1 |
Virtual Construction System Research Association, 2010, BIM Guideline Ver 2.0
|
2 |
Yoon, S.W. et al., 2010, A Development of Project Management Information System using SMART Phone, Proceedings KICEM, pp. 19-20.
|
3 |
Ahn, C.S. et al., 2010, A Study on the Smart phone Application Development and Its direction Considering Construction Site Characteristics, Proceedings KICEM, pp. 113-114.
|
4 |
Lee, W.J. and Choi, W.W., 2011, A Study of GS E&C's Project Management System in using of Smart Phone, AIK Review of Architecture and Building Science, 55(1).
|
5 |
Lee, J.H. and Eom, S.J., 2011, Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System, Proceeding KIC, 11(1), pp. 145-148.
|
6 |
Tak, S.W. et al., 2007, A Study on the PIMS and 3D Simulation Application of the Construction Field, Proceedings KICEM, pp. 967-971.
|
7 |
Moon, S.W. et al. 2008, Application of BIMbased PMIS Considering Construction Life- Cycle, Proceedings KICEM, pp. 655-658.
|
8 |
Choi, J.M. et al., 2008, A Study on the Development of the Pilot Test Model to Examine the Applicability of the BIM Technology to PMIS, Proceedings KICEM, pp. 319-324.
|
9 |
Yoon, S.W. et al., 2008,, A Strategy for Building BIM+PMIS System, Proceedings KICEM, pp. 75-81.
|
10 |
Jun, Y.W. et al., 2010, A Study on the Development of a Construction Field Management Model based on BIM, Journal of the Korea Institute of Building Construction, pp. 127-135.
|
11 |
iPhone Human Interface Guidelines.pdf, Website: http://v3.cache1.c.bigcache.googleapis.com/ss.textcube.com/blog/0/3585/attach/XDaJ7GjSwI.pdf, p.42.
|
12 |
MLTMA, 2010, Architectural BIM Guideline.
|