• 제목/요약/키워드: projects

검색결과 9,461건 처리시간 0.043초

Comparative Analysis of the Achievements and Limitations of Projects that Support Local Businesses in an Area Undergoing Gentrification: A case study on Brixton

  • Park, Youngseo;Ham, Sungil
    • Architectural research
    • /
    • 제24권1호
    • /
    • pp.13-20
    • /
    • 2022
  • This research has been conducted to find answers to the questions of how projects that support local businesses work in areas undergoing gentrification and what are the achievements and limitations of these projects, based on the case studies of Brixton Pound and Pop Brixton supporting local businesses in Brixton in the London borough of Lambeth. To this end, this study collected data through interviews with local businesses belonging to each project and analysed them based on prior research on the projects, evaluation reports, and articles in the media. It began by investigating the supporting mechanisms of projects that support local businesses in the area, and then analysed and evaluated the projects' contribution to local businesses and the impact on the local community according to these mechanisms. The two projects in the case study showed contrasts in their support mechanisms, governance, and the role of Lambeth Council, and the local businesses' evaluations of the projects' support differed depending not only on the support mechanism of each project but also on business type and perceptions of the impact of gentrification.

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

생태계보전협력금 반환사업의 추진 현황과 개선 과제 (A Study on Current Status and Improvement Plans of Ecosystem Conservation Fund Return Projects)

  • 조동길;김상욱
    • 한국환경복원기술학회지
    • /
    • 제13권3호
    • /
    • pp.63-72
    • /
    • 2010
  • This study was conducted to investigate the current status and the improvement plans of the ecosystem conservation fund return projects. In 2007, there was a reformation of the ecosystem conservation fund system but the fund return projects were not vitalized up until now. In this study, 35 of ongoing and finished fund return projects were investigated on their types, sites, costs, local governments, and time required to return the fund. Through the on-site survey of 9 finished projects (4 biotope, 2 corridor and 3 natural conservation facility projects), construction and management conditions were investigated. The main findings are as follows: Among the five fund return types, 17 cases were biotope restoration projects, 4 cases were ecological corridor projects, and 1 case was a nature replacement project. In the case of project sites, there were 14 cases near schools and public facilities, 8 cases near rivers or streams, and 2 cases near ponds or wetlands. For the construction costs, there were 19 cases (65% of all the projects) that cost less than 300 million won. In terms of the involvement of the local government, most of the fund return projects were concentrated in Gyeonggi province and Ulsan city, and there were some local governments outside of these regions that did not carry out any return projects at all. Lastly, in the case of fund return time required, 35% of the fund returns were completed within 5 months, but the overall average fund return time was 9.8 months. In respond to the above study results, the improvement plans to encourage fund return projects are as follows: To diversify return types and sites, piloting and modeling projects for the representative types and sites should be preceded. To emerge from customary small-scaled projects, incentives to encourage large-scale and ecological networking projects should be considered. In addition, in order to write up business plans for the fund return projects, long-term investigations of at least 2 seasons from spring to fall are necessary. Finally, for the continuous management and maintenance of the ecological fund return sites, easier way for the citizens to actively participate in the projects should be incorporated.

지역전략산업육성사업과 지역경제성장 파급효과: 충북 사례를 중심으로 (Regional Strategic Industry (RSI) Promotion Projects and Their Impact on Regional Economic Growth: Focused on Chungbuk Province Cases)

  • 최남희;조병설;안유정;이만형
    • 한국시스템다이내믹스연구
    • /
    • 제14권1호
    • /
    • pp.5-29
    • /
    • 2013
  • This study tries to measure the direct and indirect effects of the Regional Strategic Industry (RSI) promotion projects in Chungbuk Province in Korea. In specific, it critically examines whether there exists policy consistency and connectivity between the hardware-oriented Stage I (2002~2007) and the software-centered Stage II (2008~2012) RSI promotion projects. Applying System Dynamics (SD) techniques, this study examines complex system characteristics of RSI promotion projects, all of which have been derived from the causal and stock-flow models and their simulated results. Major findings are as follows: Firstly, 'the continuous investment' is regarded as the most crucial policy leverage for the strategic industry promotion and regional economic growth. Secondly, without exceptions, the RSI promotion projects should switch their evaluation criteria to performance-oriented ones. Thirdly, in selecting their subprojects, the RSI promotion projects should pay due attention to evaluating technology value and marketability. Fourthly, it should put policy priority in strengthening cluster networking and interconnectivity among projects, inevitably supporting a selective number of virtuous network systems. Fifthly, auxiliary projects such as marketing, technology aid, and knowledge-based services should not be overlooked.

  • PDF

국가 융합연구사업의 현황 및 연계성 분석 (Analysis of Current Situation and Relationship among National R&D Projects for Technology Convergence)

  • 조양래;양이석;서용윤;전정환
    • 대한산업공학회지
    • /
    • 제41권3호
    • /
    • pp.305-323
    • /
    • 2015
  • Since various R&D projects about technology convergence was conducted by the government of Korea, the lack of liaisons among the projects has been accepted as serious issues related on the duplicated funding. In this article, we propose a research framework to analyze the relationship among national R&D projects about technology convergence. In detail, the projects have been sorted and categorized with the data collected from National Science and Technology Information Service (NTIS) in order to analyze the current state of national R&D projects. The linkages among projects are then established using the results of analysis on national R&D projects. Finally, the relationship maps have been developed. It is expected that the result could be applied to identify the relations among projects and handle problems on the duplicated funding.

농촌마을종합개발사업 내용분석과 시사점 -'04-'07년 사업대상지 사업을 중심으로 - (Contents Analysis on the Rural Village Development Projects: With Focus on Project Regions during 2004-2007)

  • 박한식;황길식;김영택
    • 농촌계획
    • /
    • 제14권4호
    • /
    • pp.121-128
    • /
    • 2008
  • The purpose of this study is to identify the trend of the contents of the plan that was implemented through contents analysis on the master plan project of rural village development projects that began in 2004. Contents analysis is based on the classification of business in the detailed enforcement regulations of rural village development project. Analysis on the project contents was conducted for 30 days from June 20 to July 20 for the 132 regions established in the master plan during the period from 2004 to 2007. The results of the analysis showed the following. First, scenery facilities, rural tourism, cultural welfare and income basis projects accounted for 76.5% of the total projects. Second, with regard to investment costs depending on the contents of the projects, cultural welfare, rural tourism and income basis projects accounted for 66.3% of the total investment costs. Third, it was found out that, with regard to the trend of change in the project contents by year, income basis projects were sharply reduced whereas cultural welfare and scenery facilities projects were increased. Finally, with regard to the analysis on the projects by region, it was found that Gangwon, Gyeonggi and Chungnam gave high weight on rural tourism, whereas Gyeongbuk, Jeonnam and Jeonbuk gave low weight on rural tourism. Particularly, Gyeongnam was found to have given low weight on income basis project.

ISO/IEC 국제표준에 기반한 국가연구개발사업 품질측정모델에 관한 연구 (A Quality Model of National R&D Projects based on ISO/IEC Standards)

  • 송병선;이재성;류성열;이남용
    • 한국IT서비스학회지
    • /
    • 제7권3호
    • /
    • pp.31-45
    • /
    • 2008
  • The number of national research and development(R&D) projects have been continually increased, and it is necessary that the efficiency of investment of R&D projects have been improved during the last two decades. also the government has improved national R&D process and supporting tools for the projects. However, it is not enough to develop a quality model to evaluate the projects systematically. Therefore, a quality model for national R&D projects need to be revised. The quality model for the projects should be based on the global standard(ISO/IEC 9126). In this paper, the authors proposed a quality model for national R&D projects and took a case study for verification of the quality model. The quality model is defined in terms of functionality, reliability, usability, efficiency, portability and maintainability. Also, the authors suggest metrics for measuring the quality of products or services. finally, The productivity and quality of national R&D projects will be improved by the quality model.

Current Status and Future Prospects of Endangered Species Restoration Projects for Freshwater Fishes, Amphibians, and Reptiles in South Korea

  • Yoon, Ju-Duk;Kwon, Kwanik;Yoo, Jeongwoo;Yoo, Nakyung
    • Proceedings of the National Institute of Ecology of the Republic of Korea
    • /
    • 제2권4호
    • /
    • pp.247-258
    • /
    • 2021
  • To understand restoration and conservation projects conducted in Korea for endangered freshwater fishes and amphibians/reptiles, information about Request for Protocols-related studies on restoration, breeding, and release were collected. Trends of studies were visualized via word clouds and VOSviewer program using a text mining technique. Analysis of restoration projects for endangered freshwater fishes elucidated that most research studies conducted to date were focused on genetics and release through captive breeding that could be classified into captive breeding and habitat environments. As for research projects related to amphibians/reptiles, monitoring projects had the highest number, followed by genetic, translocation, and monitoring studies. In addition, restoration projects for amphibians/reptiles included a large number of post-capture translocation projects. Thus, many projects were confirmed by public institutions rather than by the Ministry of Environment. Network analysis revealed that it was largely classified into capture, translocation, and Kaloula borealis. Based on these results, limitations, achievements, and challenges associated with projects conducted thus far are highlighted. Research directions for future restoration and conservation of endangered freshwater fishes and amphibians/reptiles in South Korea are also suggested.

BIM Awareness Assessment among Hydropower Professionals in Nepal

  • Bhattarai, Sushmit Sharma;Kisi, Krishna P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1154-1161
    • /
    • 2022
  • Building Information Modelling (BIM) has evolved into a comprehensive, collaborative method in construction project delivery. Most industrialized and developed countries have made BIM mandatory in the government and public projects, whereas developing countries are embracing and catching up BIM technologies to improve their professional's abilities and reduce claims in the construction projects. However, BIM awareness and professional's competence have become critical in implementing BIM in infrastructure projects in Nepal, particularly hydropower projects. The objectives of this study are to find the BIM awareness among hydropower professionals in Nepal and assess their response. The study used a questionnaire survey to assess the awareness. The results showed that only few professionals (12 percentage in this study) are aware of BIM and its application in Hydropower infrastructures. Majority of the respondents (more than 50%) were interested in BIM trainings and believed BIM implementation in future projects. The study indicated that lack of BIM training and lack of BIM awareness were the top factors affecting BIM implementation in hydropower projects in Nepal. The findings showed that about 66 percent of the respondents who used BIM in their projects mainly used during construction phase. More than 80 percent believed that BIM should be mandated for the hydropower projects in Nepal. The findings presented in this study could promote awareness among different professionals, organization, and construction team and encourage BIM implementation in Hydropower projects. The findings could raise awareness of BIM in Nepal's infrastructure sectors and its invaluable benefits in construction.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF