the city-rail path choice model within the Trip Chain is constructed, with transfer time and frequency used to reevaluate transfer resistance. Further, in order to align bus and city-rail station administrative level small-zone coordinates to state and regional level mid-zone coordinates, the big node methdod is utilized. Finally, case studies on trip chains using at least one transfer onto the city-rail is used to determine the validity of the results obtained.

A Study on the Process of Constructing a Long-Term Railway Network Plan (장기철도망 구축계획의 구축과정에 관한 연구)

  • Seo, Kwang Seok
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.3
    • /
    • pp.267-275
    • /
    • 2012
  • Long-term national railway building comprehensive review of the proposal had 100 in railway history, railway rail network plan. Planning routes for establishing a plan, but, considering the rail network, the plan was that could with the very important meaning in the What more economical route considering the costs and benefits of building a rail network under budget constraints, went through the process of background lines of business unit interval expenses to adopt a business unit interval. Especially in building the railway network, as well as the road plan was to reflect in order to build for the future railway facilities was secured examine the possibility of possible budget commitment. Budget of securing the transportation tax, gasoline tax, and other transportation facilities in order to secure and commit the current funding approach and Review Bodu possible budget scenarios based on it written. Was also enforce rail system built in reviewing the demand more than anything that can take advantage of the railway distance by railway and the merits of the competition means to compete in the form of the assumed situation. The rail network deployment plan, considering this was discussed, based on the results of the plan to establish the first annual or period of the plan change was based on the budget that was unknown.

Measuring Technique For Acoustic Roughness of Rail Surface With Homogeneous Displacement Sensors (동일 변위센서를 사용한 레일표면 음향조도의 측정방법)

  • Jeong, Wootae;Jang, Seungho;Kho, Hyo-In
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7941-7948
    • /
    • 2015
  • Rolling noises during train operation are caused by vibration excited from irregularities of surface roughness between wheel and rail. Therefore, a proper measurement and analysis techniques of acoustic roughness between wheel and rail surface are required for transmission, prediction, and analysis of the train rolling noise. However, since current measuring devices and methods use trolley-based manual handling devices, the measurements induce unstable measuring speed and vibrational interface that increases errors and disturbances. In this paper, a new automatic rail surface exploring platform with a speed controller has been developed for improving measurement accuracy and reducing inconsistency of measurements. In addition, we propose a data integration method of the rail surface roughness with multiple homogeneous displacement sensors and verified the accuracy of the integrated data through standard test-bed railway track investigation.

Technical Evaluation of Railway Transportation System with the Change of Gauge (궤간변경 철도 수송 시스템의 기술적 평가)

  • Chung, Kwang-Woo;Kim, Chul-Su;Jang, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.5
    • /
    • pp.1954-1962
    • /
    • 2012
  • Recently the increase in the exchange of goods between Europe and Asia caused by social and economic factors creates good opportunities for railways. At the same time, however, it becomes an enormous challenge for railway transport. There are different rail track gauges (i.e narrow/standard/broad gauge) on the continental transportation between Korea (TKR) and Eurasian (TCR/TSR). The existence of various track gauges is one of obstacles preventing the smooth flow of goods by rail. The transferring process system from one track gauge to another could vary with the types of cargo. Service operation of these systems has a decisive effect on working time and cost of storage and transshipment facilities at border crossings. In relation to the above-mentioned factors, it is important to examine the comparison between different methods of transferring goods in different track gauges. In this study, it was performed to evaluate the effectiveness of continental railway transportation systems through analysis scenarios and to suggest technical factors of them.

Structural Strength Analysis and Static Load Test of a Wheelset of Korean High Speed Rail for Measuring Whee/Rail Force (한국형 고속철도차량의 차륜/궤도 작용력 측정을 위한 윤축의 구조강도 해석 및 정하중 시험)

  • 전응식;함영삼;허현무;강부병
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.898-903
    • /
    • 2002
  • The railroad is a means of large transportation which has many talents such as a safety and a regularity. That is a results from various confidential performance tests and evaluations of the system. The railroad system consist of various subsystems - vehicle, power supply, signal, communications, track structures, operations, etc. Among them, as an item of safety evaluation there is a measurement of wheel/rail force, so called a measurement of derailment coefficient. This is a very important item because a derailment of a train will bring about a big accident. Especially it is more inportant in high speed rail of which operation speed is over two times as fast as existing rail. In this paper, it is introduced to preprocess the wheelset for measuring wheel/rail force of high speed rail, such as to treat a measuring wheelset, its finite element analysis, adhesion of strain gauges and static load test.

  • PDF