A Research for Clustering of Conflict in Public Construction Project (군집분석을 통한 공공 건설사업 갈등 유형화 연구)

  • Lee, Jiseop;Kim, Doyun;Lee, Changjun;Lee, Jeonghun;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.61-72
    • /
    • 2018
  • Conflicts in public construction projects lead to increase social costs as well as construction costs and schedule delay. Therefore, it is important to evaluate the conflict in construction project and find appropriate solutions based on previous cases. In this research, the conflict factors and criteria for evaluating conflict are derived and 30 cases are evaluated by 11 conflict experts. Using k-means clustering, the cases are clustered by three clusters. The cases were analyzed according to the characteristics of each cluster and labeled as 'NIMBY and harmful facility conflict cluster', 'environmental and pollution conflict cluster', and 'PIMFY and small conflicts'. In the future, when conflict occurs in the public construction projects, the conflict can be evaluated using this clustering and the characteristics of the conflicts can be found. As a result, it will be helpful to mitigate the conflict quickly and effectively by looking for previous cases that are suitable for resolving the conflict through appropriate clusters.

Application of Probabilistic Risk Analysis for Profitability-Evaluation of Apartment Reconstruction Projects (아파트 재건축사업의 수익성평가에 대한 확률적 위험도 분석 모형 적용방안)

  • Woo, Kwang-Min;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.167-176
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

Application of Selective Construction Management Services to Private Small-Medium Construction Projects (${\cdot}$ 소규모 건축공사의 선택적 건설사업관리 적용 방안)

  • Kim, Seong-Hwan;Mun, Kyung-Jick;Woo, Yu-Mi;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.305-309
    • /
    • 2006
  • Construction management system has been needed to be anchored and revitalize in these days, since it was entered into a domestic market. We could consider application of CM services as a challenge of construction project system and a way to get to an advanced nation in construction field. Application of CM services could be possible in public projects by a regime. However, in case of private construction projects, it is hard to apply it without understanding of substantial necessity and propriety. so in this study, we find a application method of CM services to private small-midium construction projects, and make CM services item table of CM services for revitalization by examining the cases that applied to in private small-medium construction projects.

  • PDF

Exploring Critical Risk Factors of Office Building Projects

  • NGUYEN, Phong Thanh;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.309-315
    • /
    • 2021
  • Risks and uncertainty are unavoidable problems in management of projects. Therefore, project managers should not only prevent risks, but also have to respond and manage them. Risk management has become a critical interest subject in the construction industry for both practitioners and researchers. This paper presents critical risk factors of office building projects in the construction phase in Ho Chi Minh City, Vietnam. Data was collected through a questionnaire survey based on the likelihood and consequence level of risk factors. These factors fell into five groups: (i) financial risk factors; (ii) management risk factors; (iii) schedule risk factors; (iv) construction risk factors; and (v) environment risk factors. The research results showed that critical factors affecting office building projects are natural (i.e., prolonged rain, storms, climate effects) and human-made issues (i.e., soil instability, safety behaviors, owner's design change) and the schedule-related risk factors contributed to the most significant risks for office buildings projects in the construction phase in Ho Chi Minh City. They give construction management and project management practitioners a new perspective on risks and risk management of office buildings projects in Ho Chi Minh City and are proactive in the awareness, response, and management of risk factors comprehensively.

A Study on the Prediction of Civil Construction Cost on Apartment Housing Projects at the Early Stage (사업 초기단계에서 공동주택 토목공사비의 예측에 관한 연구)

  • Ha, Kyu-Soo;Lee, Jin-Kyoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4284-4293
    • /
    • 2012
  • At the early construction project stage, the most important task is to estimate planned construction costs analyzed with detailed information. Therefore, in this study, Apartment Housing Projects at the Early Stage of Civil Construction Cost of the reasonable and accurate predictions of the Regression analysis to 170 of actual Construction Cost, and dependent variable regression to Civil Construction Cost, location based national land area based on a combination of private land, union land, public land to the use of predictive models by various analyses of the ease and accuracy. As a result, Civil Construction Cost of Apartment Housing Projects by the regression formula for the error rate estimates in national land predictive model 15.59%, private land predictive model 17.53%, union land predictive model 21.86%, public land predictive model 13.08%.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

Architectural Design Process by the Changes of Sustainable Design Guidelines of Public Project (공공프로젝트 친환경 설계지침의 변화에 따른 건축설계프로세스 연구)

  • Tae, Yeong-Ran
    • Journal of the Korean Solar Energy Society
    • /
    • v.30 no.4
    • /
    • pp.63-70
    • /
    • 2010
  • This study introduce a architectural design process by the changes of sustainable design guidelines in public project. First of all, this study examines existing integrated design process studies performed by Rhee & U.B.C. Also, this study examines sustainable guidelines which demanded by public building projects. Then, this study introduces sustainable design process using existing sustainable design process, and shows that how to operate and proceed integrated design to satisfy the sustainable guidelines in practice. The results of this study are as follows. (1) Since 2007, sustainable design guidelines of bidding projects have been highlighted. (2) In public buildings, energy saving is very important issue. Especially energy certification demands 1st degree(under $300kWh/m^2{\cdot}yr$). (3) Inp ractice, integrated design team performed sustainable design using the sustainable design process to improve sustainable in public buildings.

An Empirical Study on the Effect of public Construction Industry by Expansion of New Budget System (계속비 사업 확대로 인한 공공건설사업 파급효과 분석)

  • Kim, Sang-Bum;Lee, Jeong-Dae;Cho, Ji-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.153-163
    • /
    • 2008
  • Domestic construction industry accounts about 15% of Gross Domestic Product(GDP) and Korean government spends approximately 50 trillion won per year for public infrastructure projects. Effective management of public construction projects would result in cost saving and enhance financial stability of the government. In doing so, the government promoted a new budgeting system, Continual Budget Method(CBM) as a part of public project performance enhancement program published in 1999. This research mainly attempted to investigate and analyze the impact of new budgeting in term of cost and schedule performance. Based on the analysis result of n2 projects. The new budgeting system could save project cost by 9.83y. Due to the saving of indirect costs from reduction. Although limited government budget cannot allow all the projects to be excuted with the new budgeting system, the new budgeting system should be more-widely utilized in the public sector because of its proven benefits from this research.