• 제목/요약/키워드: public project

검색결과 2,134건 처리시간 0.03초

Analysis of Factors Affecting Economic Feasibility of Long-term Public Rental Housing Reconstruction Project

  • Joe, Won Goog;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제24권3호
    • /
    • pp.85-91
    • /
    • 2022
  • The public rental housing policy aims to provide the housing to the vulnerable class who do not have enough credit to own houses. The Korean government introduced new policies for housing supply to improve the availability of new houses. However, it is difficult to expand the supply because of the accumulated deficit of public rental housing. In this study, the economic feasibility of long-term public rental housing reconstruction projects was examined to ensure the economic and sustainable growth of public rental housing. The research found that the compensation for the accumulated deficit is needed. Also the research analyzed and identified the factors affecting the economic feasibility of reconstruction projects. The significant factors identified in this research are: the supply price of pre-sale/rental housing in the reconstruction project, total cost of the reconstruction project, and total floor area of the reconstruction project. According to the analysis results, it is necessary to increase the rent of existing long-term public rental housing, expand the government subsidy, increase the supply price of pre-sale/rental housing, and reduce the total project cost. However, there are limitations. For example, the fluctuations of construction market, residents' burden of housing costs, and the limit of the budget of the public housing authority. The increasing total Floor Area Ratio(FAR) limitation of the reconstruction project would be the realistic solution to the problem because it gives incentives to the reconstruction project.

공공부문 IS 개발 프로젝트 손실요인에 대한 현장연구: 프로젝트 관리를 중심으로 (A Field Study on the Loss Factors of IS Development Project in the Public Sector: Perspectives of Project Management)

  • 장성봉
    • 한국IT서비스학회지
    • /
    • 제3권2호
    • /
    • pp.65-84
    • /
    • 2004
  • This research analyzes the causes of delay and resulting additional expenses on the IS project in the public sector, and then proposes some solutions to the problem. Through a field study, the research found that the causes include employer's attitude, the leadership and risk management ability of the project manager, and qualifications of project members. In order to avoid those problems, the project manager should secure various communication channels and good relationship between the employee and the contractor.

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

민관합동형 PF사업의 단계별 리스크 분류 및 위험도분석 (Risk Analysis and Classification of Public-Private Partenership in Project Financing Process)

  • 박혜성;김선국
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.117-126
    • /
    • 2011
  • 공공-민간 합동개발 형태의 사업방식으로 시행하는 민관합동형 PF(Project Financing)사업은 2001년 도입이후 급격한 양적 증가를 가져왔으나 2008년 글로벌 금융위기 이후 심각한 침체국면을 맞이하게 되었다. 본 연구에서는 공공시설물 PF 사업의 실 사례를 바탕으로 리스크요인을 도출하고 프로젝트 진행 단계별로 리스크를 분류하여 분석하는 것이며, 단계별 리스크 요인의 위험도 및 중요도를 해당분야 실무자의 설문조사를 토대로 측정하고 리스크인자의 위험도를 산출하였다. 본 연구결과는 사업추진시 각 단계별 리스크인자를 인지하고, 리스크요인의 위험도에 따른 대응전략 수립 및 리스크 관리에 활용 되기를 기대한다.

선보상-후시공 제도의 공공건설사업 파급효과 분석 (Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects)

  • 김상범;최정원
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.245-254
    • /
    • 2004
  • '선보상-후시공 제도화' 대책은 1999년 「공공건설사업 효율화 종합대책」의 세부 대책으로서 공공건설 사업비용 $90\%$ 절감을 목표로 수행되었다. 이에 본 연구에서는 대책의 성과를 측정하고 분석하여 향후의 개선 사항 및 제안을 위해, 종합대책 이전과 이후로 구분하여 관련 자료를 분석함으로써 대책에 대한 성과 분석 연구를 수행하였다. 이러한 성과의 분석은 사업비와 사업기간의 관점에서 정량적인 성과 측정을 중심으로 이루어 졌으며, 선보상-후시공 제도화 대책의 성과로 인한 종합대책의 전체성과에 대한 기여도와 향후 제안 사항 등을 기술하였다. 연구 결과 본 대책은 약 $4.83\%$의 공공건설 예산 절감효과가 있는 것으로 분석되었으며, 공기 절감 면에서도 긍정적 파급효과가 있는 것으로 나타났다.

Fuzzy AHP를 이용한 프로젝트 특성과 공공갈등 특성 간의 영향 관계 중요도 분석 (Analyzing Relationships Between Project Characteristic and Public Conflict Characteristic in Public Construction Using Fuzzy Analytical Hierarchy Process (FAHP))

  • 박성준;이창준;한승헌;윤성민
    • 한국건설관리학회논문집
    • /
    • 제21권1호
    • /
    • pp.70-77
    • /
    • 2020
  • 국내에서 발생하는 공공갈등은 증가 추세이며, 갈등으로 인한 직·간접 피해가 크기 때문에 이를 줄이고자 다양한 연구가 진행되고 있다. 그러나, 기존 연구들은 갈등자체에 보다 중점을 두고 있어 갈등으로 인한 건설사업에 대한 영향에 대한 연구는 미흡한 실정이다. 또한, 대부분의 공공갈등은 대형 SOC 사업과정에서 발생하기에, 프로젝트 특성을 고려한 갈등연구가 필요하다. 따라서 본 연구에서는 프로젝트 특성과 공공갈등 특성 간 영향 관계의 중요도를 파악하였다. 문헌고찰과 전문가 자문을 통해 프로젝트와 공공갈등의 대표 특성을 4개씩 선정하였고, 두 집답의 특성 간 영향 관계 중요도를 Fuzzy AHP를 이용하여 분석하였다. 그 결과, 프로젝트 특성 중 SOC 건설사업 유형이 전반적 갈등특성에 가장 큰 영향을 미쳤다. 갈등특성 중 특히 갈등요인과 갈등단계가 건설사업 유형과의 영향 관계 중요도가 높게 나왔다. 본 연구결과를 통해, 프로젝트 특성에 따라 달라지는 갈등의 특성들을 고려한 갈등관리방안 수립할 수 있을 것으로 기대된다.

공공보건조직을 통한 농촌지역 초등학교 불소양치사업 개발에 관한 연구 (1) (A Study on the development for the primary school fluoride mouthrinsing project through the public health system in a rural area)

  • 최진수;홍석진;황민홍;이상대;정성숙
    • 농촌의학ㆍ지역보건
    • /
    • 제21권2호
    • /
    • pp.221-230
    • /
    • 1996
  • This study was purposed to develop the fluoride mouthrinsing project through the public health system in a rural area. This project was performed under the management of the public health dentist for the 3rd grade students selected from the 5 primary schools at Goksunggun in Chonnam area. Fluoride mouthrinsing was executed with 0.2% neutral sodium fluoride solution once a week. After 1 year's fluoride mouthrinsing project, DMFT index, DMF rate frequencies of toothbrushing, simplified oral hygiene index, and the responses to fluoride mouthrinsing project of the school children participated were examined. The results obtained from this study were as follows: 1. The fluoride mouthrinsing project for school children was performed average 10 times a year by the public health dentist. They were relatively little active to perform this project. 2. There was no significant difference in the increasement of DMFT index and DMF rate during 1 year between control and fluoride mouthrinsing group. 3. Control group was increased higher than fluoride mouthrinsing group in simplified oral hygiene index. 4. Toothbrushing frequencies increased in both groups. 5. 80.4% of school children participated in fluoride mouthrinsing project was responded to like it, and 78.2% among them was responded the project to be beneficial for their dental health. 6. 39.2% of school children was responded to have water-like taste for fluoride solution. But 34.0% of them was done to have strange taste. On consideration of above findings, this fluoride mouthrinsing project was not well performed by the public health dentists and also the oral health status of school children participated was not significantly improved by this project. Therefore, to perform continually this project well, it was recommended that this project should be performed by other person such as dental hygienist rather than public health dentist.

  • PDF

환경성 질병부담을 활용한 생활공감 환경보건기술개발사업 건강 편익 평가 및 제언 (Evaluation of Health Benefit from the Environmental Health Action Program Based on the Environmental Burden of Disease)

  • 최용수;변가람;이종태
    • 한국환경보건학회지
    • /
    • 제48권2호
    • /
    • pp.123-129
    • /
    • 2022
  • Background: The Environmental Health Action Program was a national project carried out from 2012~2021. It was aimed at developing public technologies to protect people's health from various environmental hazards. Objectives: One of the final goals of the project was "creating health benefits worth more than 179.2 billion won by reducing the environmental burden of disease." This study aims to evaluate whether the program sufficiently achieved the planned benefits. Methods: In order to secure consistency in evaluation, we applied the same equation used in the goal-setting process. It is comprised of six parameters to estimate the benefit: 1. The amount of medical expenses for environmental diseases; 2. The attributable proportion of environmental risk factors' 3. The rate of reduction in medical expenses for environmental diseases; 4. R&D project contribution; 5. The proportion of successful policy reflection; and 6. The contributions of the project. The corresponding variables were estimated at the end of the project, and the health benefits of the project were recalculated using the newly estimated variables. Results: It was estimated that a total of 195 billion won in health benefits occurred or will occur from 2015 to 2026. The main contributors for achieving the target were an increase in medical expenses for environmental diseases, a high score in the R&D project contribution, and the proportion of successful policy reflection. Conclusions: Technically, the equation used in the project is about medical expenses for environmental diseases rather than about the environmental burden of disease. There are several benefits of using the environmental burden of disease in the evaluation of public health policies. In further studies, developing a policy evaluation framework using indicators such as population attributable fraction would be needed.

온라인 뉴스 기반 공공건설사업 갈등지수 산정에 관한 기초연구 (A Study for Conflict in Public Construction Projects Based on Online News)

  • 백승원;한승헌;윤성민;임종록;남지현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.277-278
    • /
    • 2021
  • Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.

  • PDF

주민참여제도를 전후한 환경영향평가서의 비교분석 (A Comparative Analysis of Environmental Impact Statement before and after Public Participation)

  • 방규철;한의정
    • 환경영향평가
    • /
    • 제4권2호
    • /
    • pp.151-156
    • /
    • 1995
  • Public participation in Environmental Impact Assessment (EIA) process has been implemented since the introduction of EIA project on August 1 1991, followed with Environmental Policy Act promulgation on August 1 1990. Though public participation has room for improvement. This study compared before and after the introduction of public participation on EIS preparation cost, project cost, EIS preparation term and project term through 293 EISs analysis. Also public opinions in EIS after introduction of public participation were analyzed. The results are expected to be contributed to the system improvement of public participation.

  • PDF