• Title/Summary/Keyword: projects

Search Result 9,512, Processing Time 0.031 seconds

Successful Winning Award Factors in Early Stage of International Public Private Partnership Projects (해외개발사업 발굴단계의 수주성공요인 분석)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.84-94
    • /
    • 2017
  • Recently, domestic construction companies have increasingly engaged in international PPP projects a result of both uncertainties in the domestic construction market and low competitiveness in international EPC project business. These international PPP projects usually require long-term preparations and substantial sales costs, which make it important for decision-makers to select winning-award potential project in early stage of the projects. However, most previous research has analyzed success factors in terms of project development across all stages. Thus, this study investigated 28 success factors of 4 categories in the early stage of 31 international PPP projects. First, results indicate that unsolicited PPP projects require better implementation capabilities and financial conditions compared to solicited PPP projects. Second, implementation capability is important because it is not easy to improve as the project proceeds. Third, commercial conditions are identified as important even if conditions are not fixed in the early stage of PPP projects. Fourth, non-commercial conditions, strategy, and public interest are not found to be meaningful in the early stage of PPP projects because they can vary as the project proceeds. This study helps to improve selection criteria aimed towards more winning-award potential project in the early stage of international PPP projects.

A Study on Risk Analysis and Management Plan for Development Projects (개발사업(산업단지, 골프장)의 리스크 분석 및 관리방안)

  • Jeong, Min Young;Lee, Min Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.229-238
    • /
    • 2022
  • With rapid industrialization since the 1960s, development projects have contributed to the development of the national economy. In addition to the development projects promoted by the government, private project operators are also promoting development projects for reasons such as increased public convenience, insufficient financing of SOC assets, and expansion of their own development projects other than public orders. However, as the economy has been stagnating due to several factors such as continued supply of facilities for decades and recent COVID-19, the success of the development projects are unsure these days. Therefore, this study attempted to analyze project costs through the case of such development projects, and to present a plan to judge and manage the risks of each project cost item in advance. The AHP technique, which is widely used as a risk factor selection method for existing development projects, was used, and items were determined through interviews with experts related to development projects in order to stratify the upper and lower subjects of the risk. We analyzed how the derived risk factors affect the business performance through sensitivity analysis, and finally substituted the risk factors management plan into the risk response strategy and suggested.

Correlation Analysis between Safety Education and Human Error by Construction Workers (안전교육과 건설근로자 휴먼에러 상관관계 분석)

  • An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.4
    • /
    • pp.343-349
    • /
    • 2014
  • The construction projects are larger and more complex, and so the construction accidents are bigger. Recently, the studies for reducing the human errors are researched to decrease the construction accidents. The purpose of this study is to analysis a correlation between the safety education and human errors by construction workers. The results showed that the frequencies of safety education in large sized construction projects are more than these in small sized construction projects. However, all of construction projects conduct lower times of safety education than the regulated times. In addition, it is revealed that the human errors of construction workers in large sized construction projects are being lower in accordance with increasing the safety education times. In small sized construction projects, however, the human errors of construction workers are increasing according to more times of safety education, reversely. This study should help to reduce the accidents in construction projects.

Evaluation of urban regeneration projects in accordance with the type of declining area - Focusing on the declining area in Daejeon - (쇠퇴지역의 유형에 따른 도시재생사업의 평가 - 대전광역시 쇠퇴지역을 중심으로 -)

  • Park, So-Yeon;Oh, Deog-Seong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4984-4991
    • /
    • 2015
  • This study derives the city's declining area by the type, and evaluates urban regeneration projects to sustainable urban regeneration planning factors. And assess whether urban regeneration projects are suitable for declining aspect of area. Application of sustainable urban regeneration plan factors of 19 declining areas is found to be less than 'normal'. This showed that urban regeneration projects not being actively enforced. All areas except hoedeokdong have been estimated that urban regeneration projects did not enforce the corresponding type on the decline, it still showed that concentrated on the physical regeneration projects. Excavation of social, economic regeneration projects that can respond to the type of decline and integrated, ongoing urban regeneration efforts are needed.

The Impact of Boundary Spanning Activities on Systems Performance in ERP System Development Projects (ERP 시스템 구축 프로젝트에서의 경계연결활동이 ERP 시스템 성과에 미치는 영향)

  • Lee, Yongseung;Kim, Sanghoon
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.117-138
    • /
    • 2018
  • The purpose of this study is to empirically analyze the relationships between the Boundary Spanning Activities (BSA) of project team and system performance in ERP system development projects. We could theoretically classify the BSA in the ERP development projects into five categories on the basis of existing studies on the BSA in the research fields of organization theory, new product development, and information systems development. These five categories are 'Ambassador' activities, 'Task-coordinator' activities, 'Scout' activities, 'Sentry' activities and 'Guard' activities. And the relationship between the implementation level of activities included in each category and the project performance (system usage and users' satisfaction) was hypothesized with respect to five BSA categories. In order to test the hypotheses, we conducted on/offline survey of the participants who were involved in the ERP system development projects, and received 345 valid responses. The unit of analysis was the project team, and the total number of teams that survey participants belonged to were 103 ones. The Structural Equation Model Analysis using the SMART PLS 3.0 was applied to statistically testing the hypotheses. The results showed that 10 hypotheses among 12 hypotheses could be supported. The theoretical implications of this study can be summarized as following; first, redefining and categorizing the BSA (Boundary Spanning Activities) in the ERP system development projects, secondly, deriving measurement indicators of the implementation level for each BSA category and statistically proving the validity and the reliability of them, and finally, suggesting the theoretical background of expanding the management area of ERP systems development projects. Furthermore, the practical implication of this study is that concrete BSA items which are empirically derived can be utilized as effective guidelines for successfully implementing the BSA in the process of managing the ERP system development projects.

Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods

  • Devendra, C.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.26 no.1
    • /
    • pp.1-18
    • /
    • 2013
  • The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agroecological zones (AEZs), including 570 breeds and 64% share of the breeds. They occupy a very important biological and socioeconomic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D) are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of ruminants in which goats, with a capacity to cope with heat tolerance, can be the entry point for development. Networks and networking are very important for the diffusion of information and can add value to R and D. Well formulated projects with clear priority setting and participatory R and D ensure success and the realisation of food security, improved livelihoods and self-reliance in the future.

Influence of Organizational Culture on Performance of Building Construction Project (건축현장 조직문화가 프로젝트 성과에 미치는 영향)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.501-506
    • /
    • 2015
  • Construction companies want to improve the abilities of field organizations for improving the performance of construction projects. It is possible to improve the performance of construction projects by managing the field organizational culture, due to the field organizational culture is concerned with the abilities of construction field organizations. Therefore, the purpose of this study is to reveal the influence of the field organizational culture on the performance of building construction projects. The results of this study showed that field organizational cultural characteristics influence on the performance of construction projects. Best performed projects have the higher characteristics of a consensus culture and rational culture, and worst performed projects have the lower characteristics of a development culture and consensus culture. In addition, the characteristics of rational culture and hierarchy culture effect on the performance in worst performed projects. This study is expected to help to improve the performance management system in construction field organization.

Building Direction of a Procurement Management Process Model for the SOC projects (Focused on the Airport Facilities) (SOC 사업의 조달관리 프로세스 모델 구축 방향 (공항시설물 중심으로))

  • Kim Ku-Taek;Kim Sun-Kuk;Han Choong-Hee;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.108-116
    • /
    • 2000
  • The absence of systematic project procedures in the domestic SOC projects has caused many problems. Therefore, it has been raised the needs for the effective project management of the projects which helps the participants to have systematic procedures at each phase of the SOC projects. The purpose of this research is to build the current model of procurement management process for the airport facilities and to derive inherent problems, and the building direction of the effective procurement management is suggested for the future research. The result of this research could be used for delivering the effective SOC projects and for establishing interrelationships between procurement and other phases of the projects for the integrated project management. The procurement process of the Inchon International Airport was investigated and the as-is model was built. Through the analysis of the as-is model, and the questionnaires and the interviews with the participants of the SOC projects, the problems of the current procurement process has been derived.

  • PDF

Development of Construction R&D Strategy through the International Construction Market Analysis (해외건설 시장 분석을 통한 건설기술개발 전략 수립)

  • Park, Hwanpyo;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.49-57
    • /
    • 2016
  • R&D projects for land, infrastructure, and transportation is to identify challenges through academic-industrial demand survey, and to promote R&D projects through detailed planning projects. These R&D projects have been promoted to be applied to most domestic project-oriented. Despite continuous R&D investment, the investment has been promoted to the world top technology rather than to international construction projects. This study analyzed the international construction market trends and international construction contracts in order to promote technology development for enhancing international construction competitiveness. This study suggests three R&D technology development directions and ten research projects for expanding international construction projects.

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.