• Title/Summary/Keyword: public wastewater treatment plant

Search Result 51, Processing Time 0.03 seconds

A study on the composition validity of performance indicators for public sewage treatment plant by using factor analysis (요인분석기법을 활용한 공공하수처리시설 성과평가 지표의 구성 타당성 연구)

  • Yoon, Cheon-Yeo;Koo, Ja-Yong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.5
    • /
    • pp.583-590
    • /
    • 2015
  • Evaluation and comparison for the performance on the contracting-out became possible after the introduction of the performance indicators(PIs) in 2012 in Korea, And local governments and private companies are utilizing them as evaluation data to enhance the performance of the contracting-out. Several revisions on performance indicator were carried out by expert group on contents validity of PIs, But the review of the composition validity of PIs was not sufficient. In this study, the applicability, distinction ability and composition validity of PIs is evaluated by statistical method. From the results, Improvement of indicator is required in order to increase the interrelationship among indicators to enhance the compostion validity of indicators related with operation, sludge and water reuse.

Evaluation of Toxicity Influenced by Ion Imbalance in Wastewater (폐수에서 이온불균형문제가 생태독성에 미치는 영향 평가)

  • Shin, Kisik;Kim, Jongmin;Lee, Soohyung;Lee, Jungseo;Lee, Taekjune
    • Journal of Korean Society on Water Environment
    • /
    • v.34 no.1
    • /
    • pp.77-83
    • /
    • 2018
  • This paper aims to evaluate the results of toxicity testing with Daphnia magna and Vibrio fischeri on wastewater samples which might be influenced by ion imbalance. The effluents from factories were found to be more toxic with high salinity levels than those from public wastewater treatment plant (WTP) and sewage treatment plant (SWP). Clion composition was highest in the effluent, in terms of percentage, which was followed by $Na^+$, $SO_4^{2-}$ and $Ca^{2+}$. $K^+$ and $Mg^{2+}$ ion was relatively low. The sensitivity of D. magna test results was higher than V. fischeri. Among samples which were proved by V. fischeri testing to be nontoxic, the composition ratio of each ion whether toxic samples or nontoxic samples which were decided by D. magna toxicity testing, were compared. $Na^+$, $K^+$, $Ca^{2+}$, $Mg^{2+}$ ion composition ratio showed high level in nontoxic samples whereas $SO_4^{2-}$ and $Cl^-$ ion composition ratio was high in toxic samples. Accordingly, $SO_4^{2-}$ and $Cl^-$ ion seemed to be considered the ions causing toxicity in effluent. Toxicity from some categories of industries (Mining of non-metallic minerals, Manufacture of basic organic petrochemicals, Manufacture of other basic organic chemicals, Manufacture of other chemical products etc.) seemed to be influenced by salinity. The Ion concentration in influent and effluent were similar. Concentration of $Na^+$, $Cl^-$, $K^+$, $Ca^{2+}$ ions were high in influent, however $Mg^{2+}$ and $SO_4^{2-}$ ions were high in effluent.

Bioindicator in Advanced Wastewater Plants (고도처리장의 Bioindicator)

  • Lee Chan-Hyung;Moon Kyung-Suk;Jin Ing-Nyol
    • Microbiology and Biotechnology Letters
    • /
    • v.33 no.1
    • /
    • pp.56-64
    • /
    • 2005
  • The occurrence and abundance of protozoa at advanced wastewater treatment plant were compared with operating parameters and effluent quality using statistical procedures. It seemed that plant operating conditions influenced the distribution of protozoa in the mixed liquor. In statistical analysis, the distribution of protozoa showed the operating condition of plant and predicted effluent quality. Once enough data concerning protozoa, operating parameters and effluent has been gathered, the operator has a valuable tool for predicting plant performance and near-future effluent quality based on microscopic examination. Plant operator manipulates operating conditions if he knows near-future effluent quality is deteriorating. Perhaps more importantly it can be used to actually control the plant to adjust the operating conditions to obtain the protozoal populations that have been shown to provide the best effluent quality.

Efficiency of Livestock Farming Wastewater Treatment by Trickling Filters (撒水濾床法에 依한 畜産廢水의 處理效果에 관한 연구)

  • Ahu, Soo Mi
    • Journal of Environmental Health Sciences
    • /
    • v.11 no.2
    • /
    • pp.17-27
    • /
    • 1985
  • The objectives of this study is to examine efficiency of swinery wastewater treatment by trickling filters' pilot plant. The results of this study are as follows: 1. The characteristics of sample. The BOD$_5$ was from 2,450 to 2,880mg/l, COD(KMnO$_4$ acid method) was from 910 to 1,064mg/l, and SS was from 920 to 990mg/l. The pH of influent was from 7.3 to 7.6, and the temperature of water was from 17.0$\circ$C to 22.5$\circ$C. 2. For experiment by recirculation, the BODs removal efficiency is 65.2% at recirculation ratio (r)=0, and 70.7% at r=1. The ramoval efficiency of this study is higher than NRC formula of U.S.A.. The recirculation is not significant effect on removal efficiency. 3. For experiment by hydraulic load, the BOD$_5$ removal rate decreased from 73.1% at $3.1m^3/m^2\cdot d$ to 65.3% at $9.2m^3/m^2\cdot d$. The design formula of this study which shows the removal rate of soluble BOD is $Le/Li =10^{-0.24} D/Q^{0.24}$ (Q: hydraulic load, D: depth of filter). 4. For experiment by organic load, the BOD$_5$ removal rate is increased from 70.2% at $0.77kg/m^3\cdot d$ to 75.4% at $4.28kg/m^3\cdot d$. We can obtain the straight line y=0.749 x (y: removed BOD, x :applied BOD) by the least squares method. 5. We can know that trickling filters is strong with the hydraulic load and the organic matter shock load. Here, we can judge that trickling filters is a good method for the treatment of swinery wastewater which containing high concentrated organic matter.

  • PDF

Discharge Standards of Kitchen-Disposer Wastewater by Treatment Types (디스포저(부엌용 오물분쇄기)-배수 전처리 방식 별 수질기준)

  • Chang, Ho Nam;Jeong, Chang Moon;Kang, Jong Won;Choi, Jin-dal-rae;Park, Young Sook;Ku, Ja-Kong
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.19 no.2
    • /
    • pp.55-69
    • /
    • 2011
  • Use of disposer at the kitchens of Korean apartments is inevitable in treating their foodwaste having a water content of more than 80%. Also we have to ensure that this extra disposer-foodwaste BOD loadings be treated properly by installing/operating a pre-treatment system before this wastewater enters public sewer system. However, the degree of BOD removal should not be excessive since a BOD/N ratio higher than 5 is required for removing N/P at a municipal wastewater treatment plant. The removal of BOD/N in the pretreatment system rather than BOD alone can be an alternative solution in solving this problem. The particles separated by sedimentation, screen or packed-bed can be anaerobically digested at apartment sites to generate biogas that can be used for simple digester heating and to generate volatile fatty acids (VFAs) for nitrogen removal. We suggest that Korean government grants a temporary license (say for 5 years) to foodwaste treatment companies in collaboration with apartment construction companies which may do business and develop various kinds of disposer-foodwaste treatment systems in diverse wastewater discharge systems of Korean apartments.

A research on the design parameters for a double-transmission main system for sustainable water supply (이중송수관로를 이용한 안정적인 송수를 위한 설계인자에 관한 연구)

  • Hyun, Inhwan;Hong, Juneui;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.129-138
    • /
    • 2013
  • Water interruption is often caused by a rupture in the branch-like singular pipeline. This will cause critical complaints from household and may decrease public service quality. As an alternative of singular pipeline, additional parallel pipeline could be installed for sustainable water supply. This system is called double pipeline system and able to be utilized for water transmission line between treatment plant and distribution reservoir. Construction of double pipeline was thought to increase capital cost, which can be an issue to waterworks authorities. Reducing capital cost was possible by means of installing connectors between two parallel pipelines because of reduced diameter of each pipe. To obtain optimal design condition for connectors, it was necessary to compare water pressure according to accident location, to investigate flow according to connection pipe spacing, connection pipe diameter, and aging of pipe. Reliable and economical connection layouts were determined based on these results. The cost estimation for each design condition was carried out. Cost was approximately reduced by 20 ~ 30 % compared to the double pipeline without connections. In addition to this, connection between double pipelines could expect extra benefits for maintenance since the pipe could be repaired and rehabilitated without interruption.

Fates and Removals of Micropollutants in Drinking Water Treatment (정수처리 과정에서의 미량오염물질의 거동 및 제거 특성)

  • Nam, Seung-Woo;Zoh, Kyung-Duk
    • Journal of Environmental Health Sciences
    • /
    • v.39 no.5
    • /
    • pp.391-407
    • /
    • 2013
  • Micropollutants emerge in surface water through untreated discharge from sewage and wastewater treatment plants (STPs and WWTPs). Most micropollutants resist the conventional systems in place at water treatment plants (WTPs) and survive the production of tap water. In particular, pharmaceuticals and endocrine disruptors (ECDs) are micropollutants frequently detected in drinking water. In this review, we summarized the distribution of micropollutants at WTPs and also scrutinized the effectiveness and mechanisms for their removal at each stage of drinking water production. Micropollutants demonstrated clear concentrations in the final effluents of WTPs. Although chronic exposure to micropollutants in drinking water has unclear adverse effects on humans, peer reviews have argued that continuous accumulation in water environments and inappropriate removal at WTPs has the potential to eventually affect human health. Among the available removal mechanisms for micropollutants at WTPs, coagulation alone is unlikely to eliminate the pollutants, but ionized compounds can be adsorbed to natural particles (e.g. clay and colloidal particles) and metal salts in coagulants. Hydrophobicities of micropollutants are a critical factor in adsorption removal using activated carbon. Disinfection can reduce contaminants through oxidation by disinfectants (e.g. ozone, chlorine and ultraviolet light), but unidentified toxic byproducts may result from such treatments. Overall, the persistence of micropollutants in a treatment system is based on the physico-chemical properties of chemicals and the operating conditions of the processes involved. Therefore, monitoring of WTPs and effective elimination process studies for pharmaceuticals and ECDs are required to control micropollutant contamination of drinking water.

Emergence of New Business Mode in the Chinese Water Market - Hefei Wangxiaoying Wastewater TOT Project -

  • Lee, Seung-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.20-20
    • /
    • 2011
  • The purpose of this research aims to evaluate the emergence of new business mode in the Chinese water market since the mid-2000s - Transfer-Operate-Transfer(TOT) Projects. The study pays special attention to the case of the Hefei Wangxiaoying Wastewater Treatment TOT Project, which was awarded to the consortium of Berlin Water International and its Chinese partner in late 2004. The consortium secured an exclusive operating right for 23 years on the basis of a TOT scheme and would take responsibility of all the profits and losses in the operation of the plant. The total investment for the transfer amounted to RMB 491 million(US$70 million). The price was more than 288% of the original value, RMB 170 million (US$24 million). The project can be regarded as a successful case because of the following three causes. First, the Hefei government followed a series of standardized procedures in the international bidding, which ignited best-performed international players' competition for the project. Second, the project will bring in cutting-edge operation skills and management know-how. Third, the government succeeded in raising public asset values, and thanks to this, the government is able to consider other similar projects not only in the water sector but also other sectors in public utility services. Nevertheless, Berlin Water's point of view, there are several challenges. First, the company took a risk to pay such a large amount of cash to the Hefei government. Although such premium can be recouped in the operation period of 23 years, whether or not the company would be able to recover the initial investment and realize profits is in question due to an uncertainty of socio-political circumstances in China. Second, Berlin Water should expect a steep rise of water tariffs over the contract period in order to get the investment back. Water pricing is still a sensible matter to Chinese authorities, and therefore, it is uncertain if such rise of water tariffs would be possible. Third, the TOT mode leads to creation of a large amount of cash to government officials, which might have caused corruption between those who are involved in TOT deals. Then, the final contract fee would soar, which often results in the burden of normal customers. As discussed, the TOT mode has drawn much attention of foreign investors as a new alternative to enter into the Chinese water market. But it is important to note that foreign investors should be aware of possible risks in water TOT projects, which reflects some features of the Chinese political economy landscape and social norms. The Hefei case indicates that benefits can overshadow risks in TOT projects, which will continue to attract foreign investors that are dedicated to establishing their strongholds in the Chinese water market.

  • PDF

A Study on the Regulatory Effect of the Special Water Preservation Area of Lake Paldang Watershed Based on Long-Term Variation of Pollutant Source and Water Quality (수질과 오염원의 장기적 변화를 통한 팔당호 상수원수질보전 특별대책지역 규제효과 분석)

  • Kim, Ho-Sub;Park, Yun-Hee;Kim, Yong-Sam;Kim, Sang-Yong
    • Journal of Korean Society on Water Environment
    • /
    • v.35 no.1
    • /
    • pp.43-54
    • /
    • 2019
  • The objective of this study was to assess the effect of policies on water quality management based on the changes in pollutants and water quality in Special Water Preservation Area (SWPA) of Lake Paldang watershed from 1990 to 2016. The population, total sewage and flow rate of wastewater in SWPA continuously increased from 1990 to 2016, while the location of new facilities for industrial and livestock facilities has been restricted. However, unlike the buffer zone in which industrial and livestock facilities were continuously reduced after implementing of TMDL, it was found that the effect of land-use regulations on industrial and livestock facilities in SWPA were mitigated by the increase in the size of large facilities. Since 1999 when the emission standard of public sewage treatment plants (STP) was changed, the water quality of Lake Paldang has increased despite the increase of pollutant source. Since emission standard of STP changed in 2012 (BOD 5 mg/L, TP 0.2 mg/L), BOD concentration in Lake Paldang has also improved to the level of water quality in the early 1990s where as TP concentration has remained at its lowest since 1990. BOD and TP average discharge concentration of 43 STP (${\geq}500m^3/day$) in 2016 have been maintained $1.7{\pm}0.7mg/L$ and $0.06{\pm}0.02mg/L$ respectively. While the discharged load of STP in SWPA was decreased by the concentration management, the contribution rate to the total discharged load of non-point pollutants increased to 70 % in 2015, and the contribution rate to the point discharged load of individual treatment facilities increased to 80 %.

Study on the Performance of Constructed Wetland System for Sewage Treatment (인공습지 오수처리시설의 처리성능에 관한 연구)

  • 윤춘경
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.4
    • /
    • pp.96-105
    • /
    • 2000
  • Field experiment was performed from August 1996 to December 1999 to examine the performance of constructed wetland system for wastewater treatment in rural area. The constructed wetland system was installed in Konkuk University and the effluent from septic tank of school building was used as an influent to the treatment basin. The treatment basin was composed of sand bed with planted reed. From August 1996 to June 1998 the hydraulic loading rate was fixed with about 15.63cm/day and theoretical detention time was 1.38 days, and from July 1998 to December 1999 the hydraulic loading rate was about 6.25cm/day and theoretical detention time was 3.5days. It worked continuously even during winter time, and the sewage flowed without freezing even when average daily air temperature was below -1$0^{\circ}C$. Average removal rate of BOD , COD, and SS was about 70%, T-P removal rate was about 50.8% , and T-N removal rate was 23.9%. The reason for poor T-N removal might be due to high influent concentration and short retention times. At the later years BOD and COD removal rates were increased , and SS and T-P removal rates did not change significantly , but T-N removal rates were decreased. The effluent of the wetland system often effluent water quality standards for sewage treatment plant, therefore, further treatment would be required if the effluent need to be discharged to the public water. Wetland system involves relatively large land area and could be suitable for rural area. Therefore, utilization of reclaimed sewage for agricultural purpose or subsequent land treatment is recommended as a ultimate disposal of sewage for agricultural purpose or subsequent land treatment is recommended as a ultimate disposal of sewage in rural area.

  • PDF