• Title/Summary/Keyword: project size

Search Result 917, Processing Time 0.036 seconds

Prediction Model of Software Size for 4GL and Database Projects

  • Yoon, myoung-Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.3
    • /
    • pp.1-7
    • /
    • 1999
  • An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building prediction methods for software size in fourth-generation languages and database projects. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset Ⅰ and Ⅱ, respectively. For the data set Ⅰ and Ⅱ, our proposed prediction method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.

  • PDF

Software Size Estimation Model for 4GL System (4GL 시스템에 대한 소프트웨어 크기 추정 모델)

  • Yoon, Myoung-Young
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1999.05a
    • /
    • pp.97-105
    • /
    • 1999
  • An important task for any software project manager is to be able to predict and control project size. Unfortunately, there is comparatively little work that deals with the problem of building estimation methods for software size in fourth-generation languages systems. In this paper, we propose a new estimation method for estimating for software size based on minimum relative error(MRE) criterion. The characteristic of the proposed method is insensitive to the extreme values of the observed measures which can be obtained early in the development life cycle. In order to verify the performance of the proposed estimation method for software size in terms of both quality of fit and predictive quality, the experiments has been conducted for the dataset I and II, respectively. For the data set I and II, our proposed estimation method was shown to be superior to the traditional method LS and RLS in terms of both the quality of fit and predictive quality when applied to data obtained from actual software development projects.

  • PDF

Software Size Measurement from Information Strategy Planning With the Function Point Method (정보전략계획 단계에서의 정보시스템 규모 예측:기능점수모형을 중심으로)

  • Bae, Joon-Soo;Jung, Jae-Yoon
    • The Journal of Society for e-Business Studies
    • /
    • v.14 no.3
    • /
    • pp.153-168
    • /
    • 2009
  • Many companies and governments perform information technology (IT) projections repeatedly for higher competitiveness and efficiency. Moreover, as the sizes of IT projects increase, the manpower and cost estimation of the projects are getting more important. In this research, we present a size estimation method of information system development projects on the basis of the function point method at the stage of information strategy planning(ISP), and illustrate the size calculation of an example IT project. According to the method, we first identify the types of projects, the scope and boundaries of size estimation, then count data and transaction functions from the artifacts of the ISP project. The unadjusted function points are adjusted to function point by the table of the Early Function Point. The way of calculating the sizes of IT projects will support successful IT projects by estimating reasonable manpower and cost for the projects.

  • PDF

A Health and Safety Improvement Roadmap for the Construction Industry

  • Diugwu, Ikechukwu A.;Baba, Dorothy L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.37-44
    • /
    • 2014
  • Comparatively, the construction industry has, on average, a higher rate of fatal and major injuries, work induced ill-health and damage to properties than other industrial sectors; and this is a source of concern to industry stakeholders. The study showed that although subcontracting could be contributory to an increase in workplace accidents in the construction industry, contractual aspects of subcontracting arrangements (such as the power imbalance that exist along the client-customer interface) also present opportunities for improvements in health and safety management (HSM) practices in organisations. This conclusion was reached after an analysis of a questionnaire survey (with a 27% response rate) that assessed the attitudes and perception to health and safety issues.

An Analysis Methodology for the Renewal of Internet Portal and a Case (인터넷 포털 리뉴얼 분석 방법론 및 적용 사례)

  • Suh, Woo-Jong;Hong, Jin-Won
    • Journal of Information Technology Applications and Management
    • /
    • v.15 no.4
    • /
    • pp.77-101
    • /
    • 2008
  • The market size of Internet portals has been continuously expanded and also competition has been fierce. For the business success of Internet portals, it is necessary to repeatedly perform a renewal project which improves their services, reflecting more improved or changed strategies. Accordingly, this paper proposes an analysis methodology for performing the renewal project more systematically and effectively. The methodology consists of four phases : establishing improved strategies, analyzing customers, deriving service alternatives, and determining services. The methodology places an emphasis on reflecting effectively customers' standpoints (i.e. customers' needs) and service providers' standpoints (i.e. business strategy) upon service improvement. Furthermore, the methodology includes a specific technique for analyzing the feasibility of services. To demonstrate the practical usefulness of the methodology, a real-life case is illustrated.

  • PDF

A study on exposed aggrigate P.C. in field plant cast - case study for core building, VOTRAKON project - (골재노출 P.C제품의 현지생산에 관한 소고 -보트라콘 프로젝트의 코아빌딩을 중심으로-)

  • 이학영
    • Journal of the Korean Professional Engineers Association
    • /
    • v.19 no.2
    • /
    • pp.34-42
    • /
    • 1986
  • These brief studies and reports of the use of exposed aggrigate precast concrete in practice are combined with a description of some notable co-ordination such as shop drawing, manufacturing and erection in the field construction. Above mentioned exposed aggrigate P. C. means architectural P. C. which was used to the VOTRAKON site in Riyadh, Saudi Arabia. Fabricated P. C. on the site without autoclaving and steam curing plant had been successfully carried out on this project-core building, conference room and others. The project designed by HOPE/VTN international INC. which is located in San Diego, California U.S.A. stands for vocational training and related support facilities contract. We had to submit shop drawings showing complete information for fabrication and installation of P. C. unit reinforcement. Also we should be indicated member dimension and cross section, location size and type of necessary for erection. We can delineate the following characteristic results. One of the most important things how to handle exposed aggrigate P.C. unit as specified was quality assurance and co-ordination for shop drawing, manufacturing and erection.

  • PDF

Risk Sharing in the Commercialization Step of National R&D Project

  • Han, Kyeong-Hee;Kim, Soung-Hie
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.12 no.1
    • /
    • pp.147-155
    • /
    • 1986
  • Nations, especially developing countries, hope to license the technology developed at the expense of government Research and Development (R&D) investment to the corresponding firms for commercial exploitation. Since commercial process is owing to lots of risk, firms have to grope the possibility of forming a partnership in order to reduce the risk. Therefore, a joint venture between firms would be needed to share the risk. This methodology suggests a way that probabilistic information of commercial project payoffs can be obtained using experts in project evaluation committee and the ratio of individual firm's investment size can be derived using risk sharing concept. Also simple examples are given.

  • PDF

Analysis of Applying the Mobile BIM Application based on Cloud Computing (클라우드 컴퓨팅 기반의 모바일 BIM 애플리케이션 적용성 분석)

  • Jun, Jin-Woo;Lee, Sang-Heon;Eom, Shin-Jo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.5
    • /
    • pp.342-352
    • /
    • 2012
  • As a futuristic construction model, building information model (BIM) based project management system (PMIS) and mobile BIM simulator apps have been showing visible sign. However, researches on the BIM based 3D simulator using mobile device are hard to find result from limitation of mobile device (slow speed at huge 3D file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying application of mobile BIM apps based on cloud computing. Total 8 BIM cloud apps were selected and analyzed in the 5 application feasibility characteristics (speed, view, inquiry, markup, and usability). This research would be essential phase to construct BIM based mobile project management system using cloud computing in the future.

A new approach for resource allocation in project scheduling with variable-duration activities

  • 김수영;제진권;이상우
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.410-420
    • /
    • 1994
  • In many project-oriented production systems, e.g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [131 and by Leachman, Dincerler, and Kim [7] in extended formulations of the resource-constrained project scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach: (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationships of the activities also are presented.

A Study on Actual Condition Survey of The Making Livable City (살고싶은 도시만들기사업의 실태 조사연구)

  • Lee, Minseon;Jung, Jinju;Choi, Hyoseung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.9 no.3
    • /
    • pp.63-72
    • /
    • 2007
  • Recently, with the policy balance development in the country, Ministries of the government as managers related each of regional projects have prepared pan-governmental support system to achieve Making Livable Area Policy. This study is analysis result of investigation in 2007 authorized cases of MLCP(Making Livable City Project) which Ministry of Construction & Transportation have propelling from city and rural-urban area of town, myeon and dong, to rural area of small village size. Areas chosen for MLCP have the active participation of inhabitants, and to promote successfully project, need to support system and originality for area. Such projects will finally increase the life quality, and make life-spaces wanting to live in the area.

  • PDF