Decision-Making Process in Rural Reconstruction Project - An Evaluation Technique for Village Planning in Newly Reclaimed Land - (농촌개발사업의 의사결정기구 -간척지 취락계획을 위한 평가체계의 수립-)

  • 최수형;황한철
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.4
    • /
    • pp.86-94
    • /
    • 1993
  • In this study, a tentative decision-making matrix for village planning in reclaimed land was proposed. The evaluating conditions in the matrix are reclaimed farming acreage and distance. And the indexes for evaluation works are farming acreage required for increasing present farm size to target size in the base of, allowable commuting distance for farming from and effective controlling distance of each village. The village planning strategies are considered into four categories ; upkeep of present village scale, transfer of its superfluous farming acreage to a neighbouring village, enlargement of present village scale and new village construction in reclaimed land. As a case study, the proposed decision-making matrix was applied to 69 villages, which are contiguous to the potential farming area from reclamation works of Yongsan River Basin Comprehensive Development Project Phase Ill and so considered in this study as future farming villages there. From the application results, the following tactics for village planning may be proposed ; principally, upkeep or enlargement of present village scale, but, in an exceptional few cases of standard farming size being 3~5ha, new village construction of normal or satellite scale.

  • PDF

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project (건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발)

  • Chu Hae-Keum;Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.109-117
    • /
    • 2003
  • The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.

The Introduction of Converter Station Construction for HVDC Link Project between Jindo and Jeju (진도~제주간 직류연계 사업을 위한 변환소 건설 개요)

  • Lee, Jong-Seok;Moon, Bong-Soo;Kang, Won-Tag;Kim, Kyeong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.357_358
    • /
    • 2009
  • According to the 4th BPE(Basic Plan for long-term Electricity Supply and Demand), Electricity demand of Jeju island in 2012 will be reached to 682MW. Jeju island will be faced with severe shortage of electricty, also needed to find transport route to supply green energy which will be made from "Carbon free island" energy policy toward land at that time. For that reason, The plan which construct 400MW size HVDC connection line was decided for potential supply stabilization and transportation of green energy. KEPCO organized special construction office not only to observe the successful project completion which aims 2011 December but also to build up professional manpower. KEPCO is putting spur to the HVDC project these days. Construction site of converter stations has been already confirmed and contracts of cable, converter have done as per turn-key early this year. On this report, we would like to discuss about project scheme, main characteristics of system, and the furture progress plan of "Jindo~Jeju HVDC construction project expecially converter station part" which is being pushed by KEPCO.

  • PDF

On the Development of Reference Guidelines for Self-evaluation of Organization's Systems Engineering and Project Management Capability (조직의 SEPMC 자체 평가에 유용한 참조기준 개발)

  • Choi, Young Gil;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.

The Impact of If Project Types and Ownerships on IT Value Evaluation (IT 프로젝트 유형과 오너쉽이 IT 가치평가에 미치는 영향)

  • 이국희;구본재
    • Journal of Information Technology Applications and Management
    • /
    • v.9 no.3
    • /
    • pp.79-95
    • /
    • 2002
  • As the budget size and complexity of 1T investment are growing, IT value measurement becomes more critical to the success of IT management In public organizations and private firms. It has been known that there are many factors such as IT costs, risks, qualify, and usage that should be taken Into consideration during the process of measuring IT value and making IT Investment decisions. However, little research has been done so far In order to analysis factors affecting the IT value and effectiveness. The purpose of this study Is to Investigate the impact of IT Project types and ownerships on IT value evaluation. The three research questions are as follows : (1) Does IT project type such as transactional, Informational, and infrastructure have any impact on 1T value measurement\ulcorner (2) Does the IT development ownership has any Impact on IT value\ulcorner (3) Does the IT operation ownership has any impact\ulcorner The empirical research was done at S-Electronics, world-wide known and the biggest manufacturing company in Korea, based on the method of structured interview. About 200 individual Information systems have been evaluated to calculate ROI measures, the dependent variable In this study. The results of statistical analysis show that two of three Independent variables, IT project types and IT development ownership, have statistically significant effects on IT value in terms of ROI measures.

  • PDF

Estimation of LCOE for Korean PV Projects : For the Ones that Financial Investors Participated in (한국 태양광발전사업의 에너지균등화비용(LCOE) 추정: 재무적투자자 참여사업을 대상으로)

  • Kim, Young-Kyung;Chang, Byung-Man
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.23-29
    • /
    • 2012
  • LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1 MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.

Support Project for the Establishment of a Smart Factory for the Win-win between Large and Small Businesses Performance Analysis of the Adopting Company (대·중소 상생형 스마트공장 구축 지원 사업 도입기업에 대한 성과분석)

  • Seo, Hongeil;Kim, Taesung
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.135-142
    • /
    • 2022
  • The smart factory is an important system that can reduce defects, maximize productivity, and respond to customer needs, from the labor-intensive era of traditional small and medium-sized manufacturing companies through the automation era to CPS using ICT. However, small and medium-sized manufacturers often fall short of the basic stage due to economic and environmental constraints, and there are many companies that do not even recognize the concept of a smart factory. In this situation, to expand the smart factory of small and medium-sized enterprises, the project to support the establishment of a smart factory for the win-win between large and small enterprises. The win-win smart factory construction support project provides a customized differentiation program support project according to the size and level of the company for all domestic manufacturing SMEs regardless of whether or not they are dealing with Samsung. In this study, we analyze the construction status and introduction performance of companies participating in the win-win smart factory support project to find out whether they have been helpful in management and to find efficient ways to improve support policies, and to suggest the direction of continuous support projects to improve the manufacturing competitiveness of SMEs in the future.

Study of Construction Costs in South and North Korea: Focusing on Construction Cost in Ryomyong Street Project, Pyongyang (남북 건축공사비 연구: 평양 려명거리 사업 건설조립액을 중심으로)

  • Kim, Jang-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.371-378
    • /
    • 2022
  • The Ryomyong Street project is the only construction project for which the construction cost is known, but its scale cannot be estimated because it is marked in North Korean Won. In this paper, the construction cost per m2 of North Korean apartment building construction was calculated based on the construction and assembly amount of the Ryomyong Street project. 160 to 1 was calculated as the ratio of the building construction cost per m2 between South and North Korea based on the Ryomyong Street project in Pyongyang and Seoul Housing & Communities Corporation. This ratio can be used to assume the construction size presented in North Korean won as there is no official exchange rate between the two Koreas.

A Study on the Reliability of Peer-evaluation for Team Members' Contributions and Incorporating Method into Grades - Focusing on the Capstone Design - (팀원 기여도에 대한 동료평가의 신뢰성과 성적 반영 방법에 대한 연구 -종합설계교과목을 중심으로-)

  • Chang, Hyunjae
    • Journal of Engineering Education Research
    • /
    • v.27 no.1
    • /
    • pp.63-70
    • /
    • 2024
  • The capstone design classes in the College of Engineering are often team project-oriented, and teamwork skills are reported to positively impact problem-solving abilities. While team project courses have various advantages, they also come with challenges such as social loafing and issues related to free riders, which consistently hinder the positive effects of team project courses. To prevent these issues, there is a need to provide a clear evaluation-reward system for team members' contributions. In this study, we examined the reliability of peer evaluation scores for team members' contributions and reviewed methods to incorporate them into team project grades. The review results indicated that peer evaluation scores are deemed to have considerable reliability from a qualitative perspective. However, due to the relatively small team size in team project courses (3 to 6 members per team), using the arithmetic mean of peer evaluation scores is statistically challenging. As a complementary approach, this study proposes limiting the reflection ratio of peer evaluation scores and applying a more macroscopic processing method, not the arithmetic mean, to incorporate peer evaluation scores for team contributions into grades.

Study on the Appropriate Method Applying Gross Tons for Compensation for Damage of Coastal Fisheries in Case of Boat Change (연안어업의 어업손실보상시 어선대체로 인한 톤수변경의 경우 타당한 톤수적용 방안에 관한 연구)

  • Seo, Sang-Bok;Ryu, Dong-Gi
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.2
    • /
    • pp.31-45
    • /
    • 2011
  • Costal fisheries use small boat. The boats are frequently substituted with newly made boat or proper boat. When the boat which is substituted with another one after the fixed date for compensation is estimated for fisheries loss by public project, it is matter that which boat is the object for estimating average catch of fish. There are three ways in practical business. They are based on the date of spot probe, the date of conference for compensation and fixed date for compensation. In case of applying the first and the second ways, as the object of compensation is not fixed, there is problem that estimated result can be changed depending on changing boat tons even after the date of spot probe and the fixed date for compensation. Most of all, these ways are against Attached Form No.4 of the Enforcement Ordinance of Fisheries Law which regulate to calculate average catch of fish applying result of fishery for retroactively counted 3 years from the year before the year in which administrative measure day is. The other side, in applying boat tons based on the fixed date for compensation, estimated result of compensation will not change even boat substituted after the fixed date for compensation. Even though applying tons based on the fixed date for compensation, a problem still remains. If the boat get bigger after the fixed date for compensation, the then boat size must be applied for calculating average catch. But the boat get smaller, the changed boat size must be applied. Because changed small boat would be damaged less than the previous boat. And decrease in catch by changing boat into small one is not due to the project but due to the personal responsibility. This will help to increase objectivity and reliance on the compensation result. As the other objects are fixed based on the fixed date for compensation in the Act on Acquisition and Compensation of Land and Others for Public Project, it can be balanced with other object.