• Title/Summary/Keyword: rail joint

Search Result 108, Processing Time 0.027 seconds

Experimental Study on Hardness and Wear Characteristics of Welded Rails (레일 용접부의 경도와 마멸특성에 관한 실험적 연구)

  • 김청균;황준태;나성훈;민경주
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.234-243
    • /
    • 1998
  • In this paper, thermite and gas pressure weldings have been used to join rails in-track and analyzed as functions of hardness and wear characteristics. The wear rate of thermite welded rail is low compared with that of gas pressure welded rail, which is tested in a pin-on-disk wear tester. The hardness of thermite welded materials is relatively high and narrow distributed between three zones, welded part, thermally affected zone, and a base matrix. Wear of a welded rail may be a major factor in railroad maintenance costs and failures at the rail-rail butt joint.

  • PDF

An Exploratory Study on Developing Asian Rail Pass linking Korea, China and Japan (아시아레일패스 개발을 위한 탐색적 연구)

  • Yang, You-Kyung;Lee, Kyung-Tae;Yin, Tae-Myoung
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.801-812
    • /
    • 2009
  • Recently, the cooperation between railway operators has been increased to maximize the efficiency of Asian railway network and international tourists, especially tourists to Asian region grow rapidly. But the cooperation in the rail tourism and leisure field has not yet been promoted. Therefore, this study suggests the development strategy of Asian Rail Pass like Eurail and InetRail Pass. It discusses mainly three Northeast Asian countries, Korea, China and Japan, which are very important area as the third world trade market and high rate of personal exchange. A joint research has to be conducted to feel out the practicability and profitability for the development of Asian Rail Pass. This study will publicize the necessity of Rail Pass in Asia.

  • PDF

The Development of Program for Time Domain Simulation of Railway Dynamics (철도차량 동역학의 시간영역 시뮬레이션 프로그램 개발)

  • No, Chang-Su
    • 한국기계연구소 소보
    • /
    • s.18
    • /
    • pp.87-97
    • /
    • 1988
  • The algorithm for relation of contact status, track shift, and contact force caused from wheel/rail contact geometry is presented. Grafting this algorithm into a algorithm of general program analyzing mechanical system, the program for time domain simulation of railway vehicle dynamics, called CASOTD, was developed. In addition, as applied example of CASOTD, the dynamic simulation of railway vehicle running on a rail joint and a irregularly alinemented rail is done in this paper.

  • PDF

A Study on Logicality for the Periodic Replacements of Continuous Welded Rail based on Accumulated Passing Tonnage (누적통과톤수에 의한 레일교체기준의 타당성 분석)

  • Sung, Deok-Yong;Kong, Sun-Yong;Kim, Park-Jin;Shin, Hyo-Jung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1058-1070
    • /
    • 2007
  • Internal and external railway management corporations are using the periodic replacement criteria of rail by accumulated passing tonnage and wear to maintain rails for servicing. However, internal the periodic replacement criteria of continuous welded rail(CWR) by accumulated passing tonnage is the one(50kg/m-5 million gross tonnage, 60kg/m-6 million gross tonnage) presented in Japan before. It was estimated with the fatigue life about 50kg N rail joints applied diesel train load but it wasn't applied to current conditions of track; elimination of rail joint, using the concrete slab track and operation of light train load and effect of welding, manufacturing technique, grinding of rail. Therefore, in this study, it was investigated the types of damage and cause in welded rails and examined standards and information resources. Also, this study presents preliminary data to revise the periodic replacement criteria of CWR by current accumulated passing tonnage in bending test of laid welded rail and a survey of track maintenance history of Seoul metro.

  • PDF

Numerical Analysis of the Roadbed Settlement beneath Rail Joint Induced by Tilting-Train Loading (틸팅차량 하중에 의한 레일 이음매 하부 노반침하에 대한 수치 해석적 분석)

  • Jeon, Sang-Soo;Eum, Gi-Young;Kim, Jae-Min;Jung, Du-Hwoe;Han, Sung-Dae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.4 s.23
    • /
    • pp.7-14
    • /
    • 2006
  • The tilting-train being operated in pre-existing rail road has a different running mechanism compared to currently operated trains. Therefore, it needs to investigate the evaluation of the track performance, the stability of the tilting-train in operating condition, and the stability of the roadbed. In this study, when the tilting train is operated in the rail joint with the allowable velocity limited by the track performance and the stability of the tilting-train, the settlement of the roadbed has been evaluated by using numerical analysis. The loading on the ground surface generated by the operating tilting-train generates the settlement of the roadbed. The settlement induced by the tilting-train loading has been compared to the allowable settlement and the factor of safety defined by the ratio of the allowable settlement to the settlement generated by the applied loading is evaluated.

Dynamic Behavior of a Open-Deck Steel Bridge considering Surface Irregularities of Rail Joints (레일이음매에 의한 주행면 불규칙성을 고려한 판형교의 동적거동)

  • Kim Sung-Il;Kim Hyun-Min;Oh Ji-Taek
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1028-1033
    • /
    • 2004
  • The open deck steel bridge is the most common type in railway bridges. Steel I-shaped girders are connected with sleepers directly without ballast and moving train loads are transmitted directly to the girder, so this bridge has weak characteristics on impact. Therefore, considerable accelerations can cause unsatisfactory dynamic behavior of the open deck steel bridge. Especially, Impact created at rail joints can increase the dynamic response of the bridge and this phenomenon would be injurious to passenger comfort. In the present study, dynamic behavior of the open deck steel bridge which has a rail joint is estimated through experimental studies and bridge-train interaction analysis considering surface irregularities by rail joints.

  • PDF

Vibration Characteristics of the Electric Car due to Joint Discontinuity (철로 이음매에 기인하는 전동차의 진동특성 분석)

  • 임병덕;최연선
    • Proceedings of the KSR Conference
    • /
    • 1998.05a
    • /
    • pp.287-290
    • /
    • 1998
  • Wheel impact due to the joint discontinuity is a major source of uncomfortable vibration in the railway vehicles. Since the impact signal is measured using sensors attached to the bogie and its energy content is small compared to the other vibrations from the machineries such as motors and gear systems, the seperation of the impact signal is generally difficult. In this study a technique using an evolutionary spectrum is proposed in order to estimate the impact signal due to the rail joint discontinuity.

  • PDF

Study on the Maximum Expansion Length of a Bridge with Contrete Track (콘크리트궤도 부설교량의 최대 신축장에 관한 연구)

  • Choi, Yu-Bok;Choi, Jin-Yu;Park, Yong-Gul;Joo, Hwan-Joong;Ki, In-Do
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.436-442
    • /
    • 2011
  • It is increasing construction of long span railway bridge with concrete track system for speed up of railway and efficient maintenance of track. As the sleeper of the concrete track system layed on a bridge is fixed on deck of the bridge, the displacement of the sleeper and deck is same. Therefore, the spacing between two sleeper installed at the end of the adjacent deck near the expansion joint of bridge becomes vary according to the longitudinal expansion of a deck by temperature change. By the way, if the spacing of sleepers become increase excessively, it causes large bending stress of in a rail, and it can leads failure or reduction of fatigue life of the rail. And also the excessive displacement of the rail may induce decrease ride comfort. Therefore, in order to prevent such problems, the allowable maximum sleeper spacing at a bridge expansion joint was mutually determined. And, the determination procedure of the maximum bridge expansion length based on the allowable sleeper spacing was suggested.

  • PDF

A study on gap treatment in EMS type Maglev (상전도 흡입식 자기부상열차에서 공극처리방식에 대한연구)

  • Sung, Ho-Kyung;Jho, Jeong-Min;Lee, Jong-Moo;Kim, Dong-Sung
    • Proceedings of the KSR Conference
    • /
    • 2006.11a
    • /
    • pp.189-197
    • /
    • 2006
  • Maglev using EMS becomes unstable by unexpected big air-gap disturbance. The main causes of the unexpected air-gap disturbance are step-wise rail joint and large distance between rail splices. For the stable operation of the Maglev, the conventional system uses the threshold method, which selects one gap sensor among two gap sensors installed on the magnet to read the gap between magnet and guide rail. But the threshold method with a wide bandwidth makes the discontinuous air-gap signal at the rail joints because of the offset in air gap sensors and/or the step-wise rail joins. Further more, in the case of the one with a narrow bend-width, it makes Maglev system unstable because of frequent alternation. In this paper, a new method using fuzzy rule to reduce air-gap disturbances proposed to improve the stability of Maglev system. It treats the air-gap signal from dual gap sensors effectively to make continuous signal without air gap disturbance. Simulation and experiment results proved that the proposed scheme was effective to reduce air-gap disturbance from dual gap sensors in rail joints.

  • PDF

Parameteric Analysis for Up-lifting force on Slab track of Bridge (교량상 slab궤도의 상향력 민감도분석)

  • Choi, Sung-Ki;Park, Dae-Geun;Han, Sang-Yoon;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1188-1195
    • /
    • 2007
  • The vertical forces in rail fasteners at areas of bridge transitions near the embankment and on the pier will occur due to different deformations of adjoining bridges caused by the trainloads, the settlement of supports, and the temperature gradients. The up-lifting forces is not large problem in the blast track because the elasticity of blast and rail pad buffs up-lifting effect. But, it is likely to be difficult to ensure the serviceability of the railway and the safety of the fastener in the end in that concrete slab track consist of rail, fastener, and track in a single body, delivering directly the up-lifting force to the fastener if the deck is bended because of various load cases, such as the end rotation of the overhang due to the vertical load, the bending of pier due to acceleration/braking force and temperature deviation, the settlement of embankment and pier, the temperature deviation of up-down deck and front-back pier, and the rail deformation due to wheel loads. The analysis of the rail fastener is made to verify the superposed tension forces in the rail fastener due to various load cases, temperature gradients and settlement of supports. The potential critical fasteners with the highest uplift forces are the fastener adjacent to the civil joint. The main influence factors are the geometry of the bridge such as, the beneath length of overhang, relative position of bridge bearing and fastener, deflection of bridge and the vertical spring stiffness of the fastener.

  • PDF