• Title/Summary/Keyword: pull

Search Result 2,033, Processing Time 0.034 seconds

Pull-in Suture Technique for the Disinsertion of the Phalangeal Tendon Distal Insertion (Pull-in 봉합술을 이용한 수지건 원위 부착부 파열의 치료)

  • Kim, Jae Won;Chung, Sung Mo
    • Archives of Plastic Surgery
    • /
    • v.35 no.6
    • /
    • pp.723-728
    • /
    • 2008
  • Purpose: The disinsertion of the phalangeal tendon distal insertion has difficulties in ordinary tenorrhaphy operation for the anatomical features, and still has controversy between non-surgical and surgical management. The purpose of this study is to select treatment for the injury of the phalangeal tendon distal insertion, as we've had a good results from operation treatment with Pull-in suture technique. Methods: We reviewed the hospital records of 12 patients treated with Pull-in suture technique with disinsertion of the phalangeal extensor or flexor tendon distal insertion from June 2006 to June 2007. Eight patients were involved with the tendon disinsertion without bone fracture, and 4 patients were involved with the fracture of the phalangeal tendon distal insertion site. After removal of the K-wire in week 6, active physical exercises were commenced immediately. The mean follow-up period was 12.4 months. Results: All the patients who had tendon disinsertion with bone fracture had IIB, by Wehbe and Schneider's classification 2, and we evaluated the results comparing the same finger of the other hand according to Crawford's evaluation criteria 5. The nine excellent and three good results were obtained and there were no limitation of motor for the patient who had operation for the rupture of flexor tendon as well. There were no particular complications during the follow-up period. Conclusion: The most important thing for the disinsertion of the phalangeal tendon distal insertion is to maintain an accurate and durable reduction state keeping the tension of tendon. At this point, after removal of the K-wire, the Pull-in suture technique allows accurate realignment of the tendon-bone unit without any specific instrumentation under the more stable state. The Pull-in suture technique seems to be a strong alternative for the treatment of disinsertion of the phalangeal tendon distal insertion, with successful treatment outcome(rapid functional recovery and high patient satisfaction).

A Scheme for Push/Pull Buffer Management in the Multimedia Communication Environments (멀티미디어 통신 환경에서 Push/Pull 버퍼 관리 기법)

  • Jeong, Chan-Gyun;Lee, Seung-Ryong
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.2S
    • /
    • pp.721-732
    • /
    • 2000
  • Multimedia communication systems require not only high-performance computer hardwares and high-speed networks, but also a buffer management mechanism to process many data efficiently. Two buffer handling methods, Push and Pull, are commonly used. In the Push method, a server controls the flow of dat to a client, while in the Pull method, a client controls the flow of data from a server. Those buffering schemes can be applied to the data transfer between the packet receiving buffer, which receives media data from a network server, and media playout devices, which play the recived media data. However, the buffer management mechanism in client-sides mainly support either one of the Push or the Pull method. Consequently, they have some limitations to support various media playout devices. Futhermore, even though some of them support both methods, it is difficult to use since they can't provide a unified structure. To resolved these problems, in this paper, we propose an efficient and flexible Push/Pull buffer management mechanism at client-side. The proposed buffer management scheme supports both Push and Pull method to provide various media playout devices and to support buffering function to absorb network jitter. The proposed scheme can support the various media playback devices using a single buffer space which in consequence, saves memory space compared to the case that a client keeps tow types of buffers. Moreover, it facilitates the single buffer as a mechanism for the absorbing network jitter effectively and efficiently. The proposed scheme has been implemented in an existing multimedia communication system, so called ISSA (Integrated Streaming Service Architecture), and it shows a good performance result compared to the conventional buffering methods in multimedia communication environments.

  • PDF

Deformation Characteristics of the Pressurized Grouting Soil Nailing Systems from the Field Pull-out Tests (현장인발시험을 통한 가압 그라우팅 쏘일네일의 변형특성)

  • Chun, Byungsik;Park, Joosuck;Park, Sisam;Jung, Jongju;Kong, Jinyoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.9 no.2
    • /
    • pp.61-65
    • /
    • 2008
  • In this study, a newly modified soil nailing technology named as the PGSN (Pressurized Grouting Soil Nailing) system is proposed. Effects of various factors related to the design of the pressurized grouting soil nailing system, such as the length of re-bars and type of reinforcement materials, were examined throughout a series of the displacement-controlled field pull-out tests. 9 displacement-controlled field pull-out tests were performed and the ratio of injected grout volume to grout hole volume were also evaluated based on the measurements. In addition, short-term characteristics of pull-out deformations of the newly proposed PGSN system were analyzed and compared with those of the ordinary soil nailing system by carrying out field pull-out tests. The test results were shown that the displacements of pressurized grouting soil nailing system were decreased 30~36% in comparison with using gravity grouting soil nailing system by the pressurized effect. The displacements of steel tube were diminished 31~32% comparison with using deformed bar by the reinforcement type change from the field pull-out tests.

  • PDF

Design of Pull Box Members on the Landing Pier Using Finite Element Analysis of a Steel Plate (강재 플레이트 유한요소해석을 이용한 잔교 상부의 풀 박스 부재의 선정)

  • Kim, Sungwon;Hong, Hyemin;Han, Taek Hee;Seo, Seung Nam
    • Journal of Coastal Disaster Prevention
    • /
    • v.4 no.3
    • /
    • pp.111-118
    • /
    • 2017
  • In this study, pull box members were designed by finite element analysis of a steel plate covering a pull box to secure its safety on the landing pier dedicated to the large research survey ship. It was assumed that the maximum load is due to the 250 tonf class crane used for unloading work when the working environment in the upper part of the landing pier was considered. The safety of the pull box was evaluated by the comparison between the yield strength of the steel plate and the result of stress analysis on the steel plate due to the crane load. It was found that the stress at the plate from the crane load exceeded the yield strength of the steel(205MPa) when the upper part of the pull box was protected by a $1950{\times}1950mm$ steel plate cover. In order to compensate for this, a concrete filled steel tube(CFT) column with a diameter of 150 mm and a steel thickness of 10 mm was reinforced at the center of the plate, and the finite element analysis was carried out. However, the maximum stress at the steel plate was higher than the yield strength of the steel in some load cases so that it was tried to find appropriate thickness of the steel plate and diameter of the CFT columns. Finally, the analysis results showed that the safety of the pull box was secured when the thickness of the steel plate and the diameter of the CFT column were increased to 30mm and 180mm, respectively.

Influence of geometric factors on pull-out resistance of gravity-type anchorage for suspension bridge

  • Hyunsung, Lim;Seunghwan, Seo;Junyoung, Ko;Moonkyung, Chung
    • Geomechanics and Engineering
    • /
    • v.31 no.6
    • /
    • pp.573-582
    • /
    • 2022
  • The geometry of the gravity-type anchorage changes depends on various factors such as the installation location, ground type, and relationship with the upper structure. In particular, the anchorage geometry embedded in the ground is an important design factor because it affects the pull-out resistance of the anchorage. This study examined the effect of four parameters, related to anchorage geometry and embedded ground conditions, on the pull-out resistance in the gravity-type anchorage through two-dimensional finite element analysis, and presented a guide for major design variables. The four parameters include the 1) flight length of the stepped anchorage (m), 2) flight height of the stepped anchorage (n), 3) the anchorage heel height (b), and 4) the thickness of the soil (e). It was found that as the values of m increased and the values of n decreased, the pull-out resistance of the gravity-type anchorage increased. This trend is related to the size of the contact surface between the anchorage and the rock, and it was confirmed that the value of n, which has the largest change rate of the contact surface between the anchorage and the rock, has the greatest effect on the pull-out resistance of the anchorage. Additionally, the most effective design was achieved when the ratio of the step to the bottom of the anchorage (m) was greater than 0.7, and m was found to be an important factor in the pull-out resistance behavior of the anchorage.

Effective Control in Managing German Cockroach, Blattella germanica (Orthoptera: Blatellidae) Using a Push-Pull Strategy (기피-유인을 이용한 바퀴의 효율적 방제)

  • Yang, Jeong-Oh;Kim, Sang-Woo;Noh, Doo-Jin;Yoon, Chang-Mann;Kang, Shin-Ho;Kim, Gil-Hah
    • The Korean Journal of Pesticide Science
    • /
    • v.12 no.2
    • /
    • pp.162-167
    • /
    • 2008
  • To enhance the control efficacy against cockroaches in dwelling space, repellent ("Push") was set down on one comer and a poison bait including attractant ("Pull") was on the opposite side. And we tested the control efficacy of Push-Pull strategy by behavior-stimuli of cockroaches. In a mini-field test, German cockroach males primarily chose shelters nearest to the attractant-treated surfaces and farthest from the repellent-treated surfaces. The consumption of food or bait was also highest from food nearest to the preferred shelters by push-pull effect. We evaluated the push-pull insecticidal efficacies of five essential oils belong to Citrus plant, namely, grapefruit, lemon, lime, orange, and petitgrain. The combined push-pull treatments appeared to be faster and higher insecticidal effects than single (pull) treatment, and the repellent efficacy of Citrus oils was in the order of grapefruit > lemon > lime > orange > petitgrain. Therefore, we propose the effective control of the german cockroach using Citrus oils as repellents and push-pull method into a limited area.

An analysis of the Behaviour of Uplift-Resisting Ground Anchors from Pull-out Tests (현장시험을 통한 부력앵커의 거동분석)

  • Lee, Cheolju;Jun, Sanghyun;Yoo, Namjae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.1
    • /
    • pp.33-40
    • /
    • 2007
  • Engineering behaviour of uplift-resisting ground anchors constructed in weathered rocks has been investigated by carrying out a series of full scale pull-out tests. The anchor was to resist uplift forces (buoyancy) associated with high groundwater table acting on the basement of a rail way station. The study has included the ultimate pull-out capacity of the anchors and shear stress transfer mechanism at the anchor-ground interface. The pull-out tests were conducted by changing bonded lengths of the anchor (2~7 m) and diameter of drilled borehole (108~165 mm) to investigate their effects on the behaviour of the anchor. The measured results showed that the ultimate capacity of the anchors was increased with an increase in the bonded length, diameter of drilled borehole as expected. The ultimate capacity of the anchors deduced from the pull-out tests ranged from 392 to 1,569 kN, depending on the above-mentioned factors. This corresponds to the interface shear strength of about 227~505 kPa. Interface shear stresses deduced from the pull-out test showed that the larger the pull-out force, the larger the mobilisation of the interface shear strength. The failure mode of the anchors heavily depended on the bonded lengths of the anchors. When the bonded length was short (2~3 m), a cone-type failure was observed, whereas when the bonded length increased (5~7 m), failure developed at the grout-ground interface.

  • PDF

Estimation of Pull-out force by using modified Direct Shear Apparatus (개설된 직접전단시험기(CNS)를 이용한 보강재의 인발력 추정)

  • 유병선;이학무;장기태;한희수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.145-154
    • /
    • 2003
  • When a nail pulled out in dense, granular soil, the soil in the vicinity of the nail tends to dilate, but its dilatancy results in a normal stress concentration at the soil/nail interface, thereby increasing the pull-out resistance of the inclusion. It is thought to be occurring within the resistance zone where the soil mass is at stationary state and the reinforcement are held in position by the soil, due to the friction or bond. In this paper, A series of direct shear and interface tests were conducted by using so called‘Constant Normal Stiffness Test Apparatus’which was modified and improved from the conventional direct shear box test rig. Unlikely the normal shear box test, this enables to simulate the different constraint effects of surrounding soil during shear under the conditions of constant stress and volume, constant normal stiffness. The aim of the research programme is to get better understanding of pull-out bond mechanism, thus to explore the possibility of evaluating the pull-out bond capacity of soil/reinforcement at the preliminary design stage from the laboratory test.

  • PDF

A Study on the Problem and Improvement Plan of Pull Test Method and Test Result Judgment of Rock Bolts Usage for Tunnel Construction (터널 공사용 록볼트의 인발 시험 방법 및 시험 결과 판정시의 문제점과 개선방안에 관한 연구)

  • Jang, Suk-Jae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.135-140
    • /
    • 2005
  • In case of rock bolt useable by tunnel reinforcement methods at field is applied problem of typical rock bolt pull test diagram method propositional in documents and is not thesis of clearness analysis basis about result of rock bolt pull test. So this paper suggested in consideration of foreign basis and field condition that the first, "suggestion of apposite diagram method at tight ground and difference application of rock bolt pull test method at loose and tight ground" and the second, "thesis of estimation basis non-thesis of design and specification, test etc".

Evaluating the pull-out load capacity of steel bolt using Schmidt hammer and ultrasonic pulse velocity test

  • Saleem, Muhammad
    • Structural Engineering and Mechanics
    • /
    • v.65 no.5
    • /
    • pp.601-609
    • /
    • 2018
  • Steel bolts are used in the construction industry for a large variety of applications that range from fixing permanent installations to temporary fixtures. In the past much research has been focused on developing destructive testing techniques to estimate their pull-out load carrying capacity with very little attention to develop non-destructive techniques. In this regards the presented research work details the combined use of ultrasonic pulse velocity and Schmidt hammer tests to identify anchor bolts with faculty installation and to estimate their pull-out strength by relating it to the Schmidt hammer rebound value. From experimentation, it was observed that the load capacity of bolt depends on its embedment length, diameter, bond quality/concrete strength and alignment. Ultrasonic pulse velocity test is used to judge the quality of bond of embedded anchor bolt by relating the increase in ultrasonic pulse transit time to the presence of internal pours and cracks in the vicinity of steel bolt and the surrounding concrete. This information combined with the Schmidt hammer rebound number, R, can be used to accurately identify defective bolts which resulted in lower pull-out strength. 12 mm diameter bolts with embedment length of 70 mm and 50 mm were investigated using constant strength concrete. Pull-out load capacity versus the Schmidt hammer rebound number for each embedment length is presented.