Analyzing the Influential Relationship between PMO and Project Performance in Construction Industry: Focusing on Moderation Effect of PM Leadership (건설산업에서 프로젝트관리오피스(PMO)와 프로젝트성과의 영향관계 분석: PM리더십 조절효과 중심으로)

  • Lee, Heonchang;Park, Sohyun;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.133-145
    • /
    • 2021
  • Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.

A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects (공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안)

  • Hong, Sung Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.293-303
    • /
    • 2014
  • Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.

A Note on the Quantitative Approach to the Study of Community Design - Focused on the Relationship between Project Scale and Outcomes - (마을 만들기 연구의 정량적 접근에 관한 소고 - 마을 만들기 사업규모와 성과의 관계를 중심으로 -)

  • Kim, Dong-Yoon;Kim, Sun-Jick;Kang, Rae-Cheon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.2
    • /
    • pp.41-50
    • /
    • 2011
  • Skeptical responses to urban design based on the Physical Planning theory assuming the existence of social agreement and the absolute authorities of planners bring about alternatives such as Participatory Planning and Community Design derived from Harbermas' Communicative Rationality. But the normative contentions do not progress any more to the stage of presenting practical strategies. This is the cause why there should be systematic approaches to reveal the relationships among various concepts or variables. With regard to the Community Design this study intends to take a statistical approach to find relationship between project scale and its accomplishment. The hypothesis that the smaller scale of project begets the better outcomes was tested to be rejected as a result of the analysis of variance. But the result also shows that appropriate density in relatively large area makes residents' expected satisfaction high. Although this discovery has its own meaning the tryout is anticipated to laying the cornerstone of quantitative analyses in the following studies.

A Development of Cost Estimation Model for Data Quality Analysis and Improvement Project (DB 품질개선사업의 대가 산정 모형연구)

  • Seo, Yong Won;Lee, Duck Hee;Jung, Seung Ho;Park, Kun Soo
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.51-68
    • /
    • 2015
  • As interests in the quality of data in database systems are growing recently, analysis and improvement of data quality in databases have been an important issue. However, there has yet to be a clear agreement on how to reasonably calculate the total cost of such project. In this paper, based on real project data and budget statistics, we develop a model to estimate the cost for quality analysis and improvement project of a database. We first conduct statistical analysis to build our basic model. Throughout this analysis, we have identified factors that determine the scale of works required to conduct the project and eventually determine the cost. In addition, we have identified factors that determine the complexity of the project. These factors can adjusts the cost determined by the scale of works. Our model is verified and improved by surveys on experts. We apply our model to newly conducted projects and observe that our model estimates the cost of each project reasonably well.

A Study on the Comparison and Application of the Methods of Measuring Projects'Progress (프로젝트 진도 측정 방법의 비교와 적용에 관한 연구)

  • Min, Taek-Kee;Song, Chang Yong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.3
    • /
    • pp.87-94
    • /
    • 2013
  • The progress that becomes a basis for measuring the outcome of project is a core of project control. Follow-up corrective actions are determined depending on the degree of their differences. The methods of measuring the project progress have been developed though a variety of research and many were verified through the cases. Among such methods, this study selected Start/Finish method and Fixed Formula method. In order to check the limitations of the progress utilized in the two methods, the study compared their progresses to the progress of Percentage Complete method and analyzed the differences shown in their actual applications. Through this, it suggested the forms and scale of the projects appropriate to the application of Fixed Formula method. As for the research progress method, the study first generated a number of virtual project schedules for the establishment of an analysis model. These project schedules were varied in a way that they had different project periods and the number of different activities. The study also generated numerous project schedules for difference test. After establishing a virtual schedule plan by the scale of projects, it measured their progresses by period, analyzed the differences and repeated this procedure to obtain the results.

The Effects of Scope Management on Process Performance and Output Performance in the Information System Development Project : An Analysis from Project Supplier's Perspective (공급자 관점에서 정보시스템 개발 프로젝트의 범위관리활동이 프로세스성과와 결과물성과에 미치는 영향에 대한 연구)

  • Park, Bong-Gu;Lim, Gyoo-Gun;Yoo, Weon-Sang
    • Journal of Information Technology Services
    • /
    • v.8 no.3
    • /
    • pp.83-100
    • /
    • 2009
  • Even though the success of the information system (IS) protect becomes a critical issue to an enterprise and there has been a lot of research about finding critical success factors of IS projects, the scope management for the success of IS protect has received little attention in the literature. The purpose of this research is to investigate the effects of the project scope management activities defined by PMI (Project Management Institute) on the performance of the information system project. The focus of this paper is on the project supplier's point of view. This study shows the priority of the scope management activities during the IS Project. The results show the different results depending on the types of the project clients and the project scale. This research reveals that the scope verification is important for the project supplier from the project process view, and that the scope planning/definition is important for the protect client from the project result view. It also shows different results comparing to the conventional recognition about project success. The research results show that the positive relationships between the project scale and the importance of scope management activities, and between the familiarity of suppliers and clients and the importance of the scope management activities. Through this research, we expect that the importance of the scope management in a project will be considered as an important issue, and that this research will lead to various detailed research about this issue.

Research on a Streamlined Software Project Management Model for Small-sized Software Enterprises (소규모 소프트웨어 업체를 위한 간략화 된 프로젝트 관리 모델에 관한 연구)

  • Lee, Jeong-Eun;Park, Ju-Chull
    • IE interfaces
    • /
    • v.21 no.2
    • /
    • pp.198-208
    • /
    • 2008
  • Effective management of a project is a crucial issue to software companies. There are various international standards, such as CMM, ISO9000, and SPICE, applied to project management. But, small scale companies have some difficulties in accepting those standards because of its complexity and enormous manpower requirements. This study proposes a project management approach streamlining the CMM by which a small scale software company can perform the tasks with ease. A prototype system has also been developed to show the capability of the proposed model.

Multi-Dimensional Hybrid Design and Construction of Skyscraper Cluster -Innovative Engineering of Raffles City Chongqing-

  • Wang, Aaron J.
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.3
    • /
    • pp.261-269
    • /
    • 2017
  • Designed by star architect of Moshes Safdie, Raffles City Chongqing includes a total of 6 mega high-rise towers 250 to 380 m tall, a sky conservatory, a 5-storey high shopping mall and a 3-storey basement car parking. Located at the confluence of the Yangtze and Jailing Rivers, the site for the project is imbued with a significance that is immediately symbolic, both as a sign of Chongqing's important past and as a vivid indicator of the city's thriving present and future. The design for the project to be situated at this gateway takes as its governing idea the image of powerful sails upon the water. The outer facades of the project's eight towers - the transparent surfaces that will face the water to the north - are meant to recall a fleet of ancient Chinese ships, with their huge rectangles of white canvas filled by the wind. This is a $1.13million\;m^2$ mega scale integrated project of office, retail, hotel, service residence and high-end residence with the transportation hub and traffic circulation at various levels of the project. This paper presents the multi-dimensional hybrid design, engineering and construction of this mega scale project. The innovations and the cutting-edge technology used in this project are introduced and discussed benchmarking the design and construction of the skyscraper cluster in a major city like Chongqing of China.

Effect of East-West pain treatment for Central Poststroke Pain on alleviation of pain and Rehabilitation (뇌졸중 후 중추성 통증 환자에 대한 동서협진이 진통과 재활에 미치는 영향)

  • Lee, Hyun-jong;Kim, Su-young;Lee, Sang-hoon;Seo, Dong-min;Lee, Doo-ik;Kim, Keun-sik;Lee, Jae-dong;Lee, Yun-ho;Yang, Hyung-in;Park, Jae-kyung;Choi, Do-young
    • Journal of Acupuncture Research
    • /
    • v.20 no.2
    • /
    • pp.42-49
    • /
    • 2003
  • Purpose : In order to study the effectiveness of East-West pain treatment on central poststroke pain(CPSP), we evaluated its effect on alleviation of pain and rehabilitation of CPSP patients who were treated with eletroacupuncture and west pain treatment for four weeks. Methods : Twenty four patients diagnosed by their pain characteristics of central pain form stroke were treated with sympathetic nerve block, gabapentin, amitriptyline, and electroacupuncture for four weeks. Pain intensity through the visual analogue scale(VAS), and improvements of mobility and rehabilitation through the modified Barthel index(MBI) and Rankin scale(RS), respectively, before and after pain treatment were also assessed. Results : VAS pain scores were significantly improved from $7.7{\pm}1.7$ to $4.4{\pm}2.0$ with pain treatment(p<0.05). In accordance with improvement of ain scores, RS and MBI scores ere also improved from $2.88{\pm}0.95$ to $2.13{\pm}1.01$ and from $83.0{\pm}16.9$ to $94.7{\pm}9.5$(p<0.05), respectively, with pain treatment(p<0.05). Conclusions : It was suggested that the active pain treatment was contributed to the rehabilitation of CPSP patients, resulting in improvement of quality of life of CPSP patients. Futhermore, East pain treatment in combination with West pain treatment may be useful modality to alleviate CPSP.

  • PDF

Efficiency Analysis of Project Management Offices Using Bootstrap DEA (부트스트랩 자료포락분석을 이용한 프로젝트 관리 조직의 효율성 분석)

  • Ko, Joong-Hoon;Park, Sung-Hun;Bae, Eun-Song;Kim, Dae-Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.61-71
    • /
    • 2018
  • The purpose of this study is to analyze the efficiencies of project management offices in large information system construction projects using the data envelopment analysis. In addition, we tried to estimate the confidence interval of those efficiencies using bootstrap DEA to give a statistical meaning. The efficiency by the CCR model is analyzed as eight project management offices are fully efficient and 22 project management offices are inefficient. On the other hand, there are 15 project management offices are fully efficient, but 15 project management offices are inefficient in the BCC model. As the result of the scale efficiencies, of the inefficient project management offices, 13 project management offices are inefficient in scale. It is possible to eliminate the inefficiency in the CCR model by improving their project performances. And, the nine project management offices showed that the inefficiency was due to pure technical efficiency, and these companies should look for various improvements such as improvement of project execution system and project management process. In order that the inefficient project management offices be efficient, it is analyzed that more efforts must be made for on-budget and on-time as a result of examining the potential improvement potentials of inefficient project management offices.