• Title/Summary/Keyword: project schedule

Search Result 613, Processing Time 0.025 seconds

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

Scenario Planning and Risk Failure Mode Effect and Analysis (RFMEA) based Management

  • Paul, Virendra Kumar;Basu, Chaitali
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.24-29
    • /
    • 2016
  • This paper elaborates the significance of scenario planning in risk management, and presents an integrated approach which takes into account the 'Risk Events' derived from scenario planning for risk prioritisation. This research integrates scenario planning with Risk Failure Mode and Effect Analysis (RFMEA) through examples from construction litigations of project schedule and cost overrun cases as a simplified approach to project risk management. The proposed methodology incorporates scenarios developed from realistic events of dispute and arbitration cases from construction projects, and thereby increasing potential to foresee risks and their effects well in advance. The results from this methodology shall be validated against outcome of survey study conducted by KPMG-PMI (2013) on project schedule and cost overruns that was based on Ministry of Statistics and Programme Implementation (MoSPI) Project Monitoring data for 2012-13.

A Study on the Cost Hierarchical System of Nuclaer Power Plant Construction Project for Introcusting Earned Vaule Management System (성과관리시스템(EVMS) 도입을 위한 원전 건설사업비 관리체계 세분화 방안에 관한 연구)

  • Lee, Sang-Hyun;Kim, Woo-Joong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.230-231
    • /
    • 2019
  • The nuclear power plant construction project is large-scale, has various stakeholders and computer system, and is produced and managed a large amount of information. The domestic nuclear power plant construction project has accumulated data based on many years of experience in the system. It has the competitiveness to suggeest alternatives that meet the requirement of the client in the overseas nuclear power plant project. Earned value management, which integrates schedule and cost, is possible to risk management. It was developed the earned value management system considering the the actual data properties and types of the preceding nuclear power plant construction projects. It will be able to increase the nuclaer power plant export competieiveness. Therefore, it was palned to carry out future stuies so that it be able to complement the measure to integrate cost and schedule in consideration of actual data(quantity of activity, etc.).

  • PDF

ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit (성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안)

  • Kang, Namhee;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.42-51
    • /
    • 2017
  • Measuring and evaluating project progress and performance are the key element of the construction project success. Construction progress is typically measured quantitatively by evaluating cost and time allocated to the project deliverable, and thus properly integrating cost and time is essential to the project management. This research was performed to propose an alternative methodology to integrate the cost and time and provide a framework for the progress measurement. The researchers developed a typical work process for the cost and schedule planning and also developed an alternative cost-schedule integration method by using progress integration units (PIU). A discipline of a construction phase served as a common level for WBS and CBS integration, so the PIUs'were defined under discipline. A case study project was selected to validate the developed methodology. The result showed the proposed method improved efficiency of cost and time integration. The result also showed the excluding material for the progress measurement purpose significantly reduced the bias of progress measurement.

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

A Study on Development of Algorithm and Load Balancing for detail scheduling (소일정 계획 수립을 위한 부하조정과 알고리즘 개발에 관한 연구)

  • 김정자;김상천;공명달
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.241-251
    • /
    • 1998
  • There are two methods of load balancing for detail scheduling : One method is to generate an initial schedule and obtain an improved final schedule by load balancing only during a specific period. The other method is to generate an initial schedule and obtain an improved schedule by load balancing from current date(TIMENOW) to unlimited time with the whole manufacturing processes. This paper proposes an algorithm for detail scheduling which can be a practical solution in job shop production or project job type by applying the former method.

  • PDF