This research has been conducted to find answers to the questions of how projects that support local businesses work in areas undergoing gentrification and what are the achievements and limitations of these projects, based on the case studies of Brixton Pound and Pop Brixton supporting local businesses in Brixton in the London borough of Lambeth. To this end, this study collected data through interviews with local businesses belonging to each project and analysed them based on prior research on the projects, evaluation reports, and articles in the media. It began by investigating the supporting mechanisms of projects that support local businesses in the area, and then analysed and evaluated the projects' contribution to local businesses and the impact on the local community according to these mechanisms. The two projects in the case study showed contrasts in their support mechanisms, governance, and the role of Lambeth Council, and the local businesses' evaluations of the projects' support differed depending not only on the support mechanism of each project but also on business type and perceptions of the impact of gentrification.
The 5th International Conference on Construction Engineering and Project Management
/
pp.412-418
/
2013
With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.
This study was conducted to investigate the current status and the improvement plans of the ecosystem conservation fund return projects. In 2007, there was a reformation of the ecosystem conservation fund system but the fund return projects were not vitalized up until now. In this study, 35 of ongoing and finished fund return projects were investigated on their types, sites, costs, local governments, and time required to return the fund. Through the on-site survey of 9 finished projects (4 biotope, 2 corridor and 3 natural conservation facility projects), construction and management conditions were investigated. The main findings are as follows: Among the five fund return types, 17 cases were biotope restoration projects, 4 cases were ecological corridor projects, and 1 case was a nature replacement project. In the case of project sites, there were 14 cases near schools and public facilities, 8 cases near rivers or streams, and 2 cases near ponds or wetlands. For the construction costs, there were 19 cases (65% of all the projects) that cost less than 300 million won. In terms of the involvement of the local government, most of the fund return projects were concentrated in Gyeonggi province and Ulsan city, and there were some local governments outside of these regions that did not carry out any return projects at all. Lastly, in the case of fund return time required, 35% of the fund returns were completed within 5 months, but the overall average fund return time was 9.8 months. In respond to the above study results, the improvement plans to encourage fund return projects are as follows: To diversify return types and sites, piloting and modeling projects for the representative types and sites should be preceded. To emerge from customary small-scaled projects, incentives to encourage large-scale and ecological networking projects should be considered. In addition, in order to write up business plans for the fund return projects, long-term investigations of at least 2 seasons from spring to fall are necessary. Finally, for the continuous management and maintenance of the ecological fund return sites, easier way for the citizens to actively participate in the projects should be incorporated.
This study tries to measure the direct and indirect effects of the Regional Strategic Industry (RSI) promotion projects in Chungbuk Province in Korea. In specific, it critically examines whether there exists policy consistency and connectivity between the hardware-oriented Stage I (2002~2007) and the software-centered Stage II (2008~2012) RSI promotion projects. Applying System Dynamics (SD) techniques, this study examines complex system characteristics of RSI promotion projects, all of which have been derived from the causal and stock-flow models and their simulated results. Major findings are as follows: Firstly, 'the continuous investment' is regarded as the most crucial policy leverage for the strategic industry promotion and regional economic growth. Secondly, without exceptions, the RSI promotion projects should switch their evaluation criteria to performance-oriented ones. Thirdly, in selecting their subprojects, the RSI promotion projects should pay due attention to evaluating technology value and marketability. Fourthly, it should put policy priority in strengthening cluster networking and interconnectivity among projects, inevitably supporting a selective number of virtuous network systems. Fifthly, auxiliary projects such as marketing, technology aid, and knowledge-based services should not be overlooked.
Since various R&D projects about technology convergence was conducted by the government of Korea, the lack of liaisons among the projects has been accepted as serious issues related on the duplicated funding. In this article, we propose a research framework to analyze the relationship among national R&D projects about technology convergence. In detail, the projects have been sorted and categorized with the data collected from National Science and Technology Information Service (NTIS) in order to analyze the current state of national R&D projects. The linkages among projects are then established using the results of analysis on national R&D projects. Finally, the relationship maps have been developed. It is expected that the result could be applied to identify the relations among projects and handle problems on the duplicated funding.
The purpose of this study is to identify the trend of the contents of the plan that was implemented through contents analysis on the master plan project of rural village development projects that began in 2004. Contents analysis is based on the classification of business in the detailed enforcement regulations of rural village development project. Analysis on the project contents was conducted for 30 days from June 20 to July 20 for the 132 regions established in the master plan during the period from 2004 to 2007. The results of the analysis showed the following. First, scenery facilities, rural tourism, cultural welfare and income basis projects accounted for 76.5% of the total projects. Second, with regard to investment costs depending on the contents of the projects, cultural welfare, rural tourism and income basis projects accounted for 66.3% of the total investment costs. Third, it was found out that, with regard to the trend of change in the project contents by year, income basis projects were sharply reduced whereas cultural welfare and scenery facilities projects were increased. Finally, with regard to the analysis on the projects by region, it was found that Gangwon, Gyeonggi and Chungnam gave high weight on rural tourism, whereas Gyeongbuk, Jeonnam and Jeonbuk gave low weight on rural tourism. Particularly, Gyeongnam was found to have given low weight on income basis project.
The number of national research and development(R&D) projects have been continually increased, and it is necessary that the efficiency of investment of R&D projects have been improved during the last two decades. also the government has improved national R&D process and supporting tools for the projects. However, it is not enough to develop a quality model to evaluate the projects systematically. Therefore, a quality model for national R&D projects need to be revised. The quality model for the projects should be based on the global standard(ISO/IEC 9126). In this paper, the authors proposed a quality model for national R&D projects and took a case study for verification of the quality model. The quality model is defined in terms of functionality, reliability, usability, efficiency, portability and maintainability. Also, the authors suggest metrics for measuring the quality of products or services. finally, The productivity and quality of national R&D projects will be improved by the quality model.
Proceedings of the National Institute of Ecology of the Republic of Korea
/
제2권4호
/
pp.247-258
/
2021
To understand restoration and conservation projects conducted in Korea for endangered freshwater fishes and amphibians/reptiles, information about Request for Protocols-related studies on restoration, breeding, and release were collected. Trends of studies were visualized via word clouds and VOSviewer program using a text mining technique. Analysis of restoration projects for endangered freshwater fishes elucidated that most research studies conducted to date were focused on genetics and release through captive breeding that could be classified into captive breeding and habitat environments. As for research projects related to amphibians/reptiles, monitoring projects had the highest number, followed by genetic, translocation, and monitoring studies. In addition, restoration projects for amphibians/reptiles included a large number of post-capture translocation projects. Thus, many projects were confirmed by public institutions rather than by the Ministry of Environment. Network analysis revealed that it was largely classified into capture, translocation, and Kaloula borealis. Based on these results, limitations, achievements, and challenges associated with projects conducted thus far are highlighted. Research directions for future restoration and conservation of endangered freshwater fishes and amphibians/reptiles in South Korea are also suggested.
The 9th International Conference on Construction Engineering and Project Management
/
pp.1154-1161
/
2022
Building Information Modelling (BIM) has evolved into a comprehensive, collaborative method in construction project delivery. Most industrialized and developed countries have made BIM mandatory in the government and public projects, whereas developing countries are embracing and catching up BIM technologies to improve their professional's abilities and reduce claims in the construction projects. However, BIM awareness and professional's competence have become critical in implementing BIM in infrastructure projects in Nepal, particularly hydropower projects. The objectives of this study are to find the BIM awareness among hydropower professionals in Nepal and assess their response. The study used a questionnaire survey to assess the awareness. The results showed that only few professionals (12 percentage in this study) are aware of BIM and its application in Hydropower infrastructures. Majority of the respondents (more than 50%) were interested in BIM trainings and believed BIM implementation in future projects. The study indicated that lack of BIM training and lack of BIM awareness were the top factors affecting BIM implementation in hydropower projects in Nepal. The findings showed that about 66 percent of the respondents who used BIM in their projects mainly used during construction phase. More than 80 percent believed that BIM should be mandated for the hydropower projects in Nepal. The findings presented in this study could promote awareness among different professionals, organization, and construction team and encourage BIM implementation in Hydropower projects. The findings could raise awareness of BIM in Nepal's infrastructure sectors and its invaluable benefits in construction.
The 6th International Conference on Construction Engineering and Project Management
/
pp.527-531
/
2015
With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.