A Case Study on the Successful Old-Town u-City Construction by an Effective Financing (효과적인 재원조달을 통한 구도시 u-City 구축사례연구)

  • Park, Kwang-Ho;Kim, Myung-Dong;Kim, Yun-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.192-203
    • /
    • 2012
  • As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to 'Fundamental Construction Law of u-City,' u-City projects are classified into old-town and new-town types. However, most projects have focused only on the new-town type. Pushing forward large-scale land development projects, Korea Land and Housing Corporation (LH Co.) under Ministry of Land Transport and Maritime Affairs (MLTM) has gained a development profit out of the u-City infrastructure and then donated the infrastructure to a local government without making any plan for operations. In the process of u-City pilot projects, old-towns have been relatively ignored and various of unexpected problems have emerged. Building the u-City of an old-town is not easy due to many constraints such as huge initial investment, long validity and verification procedures, lack of useful services for citizens, lack of professional outsourcing methods for business promotion, high operating costs of the integrated control center, inadequate law related, insufficient institutional requirements and so on. This paper introduces a case study on u-City development for an old-town, Ansan City, as a private investment project. The case will help boost u-City projects for old-towns by solving their problems and providing an effective operational mechanism. As the first BTL (Build-Transfer-Lease) project for constructing u-City, 'Broadband Information Network Development Project' of Ansan City will provide a reference model of expanding u-City projects for other cities.

A Research Study on the Level of Satisfaction with the Farming and Fishing Village Housing Improvement Projects (농어촌주택개량사업 만족도 조사 연구)

  • Park, Heon-Choon;Kim, Seung-Keun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.16 no.4
    • /
    • pp.91-98
    • /
    • 2014
  • In this study, the current conditions of the farming and fishing village housing improvement projects that were promoted for the last five years were examined, the results of the survey conducted among the promoters of the farming and fishing village housing improvement projects with regard to their level of satisfaction were analyzed, and the outcomes of the housing improvement projects and the improvement needs were derived for utilization as basic data for preparing an improvement plan for "the farming and fishing village housing improvement projects". Below are the results of this study and the proposals based on such. In view of the reality that the recipients of the farming and fishing village housing improvement projects are limited to the rural residents who are able to repay their loans, ways of actualizing the current loan limit of 60 million won should be prepared, taking into account the actual construction cost. Moreover, as the rural residents do not live on monthly salaries, the repayment periods of their loans should be adjusted to make them payable on a quarterly or a semi-annual basis, reflecting the reality of the farming villages, where loan repayment is based on the residents' yearly income. Further, policies guaranteeing the residential rights of those belonging to the low-income bracket who are unable to repay their loans must be established at the soonest possible time. In view of the realities in the farming villages, where there are 640,000 houses that are over 31 years old, the supply of 10,000 houses as part of the housing improvement projects is grossly inadequate. Of course, it cannot be said that all the residents who are living in worn-out houses have the necessary conditions for receiving support from the housing improvement fund. Therefore, policies supporting the speedy improvement of worn-out houses and guaranteeing the residential rights of those belonging to the low-income bracket are urgently needed.

Software Size Measurement from Information Strategy Planning With the Function Point Method (정보전략계획 단계에서의 정보시스템 규모 예측:기능점수모형을 중심으로)

  • Bae, Joon-Soo;Jung, Jae-Yoon
    • The Journal of Society for e-Business Studies
    • /
    • v.14 no.3
    • /
    • pp.153-168
    • /
    • 2009
  • Many companies and governments perform information technology (IT) projections repeatedly for higher competitiveness and efficiency. Moreover, as the sizes of IT projects increase, the manpower and cost estimation of the projects are getting more important. In this research, we present a size estimation method of information system development projects on the basis of the function point method at the stage of information strategy planning(ISP), and illustrate the size calculation of an example IT project. According to the method, we first identify the types of projects, the scope and boundaries of size estimation, then count data and transaction functions from the artifacts of the ISP project. The unadjusted function points are adjusted to function point by the table of the Early Function Point. The way of calculating the sizes of IT projects will support successful IT projects by estimating reasonable manpower and cost for the projects.

  • PDF

Ordering of Project priorities For Open Market Portfolio (오픈마켓 포트폴리오 관리를 위한 프로젝트 우선순위결정)

  • Lee, Yong-Hee;Lee, Gun-Ho
    • The KIPS Transactions:PartD
    • /
    • v.18D no.4
    • /
    • pp.299-308
    • /
    • 2011
  • In the recent years, a variety of projects have been conducted in order to enhance competitiveness of leading businesses and their followers in the market. Accordingly, the importance of project portfolio management has risen in the open market industry. Project portfolio management refers to crucial decision-making processes which aim to maximize benefits by selecting projects most suitable for a strategic objective among multiple projects with limited resources. In this study, the trend of project portfolio management studies is introduced. The study also presents a mathematical model of the problem, which aims at maximizing project values, possibility, and similarity between projects in the limited resources. We use the genetic algorithm to obtain the priority orders of projects. In order to verify this study, we compare the results of this study and the existing schedules of the E-open market in South Korea. This study ultimately reduces project risks, improves efficiency of development and continuity of tasks by properly ordering projects and assigning developers to the projects.

A Study on the Practices of Landscape Planning & Design Services in Korea (조경계획.설계 기술용역의 수행실태에 관한 조사연구)

  • 권오준;심경구;김유일;고동완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF

Roles of NPO at Community-Building Project by Using Rural Vacant Houses - Focused on 'Vacant House Recreation Project of Japan's NPO Corporation' in Onomichi, Hiroshima (농촌지역 빈집 활용 마을만들기 추진과정에서 NPO의 역할 - 일본 NPO법인오노미치빈집재생프로젝트 사례로 -)

  • Woo, Jeong-Beom;Son, Yong-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.4
    • /
    • pp.1-12
    • /
    • 2014
  • This study has analyzed overseas projects of building rural communities using vacant houses. It is aimed at identifying the roles of NPO in the community-building projects and providing implications applicable to Korea. In recent years, there has been a spike in the number of vacant houses in rural areas. It is due to rapid urbanization and uneven distribution of the population across the country. Those are the reasons that prompted community-building projects. To solve the vacant house issue, there has been rising interest in building communities through vacant houses as rural resources and effectively integrating them as useful resources. However, the roles of key entity that pursues community-building projects using vacant houses have not been discussed sufficiently. Thus, this study deals with the 'Vacant House Recreation Project of NPO Corporation in Onomichi' in Hiroshima, Japan. Through the case study, the following are introduced as NPO's roles in community-building projects using vacant houses. First, pursuing promotion and attracting attention by making the utilization of vacant houses sensational; system improvement; offering information. Second, enhancing the perception of local residents by offering local services using vacant houses; offering community-building items. Third, forming a place of public discussion to solve conflicts during community-building projects using vacant houses; offering alternatives to building communities. Above all, such roles have led to the key status of NPO during its community-building projects using vacant houses. It offers the following implication for Korea: Future vacant house-related policies for rural revitalization should be done from community-building standpoint and include establishing the roles of NPO.

Optimal Sequencing of Water Supply Proiects by Dynamic Programming (동적계량법에 의한 용수공급시설의 최적화에 관한 연구)

  • 배상근;이순택
    • Water for future
    • /
    • v.14 no.2
    • /
    • pp.63-69
    • /
    • 1981
  • This Study is aimed at optimal sequencing of water supply projects for water demand from the application in water resources field of dynamic programming because a minimum present cost strategy for investment in water supply projects plays an important part of installation of some projects. In analysis, the relationships of the future water demand and numerous possible independent projects that are expected to meet water requirements up to some future data in Daegu city were used and future water demand were estimated from the exponential function method, the method used by the Water Works Bureau of Daegu City government which is a kind of geometric progression method and the mean value of these two methods. The results showed that the optimal sequencing of water supply projects using Dynamic Programming was reasonable and the changing of the estimation method of future water demand made a difference among optimal sequence of projects while the changing of annual rate of interest had influenced on present value cost only. In general, the best sequence for constructing the seven projects was the order of D-E-G-F-C-B-A, with the corresponding period for 33-38 years.

  • PDF

An Evaluation Study for APEC International Cooperation Projects : Focusing on the Perception of Participants (APEC 국제교육협력사업에 대한 성과평가 연구: 국제교육활동 참여자들의 인식을 중심으로)

  • Jang, Deok-Ho;Cha, Jungchan;Lee, Jeong-youn;Paik, Sunhee
    • Journal of Digital Convergence
    • /
    • v.17 no.11
    • /
    • pp.9-19
    • /
    • 2019
  • This study conducted the international evaluation of the APEC educational cooperation projects initiated by the Korean government and drew out strategies and tasks for their sustainable implementation. To this end, eight projects implemented by the Institute of APEC Collaborative Education were selected for the evaluation which examined participants' awareness of and the degree of participation in the eight projects as well as contribution to the intended outcomes of the projects. An online survey was conducted to participants of the eight projects and 283 experts and participants from 18 economies responded. The descriptive analysis found that the participants of ALCoB Cooperation Project reported the most positive perception of the awareness while the participants of the ALCoB Internet Volunteers showed the lowest degree of participation in and contribution to the intended outcomes of the project. Based on the results, several suggestions for further progress in Korea's APEC educational cooperation were made.

Exploration of Optimal Product Innovation Strategy Using Decision Tree Analysis: A Data-mining Approach

  • Cho, Insu
    • STI Policy Review
    • /
    • v.8 no.2
    • /
    • pp.75-93
    • /
    • 2017
  • Recently, global competition in the manufacturing sector is driving firms in the manufacturing sector to conduct product innovation projects to maintain their competitive edge. The key points of product innovation projects are 1) what the purpose of the project is and 2) what expected results in the target market can be achieved by implementing the innovation. Therefore, this study focuses on the performance of innovation projects with a business viewpoint. In this respect, this study proposes the "achievement rate" of product innovation projects as a measurement of project performance. Then, this study finds the best strategies from various innovation activities to optimize the achievement rate of product innovation projects. There are three major innovation activities for the projects, including three types of R&D activities: Internal, joint and external R&D, and five types of non-R&D activities - acquisition of machines, equipment and software, purchasing external knowledge, job education and training, market research and design. This study applies decision tree modeling, a kind of data-mining methodology, to explore effective innovation activities. This study employs the data from the 'Korean Innovation Survey (KIS) 2014: Manufacturing Sector.' The KIS 2014 gathered information about innovation activities in the manufacturing sector over three years (2011-2013). This study gives some practical implication for managing the activities. First, innovation activities that increased the achievement rate of product diversification projects included a combination of market research, new product design, and job training. Second, our results show that a combination of internal R&D, job training and training, and market research increases the project achievement most for the replacement of outdated products. Third, new market creation or extension of market share indicates that launching replacement products and continuously upgrading products are most important.

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.