• Title/Summary/Keyword: project process

Search Result 4,167, Processing Time 0.028 seconds

The Effect of Project Learning Utilizing Prezi on Creativity, Science Process Skills and Attitudes Toward Science of Scientific Gifted Children in Elementary School (Prezi를 활용한 프로젝트 수업이 초등과학영재반 학생들의 창의성, 과학탐구능력 및 과학에 대한 태도에 미치는 영향)

  • Cho, Hye-Jin;Lee, Hyeong-Cheol
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.6 no.1
    • /
    • pp.50-59
    • /
    • 2013
  • Prezi, which is an implemented software in the form of flash-based online presentation, is considered to be a new appropriate smart-learning tool. This study aimed to investigate an impact of project learning utilizing Prezi on the creativity, attitudes toward science and science process skills of scientific gifted children in elementary school. The results of this study were as follows; First, after project learning utilizing Prezi, their creativity was raised meaningfully, especially in sub-elements of patience, adaptability and variety of interestings. Second, project learning utilizing Prezi showed meaningful effect on their improvement of science process skill, especially in integrated science process skills. Third, project learning utilizing Prezi improved their attitudes toward science meaningfully. In almost sub-elements, except the element of ordinariness of scientist, positive meaningful improvements were showed.

ANALYZING EFFECTIVE FACTOR OF THE CHANGE MANAGEMENT BASED ON URBAN REGENERATION PROJECT IN REPUBLIC OF KOREA

  • Jae-Pil Seo;Yoon-Ki Choi;Bo-Sik Son;Han-Guk Ryu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.591-596
    • /
    • 2011
  • There are quite a number of business processes in the urban regeneration project. Managers and participants who involved in the project make and use information for the best way to perform in the particular business process. The information can be also reused and produced for data at the next stage. Accordingly, the information sometimes goes out of existence and work data up into new information when the urban regeneration project has been accomplished. But in that case some of changes happen occasionally, the business for urban regeneration has suffered a loss of profit and time as result of confusions about decisions and inappropriate action. For that reason, the information should be analyzed to achieve its aim at the business process under the influence of changes. Then, even though detail processes and management method change, the Core Information, which are important factors for accomplishing the project, help that the project can be operated to solve the problem about confusion and loss of the business. In conclusion, the Core Information is main effective factors for successful urban regeneration projects on the change management. The purpose of this study is to research the information according to the Information-flow and changes, and to find out the influence factors and the Core Information to manage efficiently at the process of urban regeneration projects.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

Earned Value Management base on System Engineering Process in the Weapon R&D Project (무기체계개발 사업에서 체계공학 프로세스 기반 사업성과관리 수행 방안)

  • Kuk, Seung Hak;Kim, Yun Hee;You, YI Ju
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.2
    • /
    • pp.51-59
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a performing method for EVM based on system engineering process.

Optimal Implementation of the Value Management Processes for Capital Facility Projects (건설산업에서의 가치경영 프로세스 효율적 활용 방안)

  • Cha, Hee-Sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.89-94
    • /
    • 2004
  • Many innovative management processes, which are also termed as best practices or value improving practice, have been proven to successfully improve the value of capital facility projects. With a lack of any guidance on how to implement the most suitable value management process for a particular project, the objective of this paper is to facilitate the VMP implementation. A CII (Construction Industry Institute)'s recent study, titled as 'Development of the Value Management Toolkit,' encompasses a comprehensive structure of value management and provides a new methodology in optimizing the implementation of the value management processes in order to leverage the unique project circumstances, such as project objectives, resource availability, and site limitations, etc. As a pioneering study, the findings contribute to the expedition of implementing value management processes in the industry and maximize the potential benefits in applying the most benefiical value management process for a particular capital facility project.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Holistic, Collaborative, Ecological, and Coevolutionary Characteristics of Service Design Process

  • Lee, Dong-Seok
    • Journal of the Ergonomics Society of Korea
    • /
    • v.31 no.1
    • /
    • pp.7-13
    • /
    • 2012
  • Objective: This paper discussed the characteristics of service design process by comparing with product design process. Background: Service design has different design outcomes, project participants, and design constraints than product design. Method: The comparison took two perspectives: one was shorter-term, design process of a service, and the other was longer-term, process of service development. Results: It was discussed that service design process is similar in overall, but has four differences. First, the role of design is required earlier and longer in the process, which means service designers need to participate from the begging of the project to service operation. Thus service designers are required to have holistic viewpoint of the project. Second, service design requires many design expertise thus collaboration needs to be well defined and managed throughout the process. Third, since service provider has limited resources, regulations, and market competition, some service features cannot be provided. Service designers are required to know both customers' needs and functional constraints. Last, service design is highly coupled with service operation. Designing and providing service happens at the same time and evolves over time. Conclusion: Consequently it was asserted that the role of designers in service design is essential for success. In specific, the role of service design architect, who manages design process and design outcomes, is a new and important role in service design project.

An Integrated On-Line Diagnostic System for the NORS Process of Maiden Reactor Project: The Design Concept and Lessons Learned

  • Kim, Inn-Seock
    • Nuclear Engineering and Technology
    • /
    • v.32 no.3
    • /
    • pp.261-273
    • /
    • 2000
  • During an extensive review made as part of the Integrated Diagnosis System project of the Maiden Reactor Project, MOAS (Maryland Operator Advisory System) was identified as one of the most thorough systems developed thus far. MOAS is an integrated on-line diagnosis system that encompasses diverse functional aspects that are required for an effective process disturbance management: (1) intelligent process monitoring and alarming, (2) on-line sensor data validation and sensor failure diagnosis, (3) on-line hardware (besides sensors) failure diagnosis, and (4) real-time corrective measure synthesis. The MOAS methodology was used at the Maiden Man-Machine Laboratory HAMMLAB of the OECD Maiden Reactor Project. The performance of MOAS, developed in G2 real-time expert system shell for the high-pressure preheaters of the NORS process in the HAMMLAB, was tested against a variety of transient scenarios, including failures of the control valves and sensors, and tube leakage of the preheaters. These tests showed that MOAS successfully carried out its intended functions, i.e., quickly recognizing an occurring disturbance, correctly diagnosing its cause, and presenting advice on its control to the operator. The lessons learned and insights gained during the implementation and performance tests also are discussed.

  • PDF