• Title/Summary/Keyword: pumping time

Search Result 305, Processing Time 0.024 seconds

Determination of the Optimal Strategy for Pump-And-Treat Method

  • Ko, Nak-Youl;Lee, Kang-Kun
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2001.09a
    • /
    • pp.204-207
    • /
    • 2001
  • An optimization process for the design of groundwater remediation is developed by simultaneously considering the well location and the pumping rate. This process uses two independent models: simulation and optimization model. Groundwater flow and contaminant transport are simulated with MODFLOW and MT3D in simulation model. In optimization model, the location and pumping rate of each well are determined and evaluated by the genetic algorithm. In a homogeneous and symmetric domain, the developed model is tested using sequential pairs for pumping rate of each well, and the model gives more improved result than the model using sequential pairs. In application cases, the suggested optimal design shows that the main location of wells is on the centerline of contaminate distribution. The resulting optimal design also shows that the well with maximum pumping rate is replaced with the further one from the contaminant source along flow direction and that the optimal pumping rate declines when more cleanup time is given. But the optimal pumping rate is not linearly proportional to the cleanup time and the minimum total pumping volume does not coincide with the optimal pumping rate.

  • PDF

Vacuum system design of a 10 ton/day class air liquefaction cold box for liquid air energy storage

  • Sehwan, In;Juwon, Kim;Junyoung, Park;Seong-Je, Park;Jiho, Park;Junseok, Ko;Hankil, Yeom;Hyobong, Kim;Sangyoon, Chu;Jongwoo, Kim;Yong-Ju, Hong
    • Progress in Superconductivity and Cryogenics
    • /
    • v.24 no.4
    • /
    • pp.65-70
    • /
    • 2022
  • A vacuum system is designed for thermal insulation of a 10 ton/day class air liquefaction cold box for liquid air energy storage. The vacuum system is composed of a turbomolecular pump, a backing pump and vacuum piping for the vacuum pumps. The turbomolecular pump is in combination with the backing pump for pumping capacity. The vacuum piping is designed with system installation conditions, such as distance from the cold box, connections to vacuum pumps and installation space. The capacity of the vacuum pump combination, namely pumping speed, is determined by analysis of the vacuum system, and pump-down time to 1×10-5 mbar is estimated. Vacuum piping conductance, system pumping speed and outgassing rate are calculated for the pump-down time with the ultimate pumping speed range of the vacuum pump combination of 1400 - 2300 l/s. Although the pump-down time gets shorter by larger capacity vacuum pumps, it mainly depends on target vacuum degree and outgassing rate in the cold box. The pump-down time is estimated as 3 - 6 hours appropriate for cold box operation for the pumping speed range. Considering the outgassing rate has uncertainty, the vacuum pump combination with pumping speed of 1900 l/s is chosen for the vacuum system, which is middle value of the pumping speed range.

The Technology of Peak Demand Reduction using Automatic Water Tank Pumping System on the Apartment And Analysis of Effect of Energy Cost (아파트 고가수조 자동급수장치를 이용한 전력피크 감소 및 전력시장에서의 효과 분석)

  • Lee, Jae-Gul;Lee, Yun-Kyoung;Cho, Won-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.161-163
    • /
    • 2006
  • This paper introduce the technology of peak demand reduction using automatic water tank pumping system on the apartment. That systems on the apartments installed water tank can control pumping(electricity) demand. Generally, system peak demand is occurred at the same time on workday and many water pumps consume electric power randomly. At this point, shift of operating time of water pump can reduce peak demand using automatic water tank pumping system. We were operating this system on some apartments for test of effect of peak demand reduction. and we represent result of demand shift. This result suggests that spread of the automatic water pumping system can contribute to reduce system peak demand and reduce system operation cost.

  • PDF

Prevention of the Electrolyte Pumping in the Molten Carbonate Fuel Cell by Means of the Improved Manifoldcasing (용융탄산엽형 연로전지에 있어서 새로운 형태의매니폴드케이싱에 의한 전해질 펌핑 방지에 관한 연구)

  • 박상길;노창주
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.1
    • /
    • pp.95-106
    • /
    • 1992
  • For commercial application of the MCFC, the life time of the MCFC should exceed 40,000 hours, But the life time of the state-of-the-art MCFC was limited to 15,000 hours. The main reasons of the life time limit can be classified as the deficiency of the electrolyte and cathode dissolution. It has been found that the electrolyte deficiency is caused by the continuous evaporation of the electrolyte. However a recent reaserch shows that an electrolyte pumping phenomenon, which implies, the migration of the electrolyte through the gasket material of the external gas manifold, is also the reason of the electrolyte deficiency. Due to the electrolyte pumping phenomenon, positive end cell of the stack suffers the electrolyte deficiency and negative end cell of stack is flooded with electrolyte. Therefore, the cell performance is degraded. The author invented a new manifoldcasing, which prevents the contact between the wet seal and the gasket of the manifold, and gives a complete elimination of an electrolyte pumping effect.

Characteristics of Ground Water Capture Zone according to Pumping Rate (지하수 양수량에 따른 지하수유동 및 포획구간 특성 변화)

  • Ahn, Seung-Seop;Park, Dong-Il;Oh, Young-Hun
    • Journal of Environmental Science International
    • /
    • v.22 no.7
    • /
    • pp.895-903
    • /
    • 2013
  • This study analyzed on characteristics of the ground-water capture zone in coastal areas and mid-mountainous area according to pumping rate. For this study, it targeted Jejudo island where is the volcanic island. To analyze, MODFLOW model and MODPATH model, which are the ground-water flow analysis models, were used. As a result of research, the following conclusions could be obtained. As a result of analyzing influence of a change in pumping time upon length of capture zone, the length of capture zone in coastal area was indicated to be greater in the changing ratio compared to the length of capture zone in mid-mountainous area. Next, in the coastal area, the pumping rate and the capture-zone length are changing similarly. However, in mid-mountainous area, the length of capture zone was indicated to grow when the pumping rate comes to exceed 1,500m3/day. As a result of analyzing influence of a change in pumping time upon capture area, the tendency of a change in the area was indicated similarly in coastal areas and mid-mountainous area. Especially, it could be known that the larger pumping rate leads to the more definite increase in tendency to a change in capture area. Based on this study, it was allowed to be possibly used in the suitable pumping rate in coastal areas and mid-mountainous area of the volcano island in the future. A follow-up research is judged to necessarily analyze the influence of tubular-well group upon capture zone by additionally analyzing a change in capture zone targeting the concentrated tubular well.

Management of Water Pumping System in Coastal Area of Jeju City Based on Coastal Landscape (제주시 해안경관을 고려한 해수인수관 관리방안)

  • Cho, Eun-Il;Lee, Byung-Gul
    • Journal of Environmental Science International
    • /
    • v.15 no.9
    • /
    • pp.871-880
    • /
    • 2006
  • Water management treatment of coastal region has been an important problem in Jeju city since the distributions of pipeline of the pumping system made a bad view in coastal region. To solve the problem, we observed the pipelines that are on the surface around the coastal region from Tapdong to Doduhang. From the observations, we found that Todong and Dodu areas were not unsightliness because the all pipelines were located in underground. However, the other areas, such area Yongdam, Handugi, Yongdam fishing village, had a serious problem for the coastal landscape view. To solve the problem, at we estimated coastal land color characteristics of Jeju city based on the observation of the pipelines. The estimated color panel shows that the green, blue and grey colors are a dominant factors of the Jeju coastal region. Based on the color panel, we proposed two methods, that is, one is a short time treatment, the other is a long time one. The short is based on the colour treatment, which is pipeline colour changing into surround natural one. The long time is the construction plan design method. Although the later method was very useful in Jeju island. However, it takes a lot of time and money. Therefore, in the situation, the short time is the better than the long time one.

Design of Irrigation Pumping System Controller for Operational Instrument of Articulation (관절경 수술을 위한 관주(灌注)시스 (Irrigation Pumping System) 제어기의 개발)

  • 김민수;이순걸
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1294-1297
    • /
    • 2003
  • With the development of medical field, many kinds of operations have been performed on human articulation. Arthroscopic surgery, which has Irrigation Pumping System for security of operator vision and washing spaces of operation, has been used for more merits than others. In this paper, it is presented that the research on a reliable control algorithm of the pumping system instrument for arthroscopic surgery. Before clinical operation, the flexible artificial articulation model is used for realizing the model the most same as human's and the algorithm has been exploited for it. This system is considered of the following; limited sensing point, dynamic effect by compliance, time delay by fluid flow and so on. The system is composed with a pressure controller, a regulator for keeping air pressure, an airtight tank that can have distilled water packs, artificial articulation and a measuring system, and has controlled by the feedback of pressure sensor on the artificial articulation. Also the system has applied to Smith Predictor for time delay and the parameter estimation method for the most suitable system with both the experiment data and modeling. In this paper, the pressure error that is between an air pressure tank and an artificial articulation was measured so that the system could be presumed and then the controller had developed for performing State-Feedback. Finally, the controller with a real microprocessor has realized. The confidence of system can be proved by applying this control algorithm to an artificial articulation experiment material.

  • PDF

Water - Commander of Vacuum (물, 진공의 지배자)

  • In, Sang Ryul
    • Vacuum Magazine
    • /
    • v.1 no.1
    • /
    • pp.6-10
    • /
    • 2014
  • It is a common sense that water is an old offender crashing our dream of achieving a good vacuum in an early time. Various techniques for accelerating the removal of water have been developed and utilized. However, we generally are not skilled in treating the water pumping in a physically proper manner. We are rather used to handle the situation of the water pumping just like considering a conventional air pumping. Under such an erroneous approach, we cannot help making an overestimation on the pumping capability of our vacuum system, and it leads to a big mismatch between the real operation timing and the planned process schedule. In this article, some main points concerning with the subject that a vacuum pumping is really a water pumping will be discussed.

A Safety Plan for the Pumping Station by Hydraulic Transient Analysis and Demonstration (과도수리현상 해석과 실증을 통한 펌프장 안정성 확보방안)

  • Ra, Beyong-pil;Kim, Jin-min;Lee, Dong-keun;Park, Jong-ho;Kim, Kyung-yup
    • The KSFM Journal of Fluid Machinery
    • /
    • v.8 no.5 s.32
    • /
    • pp.22-28
    • /
    • 2005
  • As the water supply facilities are recently getting larger, the domestic waterworks become multi-regional water supply system. Large water supply facilities generally consist of the intake pumping station, water treatment plant and water supply/distribution facilities. Although the pumping stations and the pipeline systems are used to pump up water, it often happens pipeline damage and flooding accident by the water hammer. In this paper, the intake pumping station is guaranteed by both the computer simulation and the field test analysis. This study is contributed to the safe operation program for the pumping station in which results of the adjustment on the safety plan of the pumping station, the air valve and the valve closing time.

Development of concrete pumping technology for construction of high-rise building using electromagnetic field (전자기장을 활용한 초고층 건축물 콘크리트 압송기술개발)

  • Kim, Woo-Jea;Kwon, Seung-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.4-5
    • /
    • 2018
  • Recently, high-strength concrete used for shortening the construction time of high-rise building construction, Concrete pumping technology is emerging as the core technology of high-rise buildings. In this paper, we have started to study the use of electromagnetic field as a method to increase the efficiency of the lubricating layer between the inside of the pipe and concrete, which has been established as the most important factor determining the pumping performance. The pumping performance improvement effect of concrete strength was verified and basic research was carried out to utilize it as a method to increase the efficiency of pumping in field application. In the related work, the effect of the electromagnetic field was verified by conducting a mock-up performance evaluation (horizontal 300 m) of the pumping force by the concrete strength.

  • PDF